NYC Transit traction power – design of repairs/replacements at 10 subway substations and 12 circuit breaker houses (four boroughs), incl. regenerative-braking energy recuperation study
ترسية عقد – United States
Traction-power, HV switchgear and MEP specialists should track this design phase; drawings due by 2029 feed future MTA substation construction contracts under a ~USD 3bn traction power programme.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | United States · New York |
| Client / owner | Metropolitan Transportation Authority (MTA) |
| Awarded to | STV |
| Value | USD 28M |
| Announced | 04 Nov 2026 |
| Project type | Rail & metro, Substations & transmission grids |
Trades and packages needed
- MEP & process design engineering (main package)
- Structural & civil design
- Land surveying & geotechnical investigation
- BIM, digital engineering & 3D scanning
- MV/HV substations & transmission lines
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.