Dugo Selo–Novska 83 km railway reconstruction and second track (160 km/h, 4 stations, 30+ level crossings removed)
ترسية عقد – Croatia
Track, signalling, catenary, bridge and earthworks subcontractors and rail material suppliers should engage Afcons on this EUR 677M EU-funded corridor, works from H1 2027.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Croatia · Dugo Selo – Novska |
| Client / owner | HŽ Infrastruktura |
| Awarded to | Afcons Infrastructure (works); Eptisa Adria (supervision) |
| Value | EUR 677M |
| Announced | 01 Oct 2026 |
| Project type | Rail & metro, Bridges & tunnels |
Trades and packages needed
- Railway track & systems installation (main package)
- Earthworks, excavation & site grading (main package)
- Bridge & flyover construction (main package)
- Concrete works (in-situ)
- Precast & prestressed concrete
- Piling & deep foundations
- Storm-water drainage & culverts
- ELV, ICT & security systems (CCTV, access, cabling)
- MV/HV substations & transmission lines
- Roads, asphalt paving & road marking
- Steel, rebar & structural sections supply
- Ready-mix concrete, cement & aggregates
- Equipment & crane rental
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.