Sam Mbakwe International Cargo Airport, Owerri – runway pavement repairs, crack treatment, resurfacing and planned runway extension for wide-body aircraft (25-day closure from ~20 Oct 2026)
تأهيل مسبق – Nigeria
FAAN plans runway resurfacing and an extension at Owerri airport from about 20 October; asphalt, airfield lighting and paving equipment firms should contact FAAN.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Nigeria · Owerri |
| Client / owner | Federal Airports Authority of Nigeria (FAAN) |
| Announced | 09 Oct 2026 |
| Project type | Airports |
Trades and packages needed
- Roads, asphalt paving & road marking (main package)
- Earthworks, excavation & site grading
- Storm-water drainage & culverts
- Street, area & sports lighting
- Ready-mix concrete, cement & aggregates
- Equipment & crane rental
What to do
Early stage – get on the client's or bidders' vendor lists now.