Al Hamra crude terminal storage expansion from 2.5M to 5.3M barrels (USD 457M, by Dec 2026) and 317 km six-pipeline downstream expansion (USD 128M, early 2027)

توسعة سعات تخزين ميناء الحمراء للنفط الخام من 2.5 إلى 5.3 مليون برميل (457 مليون دولار بحلول ديسمبر 2026) وتوسعة شبكة الخطوط بستة خطوط بطول 317 كم (128 مليون دولار مطلع 2027)

Tank fabricators, coating and cathodic-protection firms can target Egypt's Al Hamra crude-storage doubling and 317 km pipeline expansion, both due within months.

TypePre-qualification / EOI
StatusOpen – deadline not published
CountryEgypt · Al Hamra (Alamein)
Client / ownerEgypt Ministry of Petroleum / Petroleum Pipelines Company
ValueUSD 585M
Announced28 Oct 2026
Project typeOil, gas & petrochemical plants, Pipelines & utility networks

Trades and packages needed

What to do

Early stage – get on the client's or bidders' vendor lists now.

Read the official source → Report a correction

Related live opportunities

Contract awardIndiaINR 20,000–28,000 crore (excl. GST)Contract awarded – subcontracting open

Adani Power – four 2x800 MW thermal power projects (8 units, 6,400 MW): boilers, turbines, generators & auxiliaries awarded to BHEL

Awarded to Bharat Heavy Electricals Ltd (BHEL) · Client: Adani Power Ltd

Pre-qualification / EOIUnited StatesUSD 1.6bnOpen – deadline not published

Energy Transfer South Mississippi gas pipeline – 215-mile, 36-inch, 1.2 Bcf/d line, FID taken (~USD 1.6bn, in service 2030)

Client: Energy Transfer

Pre-qualification / EOIArgentinaUSD 1.5bnOpen – deadline not published

TGN Vaca Muerta–northern Argentina gas pipeline (~753 km / 468 mi, ~USD 1.5bn) – capacity tender to launch early December 2026, FID expected in March, operations April 2029

Client: Transportadora de Gas del Norte (TGN)

Pre-qualification / EOIIraq · العراقOpen – deadline not published

Basra–Haditha crude export pipeline – trilateral Iraq–Jordan–Egypt technical talks on diameter, capacity, branches and export routes, plus proposed joint petrochemical complex and storage

Client: Iraq Ministry of Oil (with Jordan and Egypt)

Pre-qualification / EOIPakistanUSD 4.4bnOpen – deadline not published

Port Qasim integrated LNG merchant hub – 560,000 m³ storage terminal (phase 1) and 1,100 km upcountry gas pipeline (phase 2), USD 4.4bn proposal

Client: Consortium led by Global Vision Energy Partners, Khanjee Holdings and General Mediterranean Holding