1842 live leads · 130 new today · updated 25 Oct 2026Contactمناقصات يومية مجانية
Tender Leads DailyConstruction tenders & awards · every morning

Today › United States

Pre-qualification / EOI

Stak Energy data center campus & gas-fired power plant (715 acres) – turbines/generators, fuel tanks, cooling towers, water treatment, transformers; sub/supplier prequal Q4 2026, RFPs Q1 2027 (USD 500M)

تأهيل مسبق – United States

Power-plant equipment suppliers and Alaska-capable subcontractors should prepare for prequalification opening in Q4 for this remote data center and gas power project.

TypePre-qualification / EOI
StatusOpen – deadline not published
CountryUnited States · North Slope Borough, AK
Client / ownerStak Energy
ValueUSD 500M
Announced22 Oct 2026
Project typeData centres, Power plants & renewables

Trades and packages needed

What to do

Early stage – get on the client's or bidders' vendor lists now.

Read the official source → Report a correction

Related live opportunities

Pre-qualification / EOIAustraliaAUD 850MOpen – deadline not published

Generation Steel electric arc furnace steel mill, Collie (450,000 t/yr rebar) – AUD 850M plan advances with BHP renewable PPA

Client: Generation Steel (formerly Green Steel WA)

Pre-qualification / EOIUAE · الإماراتAED 1bn+ (USD 272M)Open – deadline not published

Union Paper Mills Al Dhafra plant – AED 1bn+ (USD 272M) paper manufacturing expansion (premium containerboard, gypsum-board paper)

Client: MAHY Khoory Group / Union Paper Mills (UPM)

Pre-qualification / EOIUnited StatesUSD 2.07BOpen – deadline not published

Copper World open-pit mine construction approved – 60,000 tpd concentrator (to 90,000 tpd), moly plant, tailings & in-pit crushing/conveying (USD 2.07B)

Client: Copper World JV (Hudbay Minerals 70% / Mitsubishi Corp 30%)

Pre-qualification / EOIUnited StatesOpen – deadline not published

NextEra Encinal energy hub – 6.5 GW gas-fired generation serving a 5 GW data center campus (Korea / US Commerce-backed), first phase as early as 2029; NextEra secures USD 5.7B across three federal hubs

Client: NextEra Energy

Contract awardBrazilBRL 150.2MContract awarded – subcontracting open

Port of Santana MCP01 grain terminal lease – 25-year contract signed: conveyor belts, new ship loader, pier and land infrastructure upgrades (BRL 150.2M)

Awarded to CS Infra S.A. · Client: Ministério de Portos e Aeroportos

Want more leads like this?Get Mechanical erection & equipment installation, MV/HV substations & transmission lines opportunities in your inbox every morning.
Get free alerts →