Southern Iraq seawater injection project Phase 2 (2.5M bpd) – MoU signed by ExxonMobil and Basra Oil Company

المرحلة الثانية من مشروع حقن مياه البحر في جنوب العراق (2.5 مليون برميل يومياً) – توقيع مذكرة تفاهم بين إكسون موبيل وشركة نفط البصرة

Water-treatment, pumping and large-diameter pipeline contractors should track ExxonMobil's Phase 2 seawater injection scheme with Basra Oil Company.

TypePre-qualification / EOI
StatusOpen – deadline not published
CountryIraq · Basra
Client / ownerBasra Oil Company
Announced22 Oct 2026
Project typeOil, gas & petrochemical plants, Pipelines & utility networks

Trades and packages needed

What to do

Early stage – get on the client's or bidders' vendor lists now.

Read the official source → Report a correction

Related live opportunities

Contract awardIraq · العراقContract awarded – subcontracting open

Two 125 MW combined-cycle units at South Baghdad gas power station and Khor al-Zubair – under construction by Dongfang Electric, service targeted before summer 2027

Awarded to Dongfang Electric · Client: Ministry of Electricity, Iraq

Contract awardKazakhstanContract awarded – subcontracting open

Ethane & propane trunk pipelines in a single corridor, Tengiz–Karabatan SEZ (~210 km each) – construction started

Awarded to CPPE (Kazakhstan) LLP / China Petroleum Pipeline Engineering-led consortium incl. CITIC Construction · Client: KMG PetroChem LLP (KazMunayGas)

Pre-qualification / EOIEthiopiaOpen – deadline not published

Dangote Group – planned petroleum products pipeline and tank farms on the Djibouti–Addis Ababa corridor (plus proposed Zimbabwe–Zambia corridor) under USD 50bn 2026–2030 plan

Client: Dangote Group

Contract awardUAE · الإماراتContract awarded – subcontracting open

Tadweer Group material recovery facility (200,000 t/yr MSW + 200,000 t/yr C&I waste) – groundbreaking, operations Q2 2028

Awarded to Urbaser (development partner) · Client: Tadweer Group

Pre-qualification / EOISaudi Arabia · السعوديةOpen – deadline not published

Ras Al-Khair port sulphur handling facilities – BOOT for receiving, forming and exporting up to 9,500 t/d molten sulphur

Client: Saudi Aramco