MOP flood-damage reconstruction programme – 166 works (~USD 321M): road repairs (44 intermediate-damage Vialidad contracts by direct invitation), river channelling, rural sanitation, coves/ports, studies & designs for 8+ bridges
تأهيل مسبق – Chile
Chilean road, hydraulic and bridge contractors and design consultancies should register with MOP for the reconstruction contracts and bridge design studies in Atacama and Coquimbo.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Chile · Atacama & Coquimbo regions |
| Client / owner | Ministerio de Obras Públicas (MOP) Chile |
| Value | USD 321M |
| Announced | 04 Nov 2026 |
| Project type | Roads & highways, Bridges & tunnels, Water, desalination & treatment |
Trades and packages needed
- Roads, asphalt paving & road marking (main package)
- Earthworks, excavation & site grading (main package)
- Storm-water drainage & culverts
- Bridge & flyover construction
- Marine works, dredging & reclamation
- Water, sewer & utility networks (incl. HDD)
- Structural & civil design
What to do
Early stage – get on the client's or bidders' vendor lists now.