Design review of Natu irrigation scheme, NG-ZAMFARA STATE SPIN-572315-CS-CQS – consultant EOI (World Bank SPIN)
تأهيل مسبق – Nigeria
Irrigation design consultancies can submit EOIs for Zamfara SPIN's Natu scheme design review by 30 Oct 2026 (CQS selection).
| Type | Pre-qualification / EOI |
|---|---|
| Status | Closed 30 Oct 2026 |
| Country | Nigeria · Zamfara State |
| Client / owner | Sustainable Power and Irrigation for Nigeria (SPIN) – Zamfara State PIU |
| Announced | 26 Oct 2026 |
| Deadline | 30 Oct 2026 |
| Project type | Water, desalination & treatment |
Trades and packages needed
- Structural & civil design (main package)
- MEP & process design engineering
- Land surveying & geotechnical investigation
What to do
Early stage – get on the client's or bidders' vendor lists now.