Kuwait MPW road bottleneck/junction remediation & drainage maintenance contract (730 days, CAPT-prequalified bidders) + Al-Mutlaa stormwater basin O&M; MEW 1,600 mm Mina Abdullah–West Funaitees water lines among 32 network tenders
عقد وزارة الأشغال لمعالجة الاختناقات المرورية وصيانة الطرق وشبكات الأمطار والصرف (730 يوماً) وتشغيل وصيانة أحواض المطلاع، و32 مناقصة لوزارة الكهرباء والماء منها خطا مياه قطر 1,600 مم من ميناء عبدالله إلى غرب الفنيطيس
CAPT-prequalified road and drainage contractors and large-diameter water-pipe suppliers should track Kuwait's imminent MPW maintenance award (Mutlaa basin bids due 3 Nov) and MEW's 32 network tenders.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Kuwait · Nationwide; Al-Mutlaa; Mina Abdullah–West Funaitees–Zour |
| Client / owner | Ministry of Public Works (MPW) / Ministry of Electricity, Water & Renewable Energy (MEW) via CAPT |
| Announced | 29 Oct 2026 |
| Project type | Roads & highways, Pipelines & utility networks, Water, desalination & treatment |
Trades and packages needed
- Roads, asphalt paving & road marking (main package)
- Storm-water drainage & culverts (main package)
- Water, sewer & utility networks (incl. HDD) (main package)
- Pipeline construction
- Pipes, valves & fittings supply
- Signage & wayfinding
- Site security & traffic management
What to do
Early stage – get on the client's or bidders' vendor lists now.