Tadweer Group material recovery facility (200,000 t/yr MSW + 200,000 t/yr C&I waste) – groundbreaking, operations Q2 2028
منشأة استرداد المواد التابعة لمجموعة تدوير (200 ألف طن سنوياً من النفايات البلدية و200 ألف طن من النفايات التجارية والصناعية) – وضع حجر الأساس والتشغيل في الربع الثاني 2028
Sorting-equipment suppliers, steel-building and MEP subcontractors should engage Tadweer and Urbaser on the new Abu Dhabi materials recovery facility now under construction.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | UAE · Abu Dhabi |
| Client / owner | Tadweer Group |
| Awarded to | Urbaser (development partner) |
| Announced | 22 Oct 2026 |
| Project type | Factories & industrial plants |
Trades and packages needed
- Pre-engineered & modular buildings (main package)
- Mechanical erection & equipment installation (main package)
- Concrete works (in-situ)
- Electrical & instrumentation (E&I) installation
- BMS, controls & SCADA
- Fire protection & fire alarm
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.