Rehabilitation of Lifidzi (Lot 1), Chilingali (Lot 2) and Bua (Lot 3) irrigation schemes – MW-MOA-535758-CW-RFB, 6 months each (World Bank FSRP Phase 3)
ترسية عقد – Malawi
Pump, pipe, gate and ready-mix suppliers and plant-hire firms in Malawi should approach the three winning contractors on these short-duration (6-month) World Bank-funded irrigation scheme rehabilitations.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Malawi · Bua / Lifidzi / Chilingali |
| Client / owner | Food Systems Resilience Program for Eastern and Southern Africa Phase 3 (P177816) – Malawi (MOA) |
| Awarded to | Lot 1: Mark Construction & Consolidated Engineering Service JV (MWK 4.16bn); Lot 2: Mangalasi Construction & FISD JV (MWK 6.85bn); Lot 3: PABE Construction Ltd (MWK 4.08bn) |
| Value | MWK 15.09bn |
| Announced | 07 Nov 2026 |
| Project type | Water, desalination & treatment |
Trades and packages needed
- Earthworks, excavation & site grading (main package)
- Concrete works (in-situ) (main package)
- Storm-water drainage & culverts
- Pipes, valves & fittings supply
- HVAC, pumps & mechanical equipment supply
- Ready-mix concrete, cement & aggregates
- Equipment & crane rental
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.