2352 live leads · 55 new today · updated 05 Nov 2026Contactمناقصات يومية مجانية
Tender Leads DailyConstruction tenders & awards · every morning

Today › Nigeria

Pre-qualification / EOI

Design review of Natu irrigation scheme, NG-ZAMFARA STATE SPIN-572315-CS-CQS – consultant EOI (World Bank SPIN)

تأهيل مسبق – Nigeria

Irrigation design consultancies can submit EOIs for Zamfara SPIN's Natu scheme design review by 30 Oct 2026 (CQS selection).

TypePre-qualification / EOI
StatusClosed 30 Oct 2026
CountryNigeria · Zamfara State
Client / ownerSustainable Power and Irrigation for Nigeria (SPIN) – Zamfara State PIU
Announced26 Oct 2026
Deadline30 Oct 2026
Project typeWater, desalination & treatment

Trades and packages needed

What to do

Early stage – get on the client's or bidders' vendor lists now.

Read the official source → Report a correction

Related live opportunities

Pre-qualification / EOIPeruOpen – deadline not published

Vía de Evitamiento Chimbote – final engineering design (EDI) for grade-separated crossings, pedestrian footbridges, connector roads and four bridges (Vesique, Buenos Aires, Santa, Campo Nuevo ovals); 12-month study

Client: MTC – Dirección General de Programas y Proyectos de Transportes

Pre-qualification / EOIKuwait · الكويتOpen – deadline not published

Deep tunnel stormwater system – study and preliminary design (limited tender request; CAPT decision deferred)

Client: Ministry of Public Works (MPW), Kuwait

Contract awardUnited StatesUSD 17MContract awarded – subcontracting open

CTA Blue Line Forest Park Branch – redesign of 13 miles (IMD station to Forest Park), ~70,000 ft of track, drainage along I-290

Awarded to AECOM Technical Services · Client: Chicago Transit Authority (CTA)

Open tenderPolandOpen – closes 09 Dec 2026 (34 days)

DK15 Kowalewo Pomorskie bypass (~8 km, 6 structures, 4 junctions, 2 roundabouts) – design & build tender, 39 months

Client: GDDKiA Gdańsk branch

Pre-qualification / EOIPolandPLN 2.5bn (est.)Open – deadline not published

Przylądek Pomerania deep-water container terminal (marine part) – 3,350 m + 1,580 m breakwaters, 1,300 m container pier, ~3 km quays, dredging & 186 ha reclamation – design & build, competitive dialogue launched

Client: Maritime Office in Szczecin with Szczecin and Świnoujście Seaports Authority (ZMPSiŚ)

Want more leads like this?Get Structural & civil design, MEP & process design engineering opportunities in your inbox every morning.
Get free alerts →