LP/E/CAED/008/2026 – central sewer outfall (emisor central) replacement: ~2.35 km of 72-inch pipe plus San Ignacio collector (903 m of 42-inch new, 1.56 km of 60-inch rehab); MXN 188.3M incl. VAT, start 9 Nov, 180 days
ترسية عقد – Mexico
Large-diameter pipe suppliers, dewatering and trenching subcontractors should contact the winning contractor before works start on 9 November.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Mexico · Gómez Palacio, Durango |
| Client / owner | Comisión del Agua del Estado de Durango (CAED) |
| Awarded to | Petrología e Ingeniería Avanzada S.A. de C.V. |
| Value | MXN 188.3M |
| Announced | 02 Nov 2026 |
| Project type | Wastewater & sewage, Pipelines & utility networks |
Trades and packages needed
- Water, sewer & utility networks (incl. HDD) (main package)
- Earthworks, excavation & site grading (main package)
- Pipes, valves & fittings supply (main package)
- Dewatering
- Equipment & crane rental
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.