Katowice Brynów–Kostuchna tram line (~9.7 km double track) with Kostuchna interchange – 14 bids, Budimex lowest
تأهيل مسبق – Poland
Track, traction power/substation, road and structures subcontractors should position with Budimex (lowest of 14 bids, PLN 356.8M gross) ahead of formal award.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Poland · Katowice |
| Client / owner | Tramwaje Śląskie |
| Value | PLN 356.8M |
| Announced | 15 Oct 2026 |
| Project type | Rail & metro, Roads & highways |
Trades and packages needed
- Railway track & systems installation (main package)
- Roads, asphalt paving & road marking (main package)
- MV/HV substations & transmission lines
- Bridge & flyover construction
- Earthworks, excavation & site grading
- Storm-water drainage & culverts
- Water, sewer & utility networks (incl. HDD)
What to do
Early stage – get on the client's or bidders' vendor lists now.