Tender Leads DailyConstruction tenders & awards · every morning

Today › United States

Pre-qualification / EOI

Plains Oryx Permian Basin JV – crude oil gathering system expansion for ~270,000 newly dedicated acres (~225,000 bpd gross) under 10-year agreements, first volumes Q4 2027

تأهيل مسبق – United States

Permian gathering-line contractors, tank and pump-station builders and pipe/valve suppliers: new 225,000 bpd gathering build-out targeting Q4 2027 start-up.

TypePre-qualification / EOI
StatusOpen – deadline not published
CountryUnited States · Midland Basin, Texas
Client / ownerPlains All American Pipeline (Plains Oryx Permian Basin LLC)
Announced09 Nov 2026
Project typePipelines & utility networks, Oil, gas & petrochemical plants

Trades and packages needed

What to do

Early stage – get on the client's or bidders' vendor lists now.

Read the official source → Report a correction

Related live opportunities

Pre-qualification / EOIUnited StatesUSD 1.11bnOpen – deadline not published

Boardwalk Kosciusko Junction Pipeline Project – 103 mi 36-inch loop of Gulf South 42-inch line plus 8 mi Columbia Gulf Lateral, new Kosciusko (51,554 hp) & Holmes compressor stations, Isola expansion, 4 M&R stations (1.175 MMDth/d); FERC staff authorised construction 6 Nov 2026

Client: Gulf South Pipeline Co. / Texas Gas Transmission (Boardwalk Pipelines)

Contract awardIndiaUSD 26.14MContract awarded – subcontracting open

ONGC PRP-X project – subsea installation works subcontract from L&T Energy Hydrocarbon (USD 26.14M, completion May 2027)

Awarded to Consortium of SEAMEC Ltd and Posh India Offshore Pvt Ltd · Client: Larsen & Toubro – Energy Hydrocarbon (for ONGC)

Pre-qualification / EOIKenyaKES 50.6bn (~USD 389M)Open – deadline not published

Mzima II water supply pipeline PPP (BOT, 30 yrs) – ~220 km, 1,200 mm bulk main, 105,000 m³/day, intake, pumping stations and reservoirs; Sichuan Road and Bridge Group identified as proposed private developer

Client: Coast Water Works Development Authority / National Treasury PPP Directorate

Pre-qualification / EOIIndiaINR 20,000 crore (~USD 2.3bn)Open – deadline not published

Marathwada Water Grid Phase 1 – 3,095 km main & secondary pipelines and 15 WTPs linking six dams; JICA positive on ~INR 20,000 crore loan, PMC and DPR to follow

Client: Government of Maharashtra (JICA-financed)

Pre-qualification / EOINamibiaUSD 2.5bnOpen – deadline not published

Dangote Walvis Bay fuel terminal – 600 million-litre storage (360 ML diesel, 240 ML petrol) on ~70 ha, ~16 km jetty-to-tank pipeline; planned ~1,700 km regional product pipeline – groundbreaking held

Client: Dangote Group (Office of the President coordinating; Afreximbank possible financier)