Supply, installation and configuration of Intelligent Transport System (STI-LON) equipment, Cinkansé–Ouagadougou section, BF-HYDROMET-530499-GO-RFB (World Bank)
مناقصة – Burkina Faso
ITS and traffic-systems integrators: international two-envelope RFB for corridor monitoring equipment on a key Togo–Burkina Faso freight route, 9-month delivery, bid security XOF 25M.
| Type | Open tender |
|---|---|
| Status | Open – closes 06 Jan 2027 (48 days) |
| Country | Burkina Faso · Ouagadougou |
| Client / owner | Lome-Ouagadougou-Niamey Economic Corridor (PCE-LON) – Ministry of Construction, Burkina Faso |
| Announced | 16 Nov 2026 |
| Deadline | 06 Jan 2027 |
| Project type | Roads & highways |
Trades and packages needed
- ELV, ICT & security systems (CCTV, access, cabling) (main package)
- BMS, controls & SCADA (main package)
- Electrical installation (LV)
- Cables, switchgear & electrical materials
What to do
Register with the client and request the tender documents before the deadline.