Quang Ninh Thermal Power Plant – Package No. 05 EPC upgrade of flue-gas treatment (ESP upgrade, new SCR/NOx removal, FGD/SOx upgrade, VFD fans)
ترسية عقد – Vietnam
Emissions-control retrofit at a coal plant (USD 89.8M + VND 902bn): duct/steel fabricators, catalyst and fan suppliers, E&I and insulation subcontractors should approach the Shanghai Electric–Pacific JV.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Vietnam · Quang Ninh |
| Client / owner | Quang Ninh Thermal Power JSC |
| Awarded to | Shanghai Electric – Pacific Corporation JV |
| Value | USD 124M |
| Announced | 16 Oct 2026 |
| Project type | Power plants & renewables |
Trades and packages needed
- Mechanical erection & equipment installation (main package)
- Structural steel fabrication & erection (main package)
- Electrical & instrumentation (E&I) installation (main package)
- HVAC, pumps & mechanical equipment supply (main package)
- Process piping fabrication & welding
- Industrial hot & cold insulation
- Industrial blasting, coating & painting
- Heavy lifting, rigging & transport
- Scaffolding & access
- Cables, switchgear & electrical materials
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.