Złotoryja bypass stage 1 (3.85 km, 180 m bridge over Kaczawa, 2 roundabouts) – construction started (PLN 43.89M)
ترسية عقد – Poland
Bridge, piling and asphalt suppliers in Lower Silesia can offer packages to the consortium building this bypass through 2029.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Poland · Złotoryja |
| Client / owner | Dolnośląska Służba Dróg i Kolei (DSDiK) Wrocław |
| Awarded to | Himmel i Papesch / Przedsiębiorstwo Transportowo-Budowlane Wrocław consortium |
| Value | PLN 43.89M |
| Announced | 23 Oct 2026 |
| Project type | Roads & highways, Bridges & tunnels |
Trades and packages needed
- Roads, asphalt paving & road marking (main package)
- Bridge & flyover construction (main package)
- Earthworks, excavation & site grading
- Piling & deep foundations
- Storm-water drainage & culverts
- Ready-mix concrete, cement & aggregates
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.