Embosal integrated 1.2 Mtpa hot-rolled coil (HRC) steel plant – scrap melting, slab casting, reheating & hot rolling
مصنع إمبوسال المتكامل لإنتاج 1.2 مليون طن سنوياً من لفائف الصلب المدرفلة على الساخن – رأس الخيمة
Steel-mill technology suppliers, industrial EPC contractors and structural/foundation subcontractors should engage Embosal early; production is targeted for end-2027.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | UAE · Ras Al Khaimah |
| Client / owner | Embosal (Embosal Steel Mills) |
| Announced | 19 Oct 2026 |
| Project type | Factories & industrial plants |
Trades and packages needed
- Mechanical erection & equipment installation (main package)
- Structural steel fabrication & erection (main package)
- Electrical & instrumentation (E&I) installation (main package)
- Concrete works (in-situ)
- Piling & deep foundations
- Heavy lifting, rigging & transport
- Refractory works
- MV/HV substations & transmission lines
What to do
Early stage – get on the client's or bidders' vendor lists now.