Mälarbanan railway technical design services – 2 packages: track & switch renewal, AT contact-line conversion, M95 interlockings at 10 sites (Kallhäll–Tortuna); Västerås switches & interlockings
مناقصة – Sweden
Railway design consultancies with track, catenary and signalling expertise can bid for Trafikverket's Mälarbanan design packages before the 15 January 2027 deadline.
| Type | Open tender |
|---|---|
| Status | Open – closes 15 Jan 2027 (65 days) |
| Country | Sweden · Kallhäll–Tortuna / Västerås |
| Client / owner | Trafikverket |
| Value | SEK 80M |
| Announced | 09 Nov 2026 |
| Deadline | 15 Jan 2027 |
| Project type | Rail & metro |
Trades and packages needed
- Structural & civil design (main package)
- MEP & process design engineering (main package)
- Railway track & systems installation
- BIM, digital engineering & 3D scanning
What to do
Register with the client and request the tender documents before the deadline.