Thameside West regeneration, Royal Docks – GLA direct-award development agreement (5,000+ homes; phase 1 of 1,500 homes in six buildings, park, 1 km Thames waterfront, proposed Thames Wharf DLR station)
ترسية عقد – United Kingdom
Piling, frame, façade and MEP subcontractors should engage Arada London ahead of the first 1,500-home phase (construction targeted 2028) on this multi-decade east London waterfront masterplan.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | United Kingdom · London (Royal Docks, Newham) |
| Client / owner | Greater London Authority (GLA) |
| Awarded to | Silvertown Homes (Arada-backed); Arada London lined up for phase 1 |
| Value | GBP 2.705bn |
| Announced | 17 Nov 2026 |
| Project type | Residential towers & apartments, Rail & metro |
Trades and packages needed
- Piling & deep foundations (main package)
- Concrete works (in-situ) (main package)
- Façades, curtain wall & cladding (main package)
- Electrical installation (LV)
- Plumbing & sanitary
- HVAC & ventilation
- Interior fit-out
- Lifts, escalators & travelators
- Marine works, dredging & reclamation
- Landscaping, irrigation & hardscape
- Earthworks, excavation & site grading
- Aluminium, glass & glazing
- Fire protection & fire alarm
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.