Hangyu Technology forging plant for industrial/aerospace components (up to EUR 105M) relocated from Slovakia to Tanger Tech – board approval
مصنع حدادة لشركة هانغيو للتكنولوجيا لمكونات صناعية وطيران (حتى 105 ملايين يورو) ينقل من سلوفاكيا إلى طنجة تك – موافقة مجلس الإدارة
Industrial-building contractors and heavy-equipment installers should approach Hangyu early; the Tangier forging plant is at land-LOI/permitting stage.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Morocco · Tangier (Cité Mohammed VI Tanger Tech) |
| Client / owner | Hangyu Technology (Atlas Advanced Materials LLC) |
| Value | EUR 105M |
| Announced | 09 Oct 2026 |
| Project type | Factories & industrial plants |
Trades and packages needed
- Pre-engineered & modular buildings (main package)
- Mechanical erection & equipment installation (main package)
- Structural steel fabrication & erection
- Concrete works (in-situ)
- Heavy lifting, rigging & transport
- Electrical installation (LV)
What to do
Early stage – get on the client's or bidders' vendor lists now.