Stak Energy data center campus & gas-fired power plant (715 acres) – turbines/generators, fuel tanks, cooling towers, water treatment, transformers; sub/supplier prequal Q4 2026, RFPs Q1 2027 (USD 500M)
تأهيل مسبق – United States
Power-plant equipment suppliers and Alaska-capable subcontractors should prepare for prequalification opening in Q4 for this remote data center and gas power project.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | United States · North Slope Borough, AK |
| Client / owner | Stak Energy |
| Value | USD 500M |
| Announced | 22 Oct 2026 |
| Project type | Data centres, Power plants & renewables |
Trades and packages needed
- Mechanical erection & equipment installation (main package)
- MV/HV substations & transmission lines
- Pressure vessels, tanks & heat exchangers
- Structural steel fabrication & erection
- Water & wastewater treatment equipment
- Generators, UPS & standby power
- HVAC & ventilation
- Electrical & instrumentation (E&I) installation
What to do
Early stage – get on the client's or bidders' vendor lists now.