MSP Airport Terminal 1 central utility plant replacement + Concourse C gates C6–C11 rebuild – CMAR (USD 480M)
ترسية عقد – United States
HVAC, boiler/chiller, mechanical and electrical subcontractors should approach JE Dunn on the long-lead equipment and MEP packages for this phased central-plant replacement at an operating airport.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | United States · Minneapolis |
| Client / owner | Metropolitan Airports Commission |
| Awarded to | JE Dunn Construction (CM-at-risk) |
| Value | USD 480M |
| Announced | 22 Oct 2026 |
| Project type | Airports |
Trades and packages needed
- HVAC & ventilation (main package)
- District cooling & chilled-water plants (main package)
- HVAC, pumps & mechanical equipment supply (main package)
- Electrical installation (LV) (main package)
- Plumbing & sanitary
- BMS, controls & SCADA
- Demolition & dismantling
- Concrete works (in-situ)
- Structural steel fabrication & erection
- Fire protection & fire alarm
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.