Mirfa–Liwa water scheme – transmission system from Mirfa plus distribution networks to farms and settlements in Abu Dhabi's western region
مشروع مياه المرفأ–ليوا – نظام نقل المياه من المرفأ وشبكات توزيع للمزارع والتجمعات السكنية في المنطقة الغربية بأبوظبي
Water pipeline contractors and pipe, pump and valve suppliers should position with TAQA as the Mirfa–Liwa transmission and distribution scheme moves forward.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | UAE · Al Dhafra (Mirfa–Liwa) |
| Client / owner | TAQA (Abu Dhabi National Energy Company) |
| Announced | 20 Oct 2026 |
| Project type | Pipelines & utility networks, Water, desalination & treatment |
Trades and packages needed
- Pipeline construction (main package)
- Water, sewer & utility networks (incl. HDD) (main package)
- Pipes, valves & fittings supply (main package)
- Earthworks, excavation & site grading (main package)
- HVAC, pumps & mechanical equipment supply
- Cathodic protection
What to do
Early stage – get on the client's or bidders' vendor lists now.