Prequalification: Construction of Gelephu–Tareythang roads and bridges, Southern East-West Highway Package-I (Ch 0.0–3,868 m)
تأهيل مسبق – Bhutan
Road and bridge contractors active in South Asia should submit prequalification for this World Bank-financed highway package in Bhutan by 2026-10-22.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – closes 22 Oct 2026 (0 days) |
| Country | Bhutan · Gelephu |
| Client / owner | Accelerating Transport and Trade Connectivity in Eastern South Asia Phase 2 – Bhutan Project / Department of Surface Transport, Ministry of Infrastructure and Transport |
| Announced | 08 Oct 2026 |
| Deadline | 22 Oct 2026 |
| Project type | Roads & highways, Bridges & tunnels |
Trades and packages needed
- Roads, asphalt paving & road marking (main package)
- Bridge & flyover construction (main package)
- Earthworks, excavation & site grading (main package)
- Concrete works (in-situ)
- Rebar cutting, bending & fixing
- Storm-water drainage & culverts
- Ready-mix concrete, cement & aggregates
What to do
Early stage – get on the client's or bidders' vendor lists now.