Two 100 MW wind farms (Laghouat & Djelfa) – EPC tender: studies, engineering, civil works, supply, erection, testing, commissioning & grid connection
مزرعتان لطاقة الرياح بقدرة 100 ميغاواط لكل منهما (الأغواط والجلفة) – مناقصة EPC تشمل الدراسات والهندسة والأعمال المدنية والتوريد والتركيب والتشغيل والربط بالشبكة
Wind EPC contractors, turbine suppliers, heavy-lift and civil/HV subcontractors should bid Algeria's first utility-scale wind farms before the 25 November deadline.
| Type | Open tender |
|---|---|
| Status | Open – closes 25 Nov 2026 (50 days) |
| Country | Algeria · Laghouat / Djelfa |
| Client / owner | Sonelgaz |
| Announced | 03 Oct 2026 |
| Deadline | 25 Nov 2026 |
| Project type | Power plants & renewables, Substations & transmission grids |
Trades and packages needed
- Mechanical erection & equipment installation (main package)
- Heavy lifting, rigging & transport (main package)
- Concrete works (in-situ) (main package)
- MV/HV substations & transmission lines (main package)
- Earthworks, excavation & site grading
- Roads, asphalt paving & road marking
- Cables, switchgear & electrical materials
- Equipment & crane rental
What to do
Register with the client and request the tender documents before the deadline.