Nonowie 1.2 GW wind farm (126 turbines up to ~9.5 MW) with two 8-hour batteries (600 MW / 4,800 MWh) and possible 25 km 275 kV line to Cultana substation – revised layout, seeking planning approval
تأهيل مسبق – Australia
Wind BOP civil, heavy-lift and HV contractors in South Australia should position early with Tilt Renewables on the 1.2 GW Nonowie wind-plus-storage project near Whyalla.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Australia · Whyalla, South Australia |
| Client / owner | Tilt Renewables |
| Announced | 30 Oct 2026 |
| Project type | Power plants & renewables, Substations & transmission grids |
Trades and packages needed
- Concrete works (in-situ) (main package)
- Earthworks, excavation & site grading (main package)
- Heavy lifting, rigging & transport (main package)
- MV/HV substations & transmission lines (main package)
- Solar PV & battery storage
- Roads, asphalt paving & road marking
- Equipment & crane rental
- Cables, switchgear & electrical materials
- Ready-mix concrete, cement & aggregates
- Rebar cutting, bending & fixing
What to do
Early stage – get on the client's or bidders' vendor lists now.