North Kabd wastewater treatment plant (500,000 m3/day, expandable to 1M m3/day) with pumping stations at Al-Shaddadiya, Al-Jahra and Mishref, pipelines and deep-injection network – foundation stone laid
محطة معالجة مياه الصرف الصحي في شمال كبد (500 ألف م3/يوم قابلة للتوسعة إلى مليون م3/يوم) مع محطات ضخ في الشدادية والجهراء ومشرف وخطوط أنابيب وشبكة حقن عميق – وضع حجر الأساس
Process-equipment, pump, E&I and solar subcontractors can approach CSCEC, which broke ground on Kuwait's North Kabd wastewater treatment plant.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Kuwait · Kabd |
| Client / owner | Ministry of Public Works, Kuwait |
| Awarded to | China State Construction Engineering Corporation (CSCEC) |
| Announced | 26 Oct 2026 |
| Project type | Wastewater & sewage, Pipelines & utility networks |
Trades and packages needed
- Water & wastewater treatment equipment (main package)
- Concrete works (in-situ) (main package)
- Water, sewer & utility networks (incl. HDD) (main package)
- Mechanical erection & equipment installation (main package)
- Process piping fabrication & welding
- Electrical & instrumentation (E&I) installation
- BMS, controls & SCADA
- Solar PV & battery storage
- Pressure vessels, tanks & heat exchangers
- Earthworks, excavation & site grading
- Pipes, valves & fittings supply
- HVAC, pumps & mechanical equipment supply
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.