DP World Luanda container terminal – design & build upgrade of 610 m quay wall (120 x 1.0 m piles up to 45 m, back beam, STS crane rails, quay substations and utilities) awarded to EDECS Group
ترسية عقد – Angola
EDECS now buys piling, pile testing, ready-mix, rebar, crane-rail and quay electrical/fire packages for DP World's Luanda quay upgrade; piling, marine and E&I subcontractors should approach EDECS.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Angola · Luanda |
| Client / owner | DP World Luanda (Port of Luanda) |
| Awarded to | EDECS Group |
| Announced | 16 Nov 2026 |
| Project type | Ports, harbours & marine works |
Trades and packages needed
- Piling & deep foundations (main package)
- Marine works, dredging & reclamation (main package)
- Concrete works (in-situ) (main package)
- Rebar cutting, bending & fixing
- Ready-mix concrete, cement & aggregates
- Materials testing & QA/QC laboratory
- MV/HV substations & transmission lines
- Cables, switchgear & electrical materials
- Fire protection & fire alarm
- Equipment & crane rental
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.