DK79 Zwoleń bypass – design & build incl. junction with planned S12 and renovation of existing DK79; Aldesa-led consortium selected (PLN 190.7M)
ترسية عقد – Poland
Road designers, earthworks, asphalt and drainage subcontractors: Aldesa's consortium is set to sign the 42-month Zwoleń bypass D&B contract in Q1 2027.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Poland · Zwoleń (Mazowieckie) |
| Client / owner | GDDKiA Warszawa |
| Awarded to | Aldesa Construcciones (consortium leader) |
| Value | PLN 190.7M |
| Announced | 22 Oct 2026 |
| Project type | Roads & highways |
Trades and packages needed
- Roads, asphalt paving & road marking (main package)
- Earthworks, excavation & site grading (main package)
- Storm-water drainage & culverts
- Bridge & flyover construction
- Structural & civil design
- Ready-mix concrete, cement & aggregates
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.