Leads added on Saturday 31 October 2026

58 new construction, infrastructure and oil & gas leads: 14 open tenders, 20 pre-qualifications / EOIs and 24 contract awards. Tenders whose deadline has passed are marked closed.

← Fri 30 OctAll past daysSun 01 Nov →

Contract awardUnited StatesUSD 37BContract awarded – subcontracting open

AEP USD 37B five-year transmission buildout (incl. ~USD 5B Piketon 765-kV lines) – Jacobs (7 eastern states) and WSP USA (4 western states) selected for engineering, siting, ROW, permitting and programme management

Awarded to Jacobs (with ORC, GFT, RC Commonwealth); WSP USA · Client: American Electric Power (AEP)

Contract awardPeruPEN 13MContract awarded – subcontracting open

Torre Oncológica, Hospital Regional de Moquegua – chemotherapy room, procedures, pharmacy, storage and medical equipment; site handed over, technical file (expediente) then construction from December

Awarded to Consorcio Overlay-Carmen · Client: Gobierno Regional de Moquegua (with Asociación Quellaveco; supervision AENOR)

Contract awardBrazilBRL 60.9MContract awarded – subcontracting open

SC-108 paving resumed, 31.1 km Praia Grande–Jacinto Machado – alignment improvements, drainage, widening, 5 bridges, cycle lanes, roundabouts; order of service signed, 18 months

Awarded to Coenpa Infraestrutura · Client: Governo de Santa Catarina – Secretaria de Infraestrutura e Mobilidade

Contract awardCanadaContract awarded – subcontracting open

Oakville GO Station renovation – rebuilt platforms, accessible pedestrian bridges (4 elevators, 4 stairs), canopies, larger bus loop; four buildings, bridges and elevator shafts as volumetric modules

Awarded to Kenaidan Murphy Joint Venture (CM); ANC Modular (modules); R.V. Anderson (design) · Client: Metrolinx

Pre-qualification / EOIAlgeria · الجزائرUSD 14.6bnOpen – deadline not published

Algiers–Tamanrasset railway – 924 km of works about to launch (Laghouat–Ghardaïa 265 km, Ghardaïa–El Ménéa 230 km, Tamanrasset–Moulay Lahcen 213 km); DZD 1,910bn (~USD 14.6bn) budgeted, AfDB financing

Client: Ministry of Public Works and Basic Infrastructure (Algeria)