1712 live leads · 55 new today · updated 24 Oct 2026Contactمناقصات يومية مجانية
Tender Leads DailyConstruction tenders & awards · every morning

Today › Oman

Open tender

New Somhan pump station suction pipe replacement, Barka / South Al-Batinah – Nama Water Services tender T/OW/T/10102/2026

استبدال أنبوب السحب في محطة ضخ صمحان الجديدة في بركاء / جنوب الباطنة – مناقصة شركة نماء لخدمات المياه رقم T/OW/T/10102/2026

Water-utility piping contractors and pipe/valve suppliers can bid the Somhan pump-station suction pipe replacement in Barka.

TypeOpen tender
StatusOpen – closes 23 Nov 2026 (30 days)
CountryOman · Barka
Client / ownerNama Water Services
Announced12 Oct 2026
Deadline23 Nov 2026
Project typeWater, desalination & treatment, Pipelines & utility networks

Trades and packages needed

What to do

Register with the client and request the tender documents before the deadline.

Read the official source → Report a correction

Related live opportunities

Open tenderUAE · الإماراتUSD 800MOpen – deadline not published

Adnoc Onshore Bab gas cap well tie-in project – bids sought for tie-in of gas-producing and gas-injection wells (USD 800M+)

Client: ADNOC Onshore

Contract awardSaudi Arabia · السعوديةAED 2.8bnContract awarded – subcontracting open

Three Aramco offshore EPC projects awarded to NMDC Energy (AED 2.8bn, 18–23 months)

Awarded to NMDC Energy · Client: Saudi Aramco

Contract awardIraq · العراقContract awarded – subcontracting open

Two 125 MW combined-cycle units at South Baghdad gas power station and Khor al-Zubair – under construction by Dongfang Electric, service targeted before summer 2027

Awarded to Dongfang Electric · Client: Ministry of Electricity, Iraq

Contract awardPeruUSD 122MContract awarded – subcontracting open

Puerto Maldonado wastewater treatment plant PPP (400 l/s) + sewer network expansion and up to 25,000 connections – construction starts (USD 122M)

Awarded to Consorcio Saneamiento Puerto Maldonado (Mota-Engil Perú, Mota-Engil Capital, BTD) · Client: ProInversión

Contract awardUnited KingdomGBP 26.8MContract awarded – subcontracting open

Havant Thicket Reservoir – Farlington pumping station and 8.5 km transfer pipeline (32.4 Ml/d) awarded to Clancy (GBP 26.8M)

Awarded to Clancy · Client: Portsmouth Water

Want more leads like this?Get Process piping fabrication & welding, Water, sewer & utility networks (incl. HDD) opportunities in your inbox every morning.
Get free alerts →