Rabigh 2 IPP expansion – erection subcontract for Block 10 HRSGs & steam turbine and Block 20 combined-cycle BOP piping
توسعة محطة رابغ 2 المستقلة للكهرباء – عقد باطن لتركيب مولدات البخار واسترجاع الحرارة والتوربين البخاري للكتلة 10 وأنابيب الدورة المركبة للكتلة 20
Manpower, crane/heavy-lift, scaffolding and NDT providers should contact Power Mech Arabia – 20-month erection works start January 2027.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Saudi Arabia · Rabigh |
| Client / owner | Elsewedy Electric Power Systems Projects / Sinohydro JV (EPC) for Al Morjan Two Electricity Co. (ACWA Power / SEC) |
| Awarded to | Power Mech Arabia Contracting Company |
| Value | USD 52.1M (incl. USD 11.1M option) |
| Announced | 06 Nov 2026 |
| Project type | Power plants & renewables |
Trades and packages needed
- Mechanical erection & equipment installation (main package)
- Process piping fabrication & welding (main package)
- Heavy lifting, rigging & transport (main package)
- Manpower supply (main package)
- Scaffolding & access
- NDT, inspection & certification
- Equipment & crane rental
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.