Eraun oil field development – well rehabilitation and new drilling, 10,000 bpd early production facility, gathering pipelines and water wells
تطوير حقل إراون النفطي – تأهيل وحفر آبار ومرفق إنتاج مبكر بطاقة 10,000 برميل يومياً وخطوط تجميع
Early-production-facility packagers, flowline contractors and drilling/water-well service firms should position with Zallaf for the Eraun field development in the Murzuq Basin.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Libya · Murzuq Basin |
| Client / owner | Zallaf Oil Exploration and Production Company |
| Announced | 16 Oct 2026 |
| Project type | Oil, gas & petrochemical plants, Pipelines & utility networks |
Trades and packages needed
- Pipeline construction (main package)
- Mechanical erection & equipment installation (main package)
- Process piping fabrication & welding (main package)
- Pressure vessels, tanks & heat exchangers
- Electrical & instrumentation (E&I) installation
- NDT, inspection & certification
- Camps, temporary facilities & catering
- Equipment & crane rental
What to do
Early stage – get on the client's or bidders' vendor lists now.