Cathodic-protection drilling contractors should prequalify for SNGPL's deep-well ground bed installation services on its gas network (corrigendum shows conflicting closing date – verify).
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – closes 05 Nov 2026 (14 days) |
| Country | Pakistan · Lahore |
| Client / owner | Sui Northern Gas Pipelines Ltd – Corrosion Control (Ministry of Energy, Petroleum Division) |
| Announced | 16 Oct 2026 |
| Deadline | 05 Nov 2026 |
| Project type | Pipelines & utility networks, Oil, gas & petrochemical plants |
Trades and packages needed
- Cathodic protection (main package)
- Earthworks, excavation & site grading
- Cables, switchgear & electrical materials
What to do
Early stage – get on the client's or bidders' vendor lists now.