Musaffah road upgrades – ~13 km of E30 & 8th Street, new free-flow highway, 4 interchanges, 9 junctions, 2 road bridges + pedestrian bridge (planned)
تطوير طرق مصفح – نحو 13 كم على شارع E30 والشارع الثامن، طريق سريع حر الحركة، 4 تقاطعات متعددة المستويات، 9 تقاطعات، جسران وجسر مشاة (مخطط)
Early-stage Abu Dhabi highway and bridge programme; road contractors, bridge builders and design/supervision consultants should position with DMT before tendering.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | UAE · Abu Dhabi (Musaffah) |
| Client / owner | Department of Municipalities and Transport (DMT), Abu Dhabi |
| Announced | 11 Oct 2026 |
| Project type | Roads & highways, Bridges & tunnels |
Trades and packages needed
- Roads, asphalt paving & road marking (main package)
- Bridge & flyover construction (main package)
- Earthworks, excavation & site grading (main package)
- Concrete works (in-situ)
- Precast & prestressed concrete
- Piling & deep foundations
- Storm-water drainage & culverts
- Water, sewer & utility networks (incl. HDD)
- Street, area & sports lighting
- Site security & traffic management
- Structural & civil design
What to do
Early stage – get on the client's or bidders' vendor lists now.