Fort Simpson LNG combined generation plant – 2 x 1.6 MW LNG gensets, LNG storage & vaporisation, bi-fuel boiler, diesel storage, substation
تأهيل مسبق – Canada
Remote-power EPCs, genset and small-scale LNG storage/vaporisation suppliers: CAD 42M funded plant to replace Fort Simpson's flood-exposed diesel station.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Canada · Fort Simpson |
| Client / owner | Northwest Territories Power Corporation (NTPC) / GNWT |
| Value | CAD 42M |
| Announced | 19 Oct 2026 |
| Project type | Power plants & renewables |
Trades and packages needed
- Mechanical erection & equipment installation (main package)
- Generators, UPS & standby power (main package)
- Pressure vessels, tanks & heat exchangers (main package)
- MV/HV substations & transmission lines
- Electrical & instrumentation (E&I) installation
- Process piping fabrication & welding
- Concrete works (in-situ)
What to do
Early stage – get on the client's or bidders' vendor lists now.