Kangean Energy – EPCI onshore flowlines for wells PGR-6/7/8, onshore facilities & tie-in point, Rancak field – prequalification (20260113/11140/CON/E&P/VII/CIVD)
تأهيل مسبق – Indonesia
Indonesian onshore oil & gas construction firms with pipe and mechanical track record should register quickly for this Rancak onshore EPCI prequalification.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – closes 26 Oct 2026 (1 day) |
| Country | Indonesia · Sumenep |
| Client / owner | Kangean Energy Indonesia Ltd (KEI) / SKK Migas |
| Announced | 21 Oct 2026 |
| Deadline | 26 Oct 2026 |
| Project type | Oil, gas & petrochemical plants, Pipelines & utility networks |
Trades and packages needed
- Process piping fabrication & welding (main package)
- Pipeline construction (main package)
- Mechanical erection & equipment installation (main package)
- Concrete works (in-situ)
- Electrical & instrumentation (E&I) installation
- Pipes, valves & fittings supply
- NDT, inspection & certification
- MEP & process design engineering
What to do
Early stage – get on the client's or bidders' vendor lists now.