2780 live leads · 55 new today · updated 19 Nov 2026Contactمناقصات يومية مجانية
Tender Leads DailyConstruction tenders & awards · every morning

Today

Project management & construction supervision – tenders & subcontract leads

329 live projects that need project management & construction supervision – tenders, pre-qualifications and newly awarded contracts, updated daily.

Get these every morning – free.New Project management & leads, straight to your email or WhatsApp.
Register free →
Pre-qualification / EOIIndiaINR 800 billionOpen – deadline not published

Hindustan Zinc capacity doubling – refined zinc to 2 Mtpa and silver to 1,500 tpa with mine, mill and smelter expansions plus Zinc Industrial Park, Bhilwara

Client: Hindustan Zinc Ltd (Vedanta Group)

Pre-qualification / EOIBahrain · البحرينOpen – deadline not published

Northern Link Road PPP highway – Ministry of Works appoints transaction adviser (KPMG, EY and PwC bid)

Client: Ministry of Works, Bahrain

Contract awardSaudi Arabia · السعوديةSAR 412.3MContract awarded – subcontracting open

Gulf Coast Development (PIF) Khafji coastal destination – construction & secondary infrastructure (Al Rajhi), PMC/supervision (AECOM) and QS (C-Quest) contracts

Awarded to Al Rajhi Building and Construction; AECOM (PMC & supervision); C-Quest (cost consultancy) · Client: Gulf Coast Development (PIF)

Pre-qualification / EOIMozambiqueOpen – closes 18 Dec 2026 (29 days)

Climate vulnerability assessment along the Nacala Corridor and supervision of civil works (FIDIC Engineer), 45A000141/CP/05/2026 (World Bank EOI)

Client: Transport Corridors for Economic Resilience Mozambique SOP 2 Project (TRACER SOP2) – Ministry of Transport and Logistics

Pre-qualification / EOIColombiaCOP 20trnOpen – deadline not published

ANI concession pipeline for 2027 tendering – El Dorado Max airport expansion (COP 13trn, 45→73M pax), new Cartagena (Bayunca) airport (COP 6.13trn, 30-yr), Conexión Centro 5G road and Perimetral de la Sabana

Client: Agencia Nacional de Infraestructura (ANI) – private initiatives originated by Odinsa

Open tenderOman · عُمانOpen – closes 07 Dec 2026 (18 days)

Omran tender 41/2026 – design & development consultancy for enhancement of the Al Hoota Cave destination (global, two-envelope)

Client: Omran Group (Oman Tourism Development Company)

Contract awardUnited StatesUSD 150M (ceiling, up to USD 300M with options)Contract awarded – subcontracting open

MWAA program management support task-order contracts (5 yrs + options) for Dulles USD 20bn+ redevelopment and Reagan National Terminal 1 replacement / South Area – planning, oversight, controls, construction management

Awarded to Jacobs Project Management Co.; TYLin International · Client: Metropolitan Washington Airports Authority (MWAA)

Pre-qualification / EOIArmeniaOpen – closes 15 Dec 2026 (26 days)

Feasibility study, designs, bidding documents and technical supervision for irrigation systems (Kotayk, Lori, Arzni-Shamiram, Lower Hrazdan incl. Ranchpar pumping stations & pressure pipelines, Debetavan), AM-WC-CS-03/1 (World Bank EOI)

Client: Armenia Water and Irrigation Services Enhancement Program – Phase 1 – Water Committee, Ministry of Territorial Administration and Infrastructure

Pre-qualification / EOITajikistanUSD 20MOpen – deadline not published

ADB Tajikistan Transport Sector Project Preparation Facility (58427-001) – feasibility & detailed design, first activity Dushanbe EcoMobility 7 km e-bus priority corridor on Somoni Avenue

Client: Government of Tajikistan / Department of Transport, Dushanbe Municipality (ADB financed)

Pre-qualification / EOIIrelandOpen – deadline not published

Navan railway reinstatement (~34 km, stations Dunshaughlin, Kilmessan, Navan Central, Navan North) – preferred route published, Railway Order application planned 2028

Client: Iarnród Éireann (funded via National Transport Authority)

Pre-qualification / EOIUAE · الإماراتAED 8bn (USD 2.1bn)Open – deadline not published

Emaar Hospitality / ALAIN – five Address, Palace and Vida branded residential developments on Abu Dhabi waterfront sites (~4.7 million ft², AED 8bn)

Client: Emaar Hospitality Group / Al Ain Asset Management (ALAIN)

Pre-qualification / EOITurkeyOpen – closes 07 Dec 2026 (18 days)

Mersin M2:3 rail system line (9.93 km, 11 tram stations, Ocak Kent Meydanı–Şehir Hastanesi–Meşot) – design review, construction supervision & consultancy, prequalification (İKN 2026/2207797)

Client: Mersin Metropolitan Municipality – Transportation Department

Pre-qualification / EOISaudi Arabia · السعوديةSAR 1bnOpen – deadline not published

Dar Global co-branded luxury mixed-use development in Jeddah – SAR 1bn GDV, land acquired (contractor and design team not yet appointed)

Client: Dar Global

Pre-qualification / EOIKuwait · الكويتOpen – deadline not published

Ministry of Public Works – two study, design and supervision consultancies for infrastructure in Mubarak Al-Kabeer & Qurain and Sabahiya, South Sabahiya & Fahad Al-Ahmad (CAPT request to tender)

Client: Ministry of Public Works (Kuwait) / Central Agency for Public Tenders

Pre-qualification / EOIIraq · العراقOpen – deadline not published

New Baghdad International Airport – 20 million passenger/year airport on ~20,000 dunams planned under an investment model

Client: National Investment Commission (NIC), Iraq

Pre-qualification / EOIPeruUSD 89bnOpen – deadline not published

Peru Rail Master Plan (PMDF 2050) – MTC presents 14-project, 5,524 km, USD 89bn rail portfolio to investors (Lima–Ica, Marcona–Andahuaylas, Trujillo–Barranca, Lima–Barranca, Cusco–Chinchero)

Client: Ministerio de Transportes y Comunicaciones (MTC)

Pre-qualification / EOIEgypt · مصرUSD 2.15bnOpen – deadline not published

Project Atlas AI data centre campus – phase 1, 180 MW plus 200+ MW solar park and ~800 MWh BESS (USD 2.15bn); operator search and design revision under way

Client: Income Egypt for Infrastructure & Investment / Sustainable Infra Capital (SIC)

Open tenderKuwait · الكويتOpen – closes 24 Dec 2026 (35 days)

Al Mutlaa Residential City – management & supervision consultancy for public buildings in suburbs N1, N3, N4, N5, N6 (bid bond KD 50,000)

Client: Public Authority for Housing Welfare (PAHW)

Pre-qualification / EOIKenyaKES 130bnOpen – deadline not published

Lake Victoria Basin Connectivity and Development Project – 815 km roads in 5 design-build packages (~12 contracts), KeNHA procurement started, contractor briefing 18 Nov 2026

Client: Kenya National Highways Authority (KeNHA); World Bank financing

Open tenderUAE · الإماراتOpen – closes 09 Dec 2026 (20 days)

Zayed City sectors MZ09 & MZ12 roads and infrastructure – design & build contractor RFQ (DMT-RFP-26-088, MC12) plus supervision consultant RFQ (DMT-RFP-26-092)

Client: Department of Municipalities and Transport (DMT), Abu Dhabi

Pre-qualification / EOIEthiopiaOpen – closes 30 Nov 2026 (11 days)

Design review and construction supervision of Awadi Geberoch climate-resilient diversion irrigation and drainage scheme – EOI ET-AFR-RPCU-569666-CS-QCBS (World Bank LLRP II)

Client: Lowlands Livelihood Resilience Project II – Afar Regional Project Coordination Unit

Pre-qualification / EOIUnited StatesUSD 750M (state grant)Open – deadline not published

The Portal (Caltrain/HSR downtown extension, ~2 mi from 4th & King to Salesforce Transit Center) – USD 750M state TIRCP grant secured

Client: Transbay Joint Powers Authority (TJPA)

Open tenderQatar · قطرOpen – closes 29 Dec 2026 (40 days)

Roads and infrastructure in Al Kheesa North & East (Rawdat Al Hamama) Package 03 – works (PWA/GTC/21/2026) and supervision (PWA/STC/49/2026)

Client: Public Works Authority (Ashghal)

Open tenderQatar · قطرOpen – closes 13 Dec 2026 (24 days)

Supervision consultancy for roads and infrastructure in Wadi Al Banat Zone 70 (PWA/STC/47/2026)

Client: Public Works Authority (Ashghal)

Open tenderUAE · الإماراتOpen – closes 09 Dec 2026 (20 days)

DEWA 2122600152 – design, tender documents and supervision consultancy for 60 new 11 kV feeders from Hatta 132/11 kV substation

Client: Dubai Electricity and Water Authority (DEWA)

Pre-qualification / EOIUzbekistanUSD 1.8BOpen – deadline not published

Bukhara Oil Refinery expansion to 4.6 Mtpy product output plus Euro-5 gasoline project – plans reviewed by President

Client: Bukhara Oil Refinery

Pre-qualification / EOIKazakhstanOpen – deadline not published

Pavlodar Petrochemical Plant expansion from 6 to 9 Mtpy – FEED discussions between KMG and Samsung E&A

Client: KazMunayGas (KMG)

Pre-qualification / EOIIndiaOpen – deadline not published

GAIL–KRIBHCO 1.27 MMtpy gas-based urea plant at Mulapeta, Andhra Pradesh – MoU signed to develop via JV

Client: GAIL (India) Ltd & KRIBHCO JV; Andhra Pradesh Economic Development Board

Pre-qualification / EOIGhanaUSD 1bnOpen – deadline not published

Pwalugu Multipurpose Dam (70 MW hydro, 25,000 ha irrigation) – USD 1bn completion plan in 2027 budget

Client: Government of Ghana

Contract awardTurkeyContract awarded – subcontracting open

New nuclear power development – feasibility study and FEED evaluation of a potential site (site characteristics, infrastructure, supply chain), AtkinsRéalis selected, due end-2027

Awarded to AtkinsRéalis · Client: Turkish state-owned nuclear energy company

Open tenderSaudi Arabia · السعوديةOpen – deadline not published

King Salman International Airport – general engineering consultancy for masterplan assets (bids due late November 2026)

Client: King Salman International Airport Development Company

Pre-qualification / EOICentral African RepublicOpen – closes 24 Nov 2026 (5 days)

Supervision of construction of the LGCU civil and urban engineering laboratory building, University of Bangui – EOI PRACAC-73/SC/QC/26 (World Bank Central Africa Regional Waterways Project)

Client: Central Africa Regional Waterways Project (PRACAC) – Ministry of Equipment and Public Works

Pre-qualification / EOICanadaOpen – deadline not published

Hazel McCallion LRT downtown Brampton extension (3+ km, Brampton Gateway Terminal–Brampton Innovation District GO) – province commits, geotechnical boreholes underway (tunnelling expected)

Client: Government of Ontario / Metrolinx

Open tenderUAE · الإماراتOpen – closes 26 Nov 2026 (7 days)

Dubai Municipality – community centres Phase 3 (PJ-30070), Al Maktoum Airport stormwater pond (TF-06-C1) and stormwater supervision Package 3 (TF-12-S1)

Client: Dubai Municipality

Contract awardSaudi Arabia · السعوديةSAR 398.43MContract awarded – subcontracting open

Busaita fuel-displacement and grid power connection project – bids approved (SAR 398.43M excl. VAT, 13 months)

Client: Al-Jouf Agricultural Development Co.

Pre-qualification / EOIBoliviaUSD 300MOpen – deadline not published

Corredor Central Sur – Hornillos–Impora–Las Carreras (91.6 km) and Cruce Laguna Colorada–Avaroa (34 km) roads, USD 300M IDB financing in preparation

Client: Administradora Boliviana de Carreteras (ABC)

Contract awardKazakhstanContract awarded – subcontracting open

Kazazot Prime ammonia-urea-nitric acid-ammonium nitrate complex (660 ktpy ammonia) – PMC contract

Awarded to Técnicas Reunidas · Client: Kazazot Prime LLP

Pre-qualification / EOIIraq · العراقOpen – deadline not published

Iraq–Saudi Arabia (IPSA) crude export pipeline revival – 1,568 km Zubair–Yanbu line, Saudi preliminary approval; Iraq to fund restoration of its section

Client: Iraq Ministry of Oil

Pre-qualification / EOIMalaysiaUSD 49.3MOpen – deadline not published

East Coast Rail Link extension Kota Bharu–Rantau Panjang (32 km, to Thai border) – RM200M allocated for design, surveys, EIA and site preparation

Client: Government of Malaysia (Ministry of Finance)

Pre-qualification / EOIUAE · الإماراتOpen – deadline not published

Ardee Downtown, Al-Marjan Island – 3.5M sq ft mixed-use downtown scheme launched (phased completion from 2030)

Client: Ardee Developments

Pre-qualification / EOIUAE · الإماراتAED 2.5bnOpen – deadline not published

DP World Fujairah east-coast terminals – Al Rugaylat container/multi-purpose terminal (2.5M TEU) and Dibba general cargo terminal (AED 2.5bn), delivery accelerated to 18–24 months

Client: DP World

Pre-qualification / EOIIraq · العراقOpen – deadline not published

National south–north LPG pipeline – Ministry of Oil orders feasibility study

Client: Ministry of Oil, Iraq

Pre-qualification / EOIGhanaUSD 600MOpen – deadline not published

Keta Commercial Port (Volta Region) – seven strategic investors shortlisted from 47 applicants; container, bulk and oil & gas terminals, possible shipyard

Client: Ghana Ports and Harbours Authority (GPHA)

Pre-qualification / EOIPeruPEN 800MOpen – deadline not published

Chonta dam (Cajamarca) – water supply and irrigation dam, PEN 800M investment; first-year budget sought, physical works from 2027

Client: Ministerio de Desarrollo Agrario y Riego (Midagri) / MEF

Pre-qualification / EOIIndiaOpen – closes 28 Dec 2026 (39 days)

NHAI/MoRTH CE-RO Lucknow – Authority's Engineer consultancy for construction of new bridges on NH-730C, UP (CE-RO/LKO/NH-730C/2026-27/AE)

Client: Ministry of Road Transport & Highways – Chief Engineer Regional Office Lucknow

Contract awardSwedenContract awarded – subcontracting open

Alby PtX e-SAF plant (~66,000 t/yr synthetic aviation fuel) – FEED for full process, leading to EPC on FID

Awarded to Técnicas Reunidas · Client: Alby PtX AB (Norsk e-Fuel / Prime Capital)

Pre-qualification / EOISyria · سورياOpen – deadline not published

Syria–Jordan corridor projects – regional rail link (Syria, Jordan, Saudi Arabia, Türkiye) studies and cost estimates agreed; international highway rehabilitation and Nassib–Jaber crossing upgrade discussed

Client: Governments of Syria and Jordan (Higher Coordination Council)

Pre-qualification / EOIUAE · الإماراتOpen – deadline not published

Nakheel Palm Springs masterplan – 3.8M m², 15 neighbourhoods for ~50,000 residents: villas, townhouses, apartments, 2 schools, hospital, 6 mosques, 35 km of trails

Client: Nakheel (Dubai Holding Real Estate)

Pre-qualification / EOIUAE · الإماراتAED 2bnOpen – deadline not published

Dubai Metro Route 2020 extension to Al Maktoum International Airport City – 3 km, 2 stations, AED 2bn, approved by Dubai Executive Council (service 2031)

Client: Roads and Transport Authority (RTA) / Dubai Engineering Projects Establishment

Pre-qualification / EOIRwandaOpen – closes 30 Nov 2026 (11 days)

EOI – supervision of Cyohoha irrigation scheme development works, 3,000 ha (OP00476775)

Client: Commercialization and De-Risking for Agricultural Transformation Project

Pre-qualification / EOIOman · عُمانOpen – deadline not published

Al Yazan Integrated Tourism Project at Sultan Qaboos Port, Muttrah – 18.5 ha waterfront: ~1,500 homes (180,000 m²), 25,000 m² retail, 400 m promenade, three phases

Client: Oman Tourism Development Company (OMRAN Group) / VA Group

Pre-qualification / EOIPeruPEN 710MOpen – deadline not published

ANIN – 34 health facilities (new Hospital de Ilo II-1 S/ 280M, 22 primary-care facilities in Apurímac S/ 278.8M, 11 in Ayacucho S/ 151M) under joint-execution agreements with regional governments, Modular Infrastructure System (Plan Mil)

Client: Autoridad Nacional de Infraestructura (ANIN) / Gobiernos Regionales de Apurímac, Ayacucho y Moquegua

Open tenderMauritiusOpen – closes 10 Dec 2026 (21 days)

Consultancy services for yard expansion works at the Mauritius Container Terminal (MCT) – Contract MPA 752/2026

Client: Mauritius Ports Authority (MPA)

Pre-qualification / EOISyria · سورياUSD 6–8BOpen – deadline not published

New Syrian oil refinery (est. USD 6–8bn) – international companies in talks to develop under BOT contract

Client: Government of Syria

Pre-qualification / EOISri LankaUSD 300MOpen – deadline not published

ADB USD 300M for Sri Lanka water – Climate-Resilient Sustainable Water Supply and Sanitation Project (USD 200M): new WTPs, transmission & distribution networks, reservoirs (Colombo, Lunugamwehera) and Jaffna sewerage, WWTP & pumping stations

Client: Government of Sri Lanka / National Water Supply and Drainage Board (ADB-financed)

Pre-qualification / EOISouth KoreaKRW 3.74tn (~USD 2.55bn)Open – deadline not published

Sejong National Assembly complex (KRW 3.74 trillion, completion 2033) – KRW 119.1bn basic design budget proposed for 2027; presidential office works to start (KRW 205.7bn)

Client: Government of South Korea (National Assembly / Public Procurement Service)

Pre-qualification / EOIDemocratic Republic of CongoUSD 221MOpen – deadline not published

Zongo–Bangui road bridge over the Ubangi River (Bangui–Kisangani–Kampala corridor) incl. Bangui bypass – cost revised to ~USD 221M; AfDB board in Q1 2027, works from H2 2027

Client: DRC Ministry of Infrastructure and Public Works / Government of CAR / ECCAS (AfDB, BADEA financing)

Open tenderNetherlandsOpen – closes 11 Feb 2027 (84 days)

Engineering services for the Dordrecht-side landing of the new traffic bridge (Verkeersbrug Dordrecht), ref. 260091GDD (TenderNed 448373)

Client: Gemeente Dordrecht / Bedrijfsvoering Drechtsteden

Pre-qualification / EOIKuwait · الكويتOpen – deadline not published

Al Nuwaiseeb power and water desalination plant (PPP) – phase-one consultancy studies tender request deferred by CAPT pending amendments

Client: Kuwait Authority for Partnership Projects (KAPP)

Open tenderKuwait · الكويتOpen – closes 10 Dec 2026 (21 days)

Jahra Bachelors City – Amghara: consultancy for studies, designs, tender documents and optional supervision of demolition, rehabilitation, reconstruction and infrastructure works

Client: Public Facilities Management Company (Kuwait)

Pre-qualification / EOIColombiaOpen – deadline not published

Bogotá Metro Line 2 – 15.5 km automated line, 11 stations (10 underground), 25 trains: three consortia prequalified in second tender (Mota-Engil/Spie Batignolles; Xi'an Rail Transportation Group; Sacyr/CAF), bids now requested

Client: Empresa Metro de Bogotá (EMB)

Contract awardSaudi Arabia · السعوديةContract awarded – subcontracting open

AlWadi development, Abha – infrastructure PMC/supervision (Dar Al Riyadh) and sewerage network construction (SAJCO) agreements

Awarded to Dar Al Riyadh; Shibh Al Jazira Contracting Co. (SAJCO) · Client: ARDARA (PIF)

Pre-qualification / EOIUnited StatesUSD 625MOpen – deadline not published

Lowcountry Rapid Transit – 21-mile, USD 625M bus rapid transit system; Charleston County 25-year half-cent sales tax (USD 860M for transit) approved by voters

Client: Charleston Area Regional Transportation Authority (CARTA)

Pre-qualification / EOIIndiaINR 20,000 crore (~USD 2.3bn)Open – deadline not published

Marathwada Water Grid Phase 1 – 3,095 km main & secondary pipelines and 15 WTPs linking six dams; JICA positive on ~INR 20,000 crore loan, PMC and DPR to follow

Client: Government of Maharashtra (JICA-financed)

Contract awardBrazilBRL 8.48MContract awarded – subcontracting open

CPTM contract LC00526-01 – engineering supervision of accessibility, NR-24 and fire-code (AVCB) works at Santo André and Mauá stations, Line 10-Turquesa (24 months)

Awarded to Consórcio Serra Turquesa · Client: CPTM (Companhia Paulista de Trens Metropolitanos)

Pre-qualification / EOIUnited StatesUSD 14.8–16.1bn (estimate)Open – deadline not published

New Chesapeake Bay Crossing – two new four-lane spans replacing the 4.3-mile Bay Bridge, US 50/301 widening to 8 lanes; FEIS/ROD approved, final-design procurement from 2028

Client: Maryland Transportation Authority (MDTA)

Pre-qualification / EOIMozambiqueUSD 7.5bn (programme)Open – deadline not published

Mozambique logistics corridors investment plan (~USD 7.5bn) – Maputo port & EN4, Beira corridor incl. Dondo dry port and Machipanda border, Nacala corridor

Client: Government of Mozambique

Pre-qualification / EOIPeruUSD 478MOpen – deadline not published

San Jerónimo–Urcos expressway – 34.35 km four-lane second carriageway (IIRSA Sur Tramo 1); MTC agreement signed to prepare definitive engineering study

Client: Ministerio de Transportes y Comunicaciones (MTC) / Gobierno Regional de Cusco / Carretera Andina del Sur

Pre-qualification / EOIAustraliaAUD 1.1BOpen – deadline not published

Anketell Road Upgrade Stage 1 – alliance EOI (four-lane widening, Leath Rd extension, Rockingham Rd interchange, Rockingham Rd widening)

Client: Main Roads Western Australia

Pre-qualification / EOIUnited StatesUSD 1.7bnOpen – deadline not published

Front Range Passenger Rail 'Colorado Connector' (Fort Collins–Denver–Colorado Springs–Pueblo) – Ballot Issue 7A 0.333% sales tax (~USD 295M/yr, USD 580M debt) passing; starter segment USD 333M (2029), Pueblo extension ~USD 1.7bn

Client: Front Range Passenger Rail District

Pre-qualification / EOIBrazilBRL 300M (~USD 55M)Open – deadline not published

Rio São Francisco waterway (~1,400 km), Sobradinho lock and 15 small port facilities handed to Codeba – BRL 300M interventions from 2027 in three stretches; EVTEA feasibility study to be procured next

Client: Ministério de Portos e Aeroportos / Codeba – Companhia das Docas do Estado da Bahia (DNIT supervision)

Pre-qualification / EOIBahrain · البحرينOpen – deadline not published

GCC Railway (2,117 km) – General Railway Agreement among six GCC states, network targeted for operation by Dec 2030

Client: GCC transport ministries (Bahrain MTT host)

Pre-qualification / EOIBraziln/d (program USD 100M)Open – closes 27 Nov 2026 (8 days)

Manifestação de Interesse SMOBI 96.047/2026 – supervision consultancy for BRT Amazonas transfer stations, Área Hospitalar road works and Barreiro bus lanes (World Bank-funded)

Client: Prefeitura de Belo Horizonte – SMOBI

Pre-qualification / EOITanzaniaOpen – deadline not published

TRC seeks PPP investors for two ~1,000 km SGR freight corridors (Tanga–Arusha–Musoma; Mtwara–Mbamba Bay) and finalising rolling-stock tenders (34 e-locos, 10 hybrid shunters, 1,000 wagons, 60 coaches, 5 EMUs)

Client: Tanzania Railways Corporation (TRC) / Ministry of Transport

Pre-qualification / EOIIraq · العراقOpen – deadline not published

Baghdad water and sewage projects – new World Bank financing under discussion (Ministry of Planning & Baghdad Municipality)

Client: Baghdad Municipality (Amanat Baghdad) / Ministry of Planning

Pre-qualification / EOIIndiaINR 30,000 croreOpen – deadline not published

NALCO Anugola brownfield aluminium smelter expansion (+0.5 Mtpa, INR 30,000 crore) with 1,080 MW (4x270 MW) captive power plant JV with NLC India

Client: National Aluminium Company Ltd (NALCO)

Open tenderUnited KingdomGBP 14.4MOpen – closes 04 Dec 2026 (15 days)

Transport Scotland multi-supplier framework – management systems audit, dispute/claims advice and cost estimation & quantification services (notice 104835-2026)

Client: Transport Scotland

Pre-qualification / EOISaudi Arabia · السعوديةOpen – deadline not published

North Riyadh 162 km road network masterplan around King Salman International Airport (multibillion programme)

Client: Royal Commission for Riyadh City (RCRC)

Pre-qualification / EOIChileUSD 4,450MOpen – deadline not published

Puerto Exterior de San Antonio (USD 4,450M) – ~4 km state-funded breakwater, two 1,730 m terminals, dredging, rail/road access; environmental approval cleared by Comité de Ministros

Client: Empresa Portuaria San Antonio (EPSA)

Pre-qualification / EOIUnited StatesUSD 1.1bnOpen – deadline not published

Platte Valley Water Partnership – 125-mile water pipeline, new plains reservoir and diversion structures (~USD 1.1bn); water-court approval granted, first phase in 5–7 years

Client: Parker Water & Sanitation District, Lower South Platte Water Conservancy District, Town of Castle Rock

Pre-qualification / EOICentral African RepublicOpen – closes 27 Nov 2026 (8 days)

EOI – design and operationalisation of a Road Asset Management System (RAMS) for the Ministry of Equipment and Public Works, PURIC/FA-82/SC/SFQC/26

Client: CEMAC-CAR Transport-Transit Facility coordination – CAR Emergency Infrastructure and Connectivity Recovery Project (World Bank)

Contract awardSaudi Arabia · السعوديةContract awarded – subcontracting open

Riyadh Metro Red Line extension (8.4 km, 5 stations, KSU–Diriyah South) – PMCM services awarded

Awarded to Riyadh Metro Transit Consultants (RMTC) – Parsons-led JV with Systra and Egis · Client: Royal Commission for Riyadh City (RCRC)

Contract awardCanadaContract awarded – subcontracting open

Contrecœur Container Terminal (Port of Montréal) – Egis–Arcadis JV (with Moffatt & Nichol) appointed Operator's Engineer to design land-side terminal: container yard, rail yard, buildings, utilities, crane rails, pavements & truck gates

Awarded to Egis–Arcadis JV (Moffatt & Nichol subconsultant) · Client: DP World (terminal operator) / Montreal Port Authority

Contract awardUnited KingdomContract awarded – subcontracting open

West London Orbital rail line (18.5 km Hounslow–Hendon) – WSP with Fereday Pollard and Costain appointed for business case and funding strategy

Awarded to WSP; Fereday Pollard; Costain · Client: Transport for London (TfL)

Contract awardTanzaniaTZS 3.025bn (4 contracts)Contract awarded – subcontracting open

TANROADS RISE bridges – design review & construction supervision of Lwanji, Mzinga, Lower Mpiji, Ununio JKT, Kalutu 2 & 3, Fuluwa and Namhanga bridges (4 contracts)

Awarded to Aarvee Associates Architects Engineers and Consultants Pvt Ltd · Client: Tanzania Roads to Inclusion and Socioeconomic Opportunities (RISE) Project

Pre-qualification / EOIBrazilOpen – closes 27 Nov 2026 (8 days)

Manifestação de Interesse SMOBI 96.047/2026 – EOI for supervision consultant: BRT/MOVE Amazonas, Área Hospitalar transfer stations and Barreiro bus lanes (World Bank-financed, QCBS)

Client: Prefeitura de Belo Horizonte – SMOBI / Sudecap (Programa de Mobilidade e Inclusão Urbana)

Open tenderKuwait · الكويتOpen – closes 08 Dec 2026 (19 days)

Project management services for 2020 Master Plan projects at Kuwait International Airport (8/2023/2024)

Client: General Administration of Civil Aviation (DGCA)

Contract awardNigeriaNGN 504.6MContract awarded – subcontracting open

AGILE – supervision of construction of 30 junior and 19 senior secondary schools in Kano State

Awarded to Intergraph Consultants · Client: Adolescent Girls Initiative for Learning and Empowerment (AGILE)

Contract awardZambiaUSD 338,690Contract awarded – subcontracting open

Construction supervision consultancy for upgrading ~8.31 km of Livingstone city-centre roads (6 months), GREAT-TDP

Awarded to Rankin Engineering Consultants · Client: Green, Resilient and Transformational Tourism Development Project (GREAT-TDP)

Open tenderBrazilBRL 8.61MOpen – closes 23 Dec 2026 (34 days)

Concorrência Eletrônica 90004/2026 – supervision & inspection support for BRT Sul works, subsections 3 and 4 (DF-003/EPIA to Terminal Asa Sul), 900 days, est. BRL 8.61M

Client: DER-DF – Departamento de Estradas de Rodagem do Distrito Federal

Contract awardColombiaCOP 255bn (works)Contract awarded – subcontracting open

Chinú–Lorica–San Bernardo del Viento ethno-agrotourism road corridor (~73 km, 36 months) – supervision (interventoría) awarded among ~70 bidders

Awarded to Consorcio Intervial Córdoba (supervision) · Client: Gobernación de Córdoba

Contract awardUnited StatesUSD 9.9MContract awarded – subcontracting open

Brooklyn Bridge Cable Hardening Project – USD 9.9M IDIQ A-E contract (W912DS-27-D-A001) to complete construction plans & specs and provide construction-phase support, through Sep 2031

Awarded to Thornton Tomasetti Inc. · Client: US Army Corps of Engineers, New York District

Pre-qualification / EOIIndiaUSD 139.55MOpen – deadline not published

ADB USD 139.55M loan for Puducherry urban services – 100 km water network upgrade, 80 km new pipelines, BWRO desalination plants, 270 km new sewers, 50 MLD STP, drainage rehab

Client: Government of Puducherry (ADB-financed)

Pre-qualification / EOIIndiaINR 138.56bnOpen – deadline not published

Mumbai Metro Line 12A (Manpada-Katai Naka–Taloja, 18.4 km elevated, 12 stations) with integrated 4/6-lane flyovers – cabinet approval

Client: Mumbai Metropolitan Region Development Authority (MMRDA)

Open tenderSouth AfricaOpen – closes 20 Nov 2026 (1 day)

Independent road safety audit services for upgrade of N1 Section 28, Dwarsrivier–Louis Trichardt (km 49.0–98.75) – N.001-280-2020/2RSA

Client: SANRAL

Open tenderSouth AfricaOpen – closes 04 Dec 2026 (15 days)

Consulting engineering services – design & supervision of pedestrian, public transport and road safety facilities on N2 Section 22X (km 0–20), Ray Nkonyeni – C.004-086-2022/1F

Client: SANRAL

Pre-qualification / EOIMoldovaEUR 397.3MOpen – deadline not published

M3 and R7 strategic road upgrades (~134 km) – EBRD EUR 344M sovereign loan signed; M3 works in four packages

Client: Ministry of Infrastructure and Regional Development / National Road Administration

Pre-qualification / EOICanadaCAD 5.9bnOpen – deadline not published

Roberts Bank Terminal 2 container terminal (CAD 5.9bn) – designated project of national interest; land reclamation from 2028, FID expected 2027

Client: Vancouver Fraser Port Authority

Open tenderArgentinaARS 39.6bnOpen – deadline not published

Supervision (inspección) of La Barrancosa hydroelectric dam on the Santa Cruz River and associated extra-high-voltage transmission line – national multi-stage public tender authorised (Res. SOP 274/2026)

Client: Secretaría de Obras Públicas / Subsecretaría de Recursos Hídricos

Pre-qualification / EOIUnited KingdomGBP 303MOpen – deadline not published

Leeds Existing Station Programme (LESP) – GBP 303M station enhancement: central overbridge, 3 new entrances, concourse upgrades, Platform 14 extension; GBP 200M core construction funding confirmed

Client: UK Department for Transport / Leeds Existing Station Programme

Contract awardUnited StatesUSD 37BContract awarded – subcontracting open

AEP USD 37B five-year transmission buildout (incl. ~USD 5B Piketon 765-kV lines) – Jacobs (7 eastern states) and WSP USA (4 western states) selected for engineering, siting, ROW, permitting and programme management

Awarded to Jacobs (with ORC, GFT, RC Commonwealth); WSP USA · Client: American Electric Power (AEP)

Contract awardUzbekistanContract awarded – subcontracting open

Upper Pskem hydropower plant – project management and technical supervision (PMC) consultancy contract signed

Awarded to Dolsar Engineering Inc. Co. · Client: Uzbekhydroenergo (Gidroqurilish Buyurtmachi Xizmati)

Pre-qualification / EOIIndiaUSD 139.55MOpen – deadline not published

Puducherry Integrated Urban Livability Improvement Project – 180 km water mains, 270 km new sewers, 50 MLD STP, BWRO desalination plants, storm drains (ADB USD 139.55M loan approved)

Client: Government of Puducherry (ADB project 59312-001)

Pre-qualification / EOIUnited KingdomGBP 450MClosed 13 Nov 2026

East West Rail Programme Support Works Framework (~GBP 450M, 6 lots: integrator/principal contractor GBP 80M, historic environment, ground investigation GBP 40M, ecology surveys & mitigation, enabling works GBP 133M) – requests to participate

Client: East West Rail Company

Contract awardRwandaRWF 2.545bn (works RWF 2.242bn + supervision RWF 147.4M + RWF 156.1M)Contract awarded – subcontracting open

Urgent bridge rehabilitation (design-and-build), Northern Province – works to EPOS Company (RWF 2.242bn, 12 months) and supervision to TECOS Ltd; TECOS also supervises Southern Province bridge repairs

Awarded to EPOS Company Ltd (works); TECOS Ltd (supervision) · Client: Rwanda Emergency Connectivity Restoration Project

Pre-qualification / EOIUzbekistanClosed 12 Nov 2026

Construction supervision consultant for sewerage networks & treatment plants contracts KSP-W-ICB-02 and KSP-W-NCB-05 – Nukus, Takhiatash, Khojeyli (KSP-CQS-02/2, World Bank EOI)

Client: Water Services and Institutional Support (WASIS) Project – Karakalpak Suv Taminoti / Uzsuvtaminot

Open tenderSouth AfricaOpen – closes 03 Dec 2026 (14 days)

Consulting engineering services for special maintenance of N2 Section 16 (N6 interchange to end of freeway, km 16.7–22.0), Buffalo City – N.002-160-2027/1F

Client: SANRAL

Contract awardUnited KingdomContract awarded – subcontracting open

Blaenau Gwent & Torfaen strategic development and investment partner (Pagabo Developer-Led Framework) – 12-month review of regeneration sites for homes, employment space and infrastructure

Awarded to Willmott Dixon Developments – Cityheart JV · Client: Blaenau Gwent County Borough Council and Torfaen County Borough Council

Open tenderUnited KingdomGBP 12bnOpen – closes 08 Jan 2027 (50 days)

Procure Partnerships National Developer Framework (GBP 12bn, 4 years) – 63 regional lots across 9 English regions, up to 8 development partners per lot (ref DN833035)

Client: Procure Partnerships Framework

Pre-qualification / EOIVietnamUSD 17.4bnOpen – deadline not published

Lai Chau 23.4 GW energy complex – To Y Phin 6,400 MW pumped-storage hydropower, nine solar plants (17 GW) and 500 kV substations/lines (~USD 17.4bn proposal)

Client: Xuan Thien Group

Contract awardUnited KingdomGBP 42MContract awarded – subcontracting open

DLR Thamesmead extension (3 km, viaduct, 1.5 km twin-bore Thames tunnel, 2 stations) – early contractor involvement and early works to Amey Rail (up to GBP 42M)

Awarded to Amey Rail · Client: Docklands Light Railway (Transport for London)

Pre-qualification / EOIMozambiqueOpen – closes 20 Nov 2026 (1 day)

EOI – supervision of construction of substructures and installation of 11 metallic bridges in Cabo Delgado province, ref. 47A003041/CP/34/2026 (World Bank CRRN)

Client: Climate Resilient Roads for the North Project – Administração Nacional de Estradas (ANE, IP)

Pre-qualification / EOIBurkina FasoClosed 10 Nov 2026

EOI – supervision & control of works for 2,000 ha Niéna-Dionkélé irrigated perimeter (1,500 ha rehab + 500 ha extension, warehouses, water points), BF-PATA-578228-CS-QCBS (World Bank)

Client: Burkina Faso Agricultural Transformation Project (PATA-BF) – MAERAH / Direction des Marchés Publics

Pre-qualification / EOIBurkina FasoClosed 12 Nov 2026

EOI – supervision & control of works for 3,760 ha irrigated perimeters (Lahirasso, Sanekui2, Bassé incl. intake, Mouhoun bridge, bank protection), 2 missions, BF-PATA-578227-CS-QCBS (World Bank)

Client: Burkina Faso Agricultural Transformation Project (PATA-BF) – MAERAH / Direction des Marchés Publics

Pre-qualification / EOIKenyaKES 150–200bn (est.)Open – deadline not published

Nairobi–Thika elevated expressway (~60 km, Museum Hill–Thika) – feasibility under way, PPP planned, groundbreaking targeted within two months

Client: Government of Kenya

Pre-qualification / EOIMorocco · المغربMAD 8bnOpen – deadline not published

Tanger Med 3 port – new port west of Tanger Med 2 with 1,200 m of quay and up to 4.5M TEU/yr (MAD 8bn); Maersk–APM container terminal concession signed, construction works to launch

Client: Tanger Med Special Agency (TMSA)

Pre-qualification / EOIGeorgiaUSD 20.7MOpen – closes 10 Dec 2026 (21 days)

Kobuleti Bypass Lots 1 & 2 upgrade to 4-lane motorway – construction supervision consultancy EOI (KBP/CS/QCBS-01, ADB loan, 108 months)

Client: Roads Department of Georgia (Ministry of Regional Development and Infrastructure)

Pre-qualification / EOIIndiaINR 175.4bnOpen – deadline not published

Four link expressways (~322 km) – Farrukhabad (90.9 km), Agra–Lucknow–Purvanchal link (50.9 km), Jhansi (~106 km), Jewar (~74 km) – Cabinet approval, EPC packages to follow

Client: Uttar Pradesh Expressways Industrial Development Authority (UPEIDA)

Contract awardSaudi Arabia · السعوديةContract awarded – subcontracting open

Petro Rabigh – engineering, FEED-package and project-management services for future refining & petrochemical projects

Awarded to Worley · Client: Rabigh Refining and Petrochemical Co. (Petro Rabigh)

Contract awardSaudi Arabia · السعوديةContract awarded – subcontracting open

Expo 2030 Riyadh – programme-wide procurement advisory services appointed

Awarded to Mace Consult · Client: Expo 2030 Riyadh Company

Pre-qualification / EOIMozambiqueClosed 11 Nov 2026

Detailed design, E&S instruments and construction supervision for water supply, faecal sludge treatment plant and sanitation blocks – Vilankulo, Pambarra, Mapinhane, FIPAAS/UWSP/CON-02/26 – consultant EOI (World Bank)

Client: Urban Water Security Project – Water Supply Asset Holding and Investment Fund (FIPAAS)

Pre-qualification / EOIDemocratic Republic of CongoClosed 11 Nov 2026

Supervision & control of Avenue Makala rehabilitation (~2.65 km) with erosion stabilisation works, Kalemie, ZR-PRIUR-567668-CS-QCBS – consultant EOI (World Bank)

Client: DRC Urban Flood Resilience Project (PRIUR)

Pre-qualification / EOIOman · عُمانOMR 20MOpen – deadline not published

Youth Centre headquarters, Muscat – incubators, co-working, fabrication labs, training halls and studios funded by OQ (RO 20M agreement signed)

Client: The Youth Centre (funded by OQ Group)

Open tenderKenyaKES 337BOpen – closes 24 Nov 2026 (5 days)

Kibuka High Grand Falls multipurpose dam (700 MW hydro, 5.6 bn m³ reservoir, irrigation) – PPP transaction advisor tender re-advertised

Client: National Treasury of Kenya – PPP Directorate (with KenGen)

Pre-qualification / EOICameroonOpen – deadline not published

EOI – Consultants for control and supervision of rehabilitation works (AfDB-financed)

Client: Government of Cameroon (AfDB project)

Pre-qualification / EOIKuwait · الكويتOpen – deadline not published

Infrastructure improvement in Rawda, Adailiya and Khaldiya – planned tender for studies, design and supervision (MPW/CAPT)

Client: Ministry of Public Works (with Central Agency for Public Tenders)

Contract awardSaudi Arabia · السعوديةSAR 55.6MContract awarded – subcontracting open

Al-Arid district residential project (8,800 m² plot) – development and construction-supervision agreement

Awarded to Asas Makeen for Real Estate Development and Investment · Client: In Building Company (landowner)

Pre-qualification / EOIUnited KingdomGBP 100MClosed 16 Nov 2026

Herts, Beds & Bucks Development Framework Gen2 (ECH1424) – construction works & consultancy, market engagement

Client: Chime Housing

Open tenderTurkeyOpen – closes 30 Nov 2026 (11 days)

Implementation & Monitoring Support – EQR Malatya Water and Wastewater Network Rehabilitation (EBRD)

Client: İller Bankası A.Ş. (ILBANK)

Pre-qualification / EOIKuwait · الكويتOpen – deadline not published

Infrastructure improvement in Rawda, Adailiya and Khaldiya - study, design and supervision (tender not yet floated)

Client: Ministry of Public Works

Pre-qualification / EOIVietnamVND 39,600bnOpen – deadline not published

Son Duong Logistics & Port-Back Services Centre (472.6 ha incl. 158.2 ha reclamation, 50 Mt/yr) – investment policy & Vinhomes Ha Tinh approved (VND 39,600bn)

Client: Vinhomes Ha Tinh Industrial Park Investment JSC (Vingroup)

Contract awardKuwait · الكويتKD 1.99MContract awarded – subcontracting open

KNPC Mina Al-Ahmadi refinery – consultancy for replacement of catalyst regeneration unit, flue gas cooler & related facilities (KD 1.99M)

Awarded to Lowest compliant bidder (not named) · Client: Kuwait National Petroleum Company (KNPC)

Pre-qualification / EOIDominican RepublicClosed 12 Nov 2026

Supervision support for MV/LV network rehabilitation, transformers and 147,000-customer normalization – EDEESTE, 30 months (World Bank EOI)

Client: Distribution Efficiency Improvement and Utility Strengthening Project – Empresa Distribuidora de Electricidad del Este (EDEESTE)

Pre-qualification / EOISouth AfricaOpen – deadline not published

Eskom Thyspunt 5,200 MW nuclear power plant – final scoping report accepted, project moves to full EIA phase

Client: Eskom

Pre-qualification / EOIUnited KingdomGBP 600MOpen – deadline not published

Only Rainwater into Windermere programme (up to GBP 3.7bn) – GBP 600M design & integration appointment, tender notice due early Nov 2026 (tunnels, up to 138 km sewers, new treatment works)

Client: United Utilities

Pre-qualification / EOIKenyaOpen – deadline not published

Upgrading of El Wak–Rhamu A13 road, Horn of Africa Isiolo–Mandera corridor – AfDB procurement plan published

Client: Government of Kenya / KeNHA (AfDB-financed Isiolo–Mandera corridor programme)

Pre-qualification / EOISaudi Arabia · السعوديةOpen – deadline not published

Export-oriented low-carbon fuels plant (50,000 t/yr phase 1, up to 400,000 t/yr in 3 phases) – Go Energy & Clean Energy Co/SARCO alliance, engineering design started, operation targeted Q1 2029

Client: Go Energy Group / Clean Energy Co (Ethraa Group) with SARCO

Pre-qualification / EOIMozambiqueClosed 13 Nov 2026

Construction supervision – bridge substructures and metal bridge installation, Niassa province (World Bank EOI)

Client: Climate Resilient Roads for the North Project – National Road Administration (ANE, IP)

Pre-qualification / EOIMozambiqueClosed 13 Nov 2026

Construction supervision – bridge substructures and metal bridge installation, Nampula province (World Bank EOI)

Client: Climate Resilient Roads for the North Project – National Road Administration (ANE, IP)

Pre-qualification / EOIGuinea-BissauEUR 60–100M (2019 est.)Open – deadline not published

Saltinho 20 MW run-of-river hydropower plant on the Corubal River – project approved by government (est. EUR 60–100M, 2019 estimate)

Client: Ministry of Natural Resources, Guinea-Bissau / OMVG

Pre-qualification / EOIRwandaOpen – deadline not published

Bugesera Formula One circuit next to new Kigali International Airport – layout design by Tilke Engineers & WurzDesign under way (RDB-led, 10-year F1 hosting deal)

Client: Rwanda Development Board

Pre-qualification / EOIKenyaKES 651bnOpen – deadline not published

Naivasha–Kisumu–Malaba SGR phases 2B/2C (369 km) – Treasury cost estimate raised to KES 651bn; ~KES 619bn external financing sought

Client: Government of Kenya – National Treasury / Kenya Railways

Contract awardNorwayContract awarded – subcontracting open

Wisting oil field – FEED for FPSO topsides with option for engineering, procurement & project management (EPma)

Awarded to Aibel · Client: Equinor (operator; partners Aker BP, Petoro, INPEX Idemitsu Norge)

Contract awardTurkeyTRY 9.2MContract awarded – subcontracting open

BASKİ – construction consultancy for 3 advanced biological WWTPs (Edremit Zeytinli incl. deep-sea outfall, Balıkesir Merkez, Altınoluk Doğu & Güre incl. sewer line), KİK 2026/1794103, /1794105, /1794655 (TRY 9.2M)

Awarded to Liv Mühendislik · Client: Balıkesir Metropolitan Municipality Water & Sewerage Administration (BASKİ)

Pre-qualification / EOIOman · عُمانUSD 1.3bnOpen – deadline not published

Yamna AI data centre in Salalah – first phase (USD 1.3bn+ initial investment) agreed under UK–Oman investment partnership

Client: Yamna

Pre-qualification / EOIPakistanOpen – deadline not published

NHA PPP pipeline – M-10 Motorway 169 km section, Mansehra–Naran–Jalkhad–Chilas road to Chinese border, Guru Nanak Expressway; preliminary work ordered

Client: National Highway Authority (NHA) / Ministry of Communications

Pre-qualification / EOIKuwait · الكويتOpen – deadline not published

Nurses' housing in several health districts – study, design and supervision consultancy: bids from four prequalified firms opened, CAPT approves technical evaluation

Client: Ministry of Health, Kuwait (via CAPT)

Open tenderUnited KingdomGBP 1.5MOpen – closes 20 Nov 2026 (1 day)

Wood Green Central Multi-Disciplinary Team – architecture/engineering services, Find a Tender 099724-2026 (GBP 1.5M)

Client: London Borough of Haringey

Pre-qualification / EOIUkraineEUR 60MOpen – deadline not published

Upgrade of western Ukraine border-crossing points (terminals, waiting areas, shelters, access roads, customs equipment) – EIB loan signed (EUR 60M + EUR 6M EU grant)

Client: Ministry for Recovery, Infrastructure and Transport of Ukraine / State Agency for Restoration and Infrastructure Development (SARDI)

Pre-qualification / EOIBahrain · البحرينBHD 0.49MOpen – deadline not published

EWA consultancy for Khalifa City housing project transmission network – two new 66 kV substations (design, tendering, contract management, supervision): 2 bids opened, lowest BHD 493,680 (AtkinsRéalis)

Client: Electricity and Water Authority (EWA), Bahrain – Planning and Studies

Pre-qualification / EOIUnited StatesOpen – deadline not published

Will Rogers International Airport 25-year expansion programme ('Cleared for Takeoff')

Client: City of Oklahoma City / Oklahoma City Airport Trust

Open tenderQatar · قطرOpen – closes 22 Nov 2026 (3 days)

Post-contract consultancy for design & build of dhow jetty and floating jetty at Museum of Islamic Art (MIA) – Ashghal PWA/STC/45/2026

Client: Public Works Authority (Ashghal)

Pre-qualification / EOIUnited StatesUSD 218MOpen – deadline not published

Hiawatha West passenger rail extension (Milwaukee to Waukesha, Jefferson & Dane counties) – FRA CRISI FY2025-26 grant to WisDOT, largest of 105 awards totalling USD 2.3bn (USD 218M)

Client: Wisconsin Department of Transportation (WisDOT) / Federal Railroad Administration

Pre-qualification / EOINigeriaOpen – deadline not published

Lagos airport monorail – 5-station link from Ikeja Red Line station to new MMIA Terminal 1, design approved by Aviation Ministry & FAAN

Client: Federal Ministry of Aviation and Aerospace Development / FAAN

Open tenderUnited KingdomGBP 1.4MOpen – closes 30 Nov 2026 (11 days)

IT0043 Flooding Term Commission 2027-2031 – civil engineering consultancy, Find a Tender 098828-2026 (GBP 1.4M)

Client: Falkirk Council

Pre-qualification / EOIEgypt · مصرEGP 11,000bnOpen – deadline not published

Talaat Moustafa Group – EGP 11trn partnership agreement with the state for four mixed-use mega-projects (Suez Road–Madinaty strip 5M m², central Alexandria 11.3M m², Abu Qir port industrial-logistics zone 10M m², North Coast km 147–151 10.4M m²)

Client: Talaat Moustafa Group (TMG) / Government of Egypt

Pre-qualification / EOIUAE · الإماراتUSD 3.8–8M (bids)Open – deadline not published

DEWA consultancy for water treatment plants and associated infrastructure (design, supervision, operational support) – 11 bids, lowest USD 3.8M (Capital Engineering Consultancy), award expected Jan 2027

Client: Dubai Electricity and Water Authority (DEWA)

Pre-qualification / EOIUnited StatesUSD 205M (federal grant)Closed 28 Oct 2026

Coos Bay Rail Line (111 mi) / Pacific Coast Intermodal Port – USDOT grant of ~USD 205M secured; contractor proposals for permitting & environmental review due 28 Oct

Client: Oregon International Port of Coos Bay (Pacific Coast Intermodal Port project)

Pre-qualification / EOIMalawiOpen – deadline not published

Kamuzu Stadium demolition and replacement with new venue + Mpira Stadium capacity expansion – approved by President, plans being drawn up

Client: Government of Malawi / Football Association of Malawi (FAM)

Open tenderJordan · الأردنOpen – deadline not published

National wastewater reuse masterplan to 2050 – consultancy RFP to identify and prioritise reuse options

Client: Government of Jordan (water sector client not named in public teaser)

Pre-qualification / EOISaudi Arabia · السعوديةSAR 14bnOpen – deadline not published

Arada KSA Al Rimal master community, north-east Riyadh – ~3,500 villas & townhouses on 2.5M m² with school, retail & sports facilities (SAR 14bn, construction from 2027)

Client: Arada KSA (Arada / XTOPIA)

Pre-qualification / EOIGhanaClosed 04 Nov 2026

STARR-J construction supervision of 212 school sites (12 new SHS/TVIs, 50 upgrades, 150 rehabilitations) in 9 zones, MOE/STARR-J/CS/2/PostZ1-9/2026 – consultant EOI (World Bank)

Client: Secondary Education Transformation for Access, Relevance and Results for Jobs (STARR-J) – Ministry of Education Ghana

Pre-qualification / EOISenegalClosed 03 Nov 2026

Supervision & control of ancillary works (classrooms, health posts, markets, warehouses, multifunctional platforms) along Koussanar–Koumpentoum and Tambacounda–Goumbayel–Diankè Makha roads, PCZA phase 2 – AGEROUTE consultant EOI (World Bank)

Client: Enhancing Connectivity in the Northern and Central Agricultural Production Areas of Senegal (PCZA) – AGEROUTE

Pre-qualification / EOIPhilippinesPHP 81.6bnOpen – deadline not published

Mindanao Railway Phase 1 (Tagum–Davao–Digos, 100.2 km, 8 stations, PHP 81.6bn) – government seeking G2G and multilateral financing partners after China withdrawal

Client: Department of Transportation (DOTr), Philippines

Open tenderPolandOpen – closes 23 Nov 2026 (4 days)

S6 Szczecin western bypass – 5 km TBM road tunnel under the Oder: 8-year scientific-technical advisory & supervision tender (bids due 23 Nov)

Client: GDDKiA Szczecin

Pre-qualification / EOIBrazilBRL 400MOpen – deadline not published

Sistema Adutor Ramal do Piancó – ~20 km water conveyance from PISF Eixo Norte to Piancó basin (2–4 m³/s), first-stage tender in preparation

Client: Ministério da Integração e do Desenvolvimento Regional (MIDR) – Novo PAC

Pre-qualification / EOISouth AfricaOpen – deadline not published

Independent Transmission Projects (ITP) Programme – second draft RFP to 7 pre-qualified bidders by end-2026, final RFP Q2 2027

Client: National Treasury / Department of Electricity and Energy

Pre-qualification / EOITanzaniaOpen – deadline not published

Mtwara–Songea–Mbamba Bay railway (+ Mchuchuma/Liganga branches) – TRC MoU with Arab Contractors for feasibility studies

Client: Tanzania Railways Corporation (TRC)

Pre-qualification / EOIGuineaEUR 300MOpen – deadline not published

Labé–Tougué national road (149 km) + Banti–Koubia (11 km) + 200 m Bafing bridge – EUR 300M loan approved

Client: Government of Guinea – Ministry of Infrastructure

Contract awardCzechiaCZK 97.2M excl. VATContract awarded – subcontracting open

Ostrava-Poruba new tram line (~3.3 km, 6 stops, traction substation, 189-space car park) – design, permitting & construction supervision contract

Awarded to AFRY CZ / AFRY Slovakia / Dopravní projektování · Client: Dopravní podnik Ostrava (DPO)

Open tenderOman · عُمانOpen – closes 23 Nov 2026 (4 days)

Consultancy services for Level of Service study – potable water, wastewater & treated effluent (T/OW/T/10007/2026)

Client: Nama Water Services

Open tenderPakistanOpen – deadline not published

Consultancy services for upgrading Pakistan Railways Main Line-1 (Karachi–Rohri section)

Client: Pakistan Railways

Pre-qualification / EOISyria · سورياUSD 406MOpen – deadline not published

Saudi Fund for Development concessional financing for Syrian projects (~USD 1.5B in stages; first USD 406M package due for signing) – energy, health, housing, infrastructure & roads

Client: Syrian Ministry of Finance / Saudi Fund for Development

Pre-qualification / EOIEgypt · مصرUSD 1.5BOpen – deadline not published

Fertiglobe 1.3 Mtpa diammonium phosphate (DAP) fertilizer complex – feasibility studies under way (USD 1.5B+, operations targeted 2031)

Client: Fertiglobe

Pre-qualification / EOIQatar · قطرOpen – deadline not published

Ashghal second development package – Ras Laffan Hospital development, Asian Games Doha 2030 sports facilities and 2.2 MW solar station at North Doha Station (being prepared; new tenders with MoF)

Client: Public Works Authority (Ashghal)

Pre-qualification / EOIIraq · العراقOpen – deadline not published

Baghdad Tigris river taxi – National Investment Commission preparing investment file (river channel works, tourism-style stations, kiosks & accessibility)

Client: National Investment Commission (NIC), Iraq

Pre-qualification / EOIKenyaKES 60bn (phase 1)Open – deadline not published

Lake Victoria Ring Road (~612 km incl. 112 km Kisumu–Busia) – KES 60bn phase 1, construction targeted to start before end-2026

Client: Ministry of Roads and Transport, Kenya (World Bank co-financing)

Contract awardTurkeyTRY 335.6MContract awarded – subcontracting open

Antalya Stage 4 rail system lines (Konyaaltı–Varsak) – construction supervision & consultancy, preferred bidder Yüksel Proje

Awarded to Yüksel Proje · Client: Antalya Metropolitan Municipality (Fen İşleri Dairesi)

Pre-qualification / EOILatviaEUR 264MOpen – deadline not published

Riga Airport (Rail Baltica station) – Imanta 1,520 mm rail link and modernisation of Imanta–Riga Central–Ogre, EU Cohesion Fund agreement signed

Client: Latvijas dzelzceļš (LDz) and Eiropas Dzelzceļa līnijas (EDzL)

Pre-qualification / EOITurkeyClosed 03 Nov 2026

Energy audits, detailed design and supervision of renovation works – 21 public building blocks in Konya (~99,200 m²) (World Bank EOI)

Client: Second Energy Efficiency in Public Buildings (E3 MPA) – Ministry of Environment and Urbanization

Pre-qualification / EOIMorocco · المغربClosed 05 Nov 2026

Technical studies and OPC/supervision of works for 16 transferred CCAs (Souss Massa, Gharb, Tadla, Loukkos, Moulouya) (World Bank EOI)

Client: Resilient and Sustainable Water in Agriculture – National Agricultural Extension Agency (ONCA)

Pre-qualification / EOIGeorgiaClosed 17 Nov 2026

Supervision of design & build of railway and related infrastructure connecting to Anaklia deep-sea port (World Bank EOI)

Client: Trans-Caspian Transport Corridor – Georgia Accessibility and Transport Enhancement Project – JSC Georgian Railway

Pre-qualification / EOIKazakhstanClosed 30 Oct 2026

Construction supervision consultant – Jezkazgan–Karagandy section, Trans-Caspian International Transport Route (World Bank EOI)

Client: Transport Resilience and Connectivity Enhancement Project – JSC NC KazAutoZhol

Pre-qualification / EOIUnited StatesUSD 130MOpen – deadline not published

Springfield Hub Modernization (Union Station tracks & signals reconfiguration) – USD 130M FRA CRISI grant awarded, design to start

Client: Massachusetts Department of Transportation (MassDOT)

Open tenderBrazilBRL 2.06bnOpen – closes 17 Dec 2026 (28 days)

Brasília International Airport concession re-tender + 10 regional airports (AmpliAR) – new international terminal, parking building & access road (BRL 1.2bn) plus BRL 858M regional terminal works; auction 17 Dec 2026

Client: Ministry of Ports and Airports / ANAC / PPI

Pre-qualification / EOITurkeyUSD 1500MOpen – deadline not published

TVF İzmir Port USD 1.5bn two-phase modernisation – dredging for 400 m ships, quay renewal and cruise quay rebuild (3M TEU target)

Client: TVF İzmir Limanı Yönetim ve Yatırım AŞ (Türkiye Wealth Fund)

Pre-qualification / EOIChileUSD 4,853MOpen – deadline not published

MOP 2026 concessions pipeline (USD 4.85bn, 12 projects) – Ruta 5 Collipulli–Temuco, Ruta 57 Santiago–Los Andes, Accesos a Valdivia, Calama prison and Alto Hospicio–Iquique cable car still in tender; 7 others postponed

Client: Ministerio de Obras Públicas – Dirección General de Concesiones

Pre-qualification / EOIMongoliaOpen – deadline not published

4.5 GW wind & solar plus 500 MWh storage with cross-border transmission for export to China – ACWA / Sun Steppe Power MoU

Client: Sun Steppe Power (Petro Matad / Sunsteppe Energy) with ACWA

Pre-qualification / EOIGhanaEUR 323MOpen – deadline not published

Northern Ghana Water and Sanitation Project (Tamale, Yendi, Damongo) – EUR 323M package: EIB EUR 225M loan + EU EUR 68M & Invest International EUR 30M grants

Client: Government of Ghana (Ministry of Finance / Ghana Water Limited)

Pre-qualification / EOIMozambiqueUSD 20MOpen – deadline not published

Angoche port construction – USD 20M BADEA financing agreement signed; works procurement to follow

Client: Government of Mozambique (Ministry of Finance / transport sector)

Pre-qualification / EOIUnited StatesUSD 550MOpen – deadline not published

S-Line passenger rail (Raleigh–Richmond, ~75 mi) – USD 550M FRA Federal-State Partnership funds obligated for track repairs and upgrades

Client: NCDOT / Virginia Passenger Rail Authority (FRA funding)

Pre-qualification / EOIUnited StatesUSD 3.9BOpen – deadline not published

Savannah Container Terminal (USD 2.3B, 350 acres, +3.5M TEU, Hutchinson Island) & Ocean Terminal renovation (USD 1.6B) – Army Corps permit approved

Client: Georgia Ports Authority

Pre-qualification / EOILebanon · لبنانOpen – deadline not published

Qatar–Lebanon energy package – QatarEnergy/TotalEnergies solar power plant agreement and planned BOT rehabilitation of Lebanon's power generation

Client: Government of Lebanon / QatarEnergy (with TotalEnergies)

Contract awardBrazilBRL 4.8MContract awarded – subcontracting open

Supervision of design-and-build contract for CEPDEC disaster response centre (CERD), Espírito Santo – consultancy awarded (World Bank)

Awarded to Concremat Engenharia e Tecnologia S/A · Client: Espírito Santo Water Security Management Project – CBMES/CEPDEC

Pre-qualification / EOIMexicoOpen – deadline not published

Pajaritos complex biorefinery (SAF / renewable diesel, 5,000 bpd) – feasibility study launched

Client: Not disclosed

Pre-qualification / EOIMozambiqueUSD 2.8bnOpen – deadline not published

'Mais Estradas – 2031' 2027 programme – 3,000+ km of road works (USD 2.8bn), bids under evaluation; Maputo province N2/N3/N4 (~200 km) concession planned

Client: Ministry of Transport and Logistics / ANE

Pre-qualification / EOIArgentinaOpen – deadline not published

Railway branches C14 (Salta–Socompa/Antofagasta) and C15 (Salta–Bolivia) – Economy Ministry to call mining and logistics operators to invest in rehabilitation

Client: Ministerio de Economía de la Nación

Pre-qualification / EOIAustraliaOpen – deadline not published

Gippsland offshore wind transmission – 60 km 500 kV double-circuit line Giffard terminal station to Loy Yang (2 GW) – Acciona named preferred development partner

Client: VicGrid (Victorian Government)

Pre-qualification / EOICameroonUSD 2,230MOpen – deadline not published

New Douala metropolitan airport (~USD 2bn) – feasibility study under discussion with A. Epstein and Sons International & ITF; plus USD 230M theatres in Yaoundé, Douala, Bamenda

Client: Government of Cameroon

Pre-qualification / EOIUnited KingdomGBP 3,500MOpen – deadline not published

Ofgem OFTO Tender Round 14 – Hornsea 3 offshore transmission assets (two offshore converter stations, export & onshore cables, Norfolk converter station), launch 21 Oct 2026

Client: Ofgem (Hornsea 3 developer Ørsted)

Pre-qualification / EOIIraq · العراقUSD 250MOpen – deadline not published

Kempinski-managed integrated hotel complex (rooms, villas, apartments, conference & events facilities on 20–30 dunams) – USD 250M investment proposal to NIC

Client: Jawad al-Qassab investment group / National Investment Commission (NIC)

Pre-qualification / EOIIndonesiaClosed 23 Oct 2026

Marine warranty surveyor for Ande-Ande Lumut WHCPP – prequalification (35-PRJ-PENN-VIII-2026)

Client: Prima Energy Northwest Natuna Pte. Ltd.

Pre-qualification / EOIUAE · الإماراتUSD 1090MOpen – deadline not published

Samana Collecta, The World Islands – 840 branded residences + floating and tree villas on ~6 island plots, with island utilities and marine transport (GDV AED 4bn)

Client: Samana Developers

Pre-qualification / EOIUzbekistanUSD 200MOpen – deadline not published

Modernization of Electricity Distribution Systems Program – ADB USD 200M loan signed (upgrade of 60 distribution substations, digital network management), ADB 58309-001

Client: Government of Uzbekistan / JSC National Electric Grid of Uzbekistan (ADB-financed)

Pre-qualification / EOIUgandaClosed 29 Oct 2026

Construction supervision consultant – design & build upgrade of Katuna–Muko–Kamuganguzi road (104 km) Lot II, gravel to bitumen – REOI MOWT/CONS/2026-2027/00028

Client: Ministry of Works and Transport, Uganda – Laropi-Moyo-Afoji/Katuna-Muko-Kamuganguzi Road Project (AfDB, P-UG-DB0-035)

Pre-qualification / EOIJordan · الأردنOpen – deadline not published

Al-Mujib 450 MW pumped-hydro energy storage PPP – prequalification launched

Client: Government of Jordan (Ministry of Energy and Mineral Resources)

Pre-qualification / EOISaudi Arabia · السعوديةOpen – deadline not published

UK Pavilion at Expo 2030 Riyadh – early market engagement for design, project management and construction partners

Client: UK Government

Pre-qualification / EOINigeriaClosed 30 Oct 2026

Design review & construction supervision of Jakara–Wasai River Irrigation Scheme (JAWARIS), Kano SPIN – EOI NG-KANO STATE SPIN-575102-CS-QCBS

Client: Kano State Ministry of Agriculture & Natural Resources – SPIN Project (World Bank IDA)

Pre-qualification / EOICameroonEUR 229.9MOpen – deadline not published

Douala–Bafoussam N5 road rehabilitation – 218.9 km in 3 lots (Bekoko–Penja, Penja–Nkam bridge, Nkam bridge–Bandjoun) + ~108 km feeder roads + ~30 km Bafoussam bypasses, IsDB loan signed (EUR 229.9M total)

Client: Ministry of Public Works, Cameroon (IsDB-financed)

Pre-qualification / EOIUnited StatesOpen – deadline not published

The Plaza Hotel landmark facade restoration – hotel to close January 2027 for a multiyear (4+ year) restoration programme

Client: The Plaza (Fairmont Hotels & Resorts / Accor brand)

Open tenderSaudi Arabia · السعوديةOpen – deadline not published

GCC Railway Saudi section – design review and oversight consultant (audit of design deliverables); award targeted by 1 Nov

Client: Saudi Arabia Railways (SAR)

Contract awardUnited KingdomContract awarded – subcontracting open

Northern Powerhouse Rail – system integration of six projects and Leeds–Sheffield corridor upgrade development

Awarded to Amey · Client: Network Rail (Development and Design Partnership Framework)

Pre-qualification / EOIKuwait · الكويتOpen – deadline not published

Two crude oil export pipelines via Saudi Arabia and UAE bypassing the Strait of Hormuz – study stage

Client: Kuwait Oil Company (KOC)

Pre-qualification / EOIBrazilBRL 102.7bnOpen – deadline not published

Ministry of Transport 2027 portfolio – 11 new federal highway concession contracts (BRL 102.7bn) plus 18 rail projects, launched at B3 on 15 Oct

Client: Ministério dos Transportes

Pre-qualification / EOISouth AfricaOpen – closes 30 Nov 2026 (11 days)

Tubatse Pumped Storage Scheme 1.5 GW / 21 GWh – RFQ E3611GXR for strategic partner (develop, finance, deliver)

Client: Eskom Green (Eskom subsidiary)

Pre-qualification / EOIPeruPEN 390MOpen – deadline not published

Magollo wastewater treatment plant (PTAR) – MVCS/CAF push to unblock S/ 390M project, final studies & financing structuring

Client: Ministerio de Vivienda, Construcción y Saneamiento (MVCS) / Municipalidad Provincial de Tacna

Pre-qualification / EOICanadaCAD 269MOpen – deadline not published

NB Power Mactaquac hydro life-extension (CAD 219M CIB development loan) & Salisbury Terminal STATCOM (CAD 50M)

Client: NB Power

Pre-qualification / EOIBeninEUR 576MOpen – deadline not published

Godomey–Ouidah–Hillacondji road widening & upgrading (Abidjan–Lagos corridor) – EUR 306.9M IsDB financing signed, total cost EUR 576M

Client: Government of Benin

Pre-qualification / EOIAzerbaijanUSD 302MOpen – deadline not published

Baku Metro signalling modernisation – CBTC, operations control centre and digital systems (ADB loan USD 302M, total USD 515M)

Client: Baku Metro CJSC / Government of Azerbaijan (ADB, AIIB co-finance)

Pre-qualification / EOIIraq · العراقOpen – deadline not published

Mosul International Airport – government invitation to airport operators/investors to develop and manage the airport

Client: Government of Iraq (Prime Minister's Office)

Open tenderOman · عُمانOpen – closes 30 Nov 2026 (11 days)

Hot Springs geothermal project phases 2 & 3 – resource-assessment consultancy and temperature-gradient drilling programme (tender OPWP/2026/042)

Client: Nama Power and Water Procurement Company (PWP)

Pre-qualification / EOIPakistanUSD 705MOpen – deadline not published

M-6 Hyderabad–Sukkur Motorway: Sections III & IV bids under evaluation, Section V bids opening Oct 2026 (IsDB/OPEC Fund USD 705M); Sections I–II PPP award targeted Feb 2027

Client: National Highway Authority (NHA), Pakistan

Pre-qualification / EOIUnited StatesUSD 2.2bnOpen – deadline not published

Bayer modular pharmaceutical manufacturing campus – drug-substance module then drug-product module, New Albany International Business Park

Client: Bayer (Pharmaceuticals)

Pre-qualification / EOIOman · عُمانOpen – deadline not published

Aims Bay coastal tourism project – MoU for waterfront, boat marina, tourism & service facilities infrastructure

Client: Musandam Governorate

Pre-qualification / EOIUnited StatesOpen – closes 15 Dec 2026 (26 days)

DART Westmoreland Station TOD – RFQ & concepts for 18.3-acre mixed-use development (Red Line, Oak Cliff), long-term ground lease

Client: Dallas Area Rapid Transit (DART)

Pre-qualification / EOIKenyaUSD 189MOpen – deadline not published

Kenya–South Sudan road corridor Phase 1 – Lesseru–Kitale and Morpus–Lokichar upgrading, AfDB procurement plan published (project ~USD 189M)

Client: Kenya National Highways Authority (KeNHA) – Kenya–South Sudan Road Corridor Project

Pre-qualification / EOICameroonEUR 310MOpen – deadline not published

Ngoura II–Yokadouma road (156 km) development & paving, PDCBET Phase 1 – AfDB procurement plan published (EUR 310M AfDB loan)

Client: Government of Cameroon – PDCBET (East region cross-border connectivity programme)

Pre-qualification / EOIAzerbaijanUSD 350MOpen – deadline not published

Bilajari–Yalama railway upgrade – electrification, signalling & telecoms (ADB USD 350M, total USD 448M, completion 2030)

Client: Azerbaijan Railways (ADY) CJSC

Pre-qualification / EOIPeruUSD 844MOpen – deadline not published

Ciudad-Puerto Corío – three-stage multipurpose port terminal (bulk, general cargo, containers) + 34,000 ha logistics city; ProInversión–GORE Arequipa agreement

Client: ProInversión / Gobierno Regional de Arequipa

Pre-qualification / EOISaudi Arabia · السعوديةOpen – deadline not published

Saudi Arabia–Qatar energy MoU – joint ventures to be explored for oil and gas export pipelines, plus clean hydrogen, renewables and storage

Client: Saudi Ministry of Energy / Qatar Ministry of State for Energy Affairs

Pre-qualification / EOIEgypt · مصرOpen – deadline not published

Hyde Park development on 415 feddans of the former Dream Land site – land purchase from Ecrami signed; Hyde Park's largest West Cairo project

Client: Hyde Park Real Estate Development

Pre-qualification / EOISaudi Arabia · السعوديةClosed 18 Oct 2026

GCC Railway Saudi section (~672 km, Al-Khafji to Al-Batha, 4 sections) – concept-to-IFC design consultancy: Systra emerges frontrunner; separate design-review tender due 18 Oct

Client: Saudi Arabia Railways (SAR)

Pre-qualification / EOISaudi Arabia · السعوديةOpen – deadline not published

East-West crude pipeline network expansion to ~10M bpd within 3 years (+3M bpd) – pumping-capacity upgrade, gas-line dual-use conversion; international owners/operators/designers sought

Client: Ministry of Energy / Saudi Aramco

Pre-qualification / EOIPhilippinesUSD 875.64MOpen – deadline not published

Improving Growth Corridors in Mindanao Road Project Phase 2 – 220.6 km roads incl. 6.5 km ocean-crossing viaduct and 1.06 km sea bridge (proposed ADB loan USD 875.64M)

Client: Department of Public Works and Highways (DPWH)

Pre-qualification / EOISyria · سورياOpen – deadline not published

Hassia Technology & Innovation City – 990 ha tech-industrial zone (incl. 100+ ha data centre) and 550 ha residential district for ~200,000 residents – strategic agreement signed

Client: Hassia Industrial City administration / Technology and Innovation City Company

Pre-qualification / EOICzechiaOpen – deadline not published

Brno–Nezamyslice railway modernisation (new double track, up to 200 km/h) – PPP concession tender documents in preparation, start decision due at year-end

Client: Správa železnic / Ministry of Transport of the Czech Republic

Pre-qualification / EOIIndiaOpen – deadline not published

Namma Metro Phase 3 (Orange Line, 44.65 km, 31 stations: JP Nagar 4th Phase–Kempapura & Hosahalli–Kadabagere) – EOI for General Consultant

Client: Bangalore Metro Rail Corporation Ltd (BMRCL)

Pre-qualification / EOIMoldovaOpen – closes 23 Nov 2026 (4 days)

EOI: Construction Supervision of Rehabilitation Works on Corridor 5 – roads G33 and G35

Client: Moldova Rural Connectivity Project / National Road Administration

Pre-qualification / EOIChileUSD 725MOpen – deadline not published

Sierra Gorda copper mine fourth grinding line (48→60 Mt/y, extra crushing & flotation) – USD 725M brownfield expansion, key contracts not yet disclosed

Client: Sierra Gorda SCM (KGHM 55% / South32 45%)

Pre-qualification / EOIThailandOpen – deadline not published

Lower East Chao Phraya Irrigation System Improvement (ADB 57304-001) – 314 km canal upgrades, 11 regulation structures, pumping stations; market sounding roadshow (FIDIC Red Book works)

Client: Royal Irrigation Department (Thailand) – ADB-financed

Pre-qualification / EOINepalUSD 305.75MOpen – deadline not published

SASEC Highway Improvement & Ecosystem Restoration – 4-laning of ~70 km Narayanghat–Hetauda (East–West Hwy) and 8.7 km Mugling–Abukhaireni (Prithvi Hwy), elevated wildlife crossing, bridges – ADB approved

Client: Government of Nepal (ADB SASEC Highway Improvement and Ecosystem Restoration Project)

Open tenderMorocco · المغربMAD 480MOpen – deadline not published

New Mohammed V Airport terminal – three ONDA tenders (~MAD 480M): 47 passenger boarding bridges (2 A380), 60 converters & 61 docking guidance systems (MAD 336M firm tranche + optional 5-yr maintenance); road interchange to RP 3038 (MAD 113.05M, 14 months); works quality control (~MAD 30M)

Client: Office National des Aéroports (ONDA)

Pre-qualification / EOIIraq · العراقUSD 900MOpen – deadline not published

Iraq Transport Economic Corridors (ITREC) – General Procurement Notice: greenfield first 100 km of Expressway 2 Baghdad–Samarra (~USD 726M, output & performance-based contract), 84 km E1-R9B rehabilitation + 5-yr maintenance (~USD 30M), ~72 km Kurdistan roads incl. Girsheen Interchange (~USD 77.65M); prequalification expected for major works

Client: Iraq Transport Economic Corridors Project (ITREC) – Roads & Bridges Directorate, Ministry of Construction, Housing & Public Municipalities

Pre-qualification / EOIKenyaKES 598bn (~USD 4.6bn)Open – deadline not published

National Irrigation Sector Investment Plan (NISIP) 2025–2035 – KES 598bn (~USD 4.6bn) to expand irrigation to 607,000 ha via dams, conveyance, distribution and pumping; 61% from private investors

Client: Ministry of Water, Sanitation and Irrigation (Kenya)

Pre-qualification / EOIUnited KingdomGBP 35MOpen – deadline not published

Fazeley Street, Digbeth – GBP 35M creative/media mixed-use neighbourhood with new homes – Digbeth Loc Studios named Homes England preferred development partner

Client: Homes England

Pre-qualification / EOICanadaCAD 750MOpen – deadline not published

CFB Suffield Chemical and Biological Laboratory and Blast Assessment Centre – new defence research facility (CAD 750M), part of ~CAD 8bn Alberta defence investments

Client: Department of National Defence (Canada)

Pre-qualification / EOISouth AfricaZAR 6.9bnOpen – deadline not published

Port of Saldanha Southern Precinct – 55 ha, 25-year TNPA lease to Freeport Saldanha SEZ for ~R6.9bn investment pipeline (marine/bunkering services, manufacturing, LNG import & storage)

Client: Freeport Saldanha / Transnet National Ports Authority (TNPA)

Contract awardTurkeyTRY 829.8MContract awarded – subcontracting open

Kazımkarabekir–Topağacı–Ümraniye Spor Köyü metro (~5 km, 4 stations) – construction supervision & consultancy, invitation to sign (İKN 2026/451508)

Awarded to Su-Yapı Mühendislik – Proyapı Mühendislik – KMG Proje JV · Client: Altyapı Yatırımları Genel Müdürlüğü (AYGM)

Pre-qualification / EOIUAE · الإماراتAED 200bn+ (pipeline)Open – deadline not published

Abu Dhabi PPP / capital-projects pipeline (~500 projects, AED 200bn+) – ADPIC–PATRIZIA strategic partnership on infrastructure investment & delivery

Client: Abu Dhabi Projects and Infrastructure Centre (ADPIC)

Pre-qualification / EOISaudi Arabia · السعوديةSAR 5.6bnOpen – deadline not published

Khobar Pier – SAR 5.6bn coastal destination (671,000 m² site, 850 m waterfront, 689 homes, 690 hotel rooms, 33,000 m² retail) launched

Client: Ajdan Real Estate Development (with Ashraq Development, Tourism Development Fund, Aljazira Capital)

Pre-qualification / EOIUnited StatesUSD 119.4bn (4 phases; Phase 1 USD 16.8bn)Open – deadline not published

TeraFab AI semiconductor fab campus (SpaceX/Tesla/xAI) – up to USD 119bn over 4 phases, Phase 1 USD 16.8bn (2026–28); contractors not yet selected

Client: TeraFab AI (SpaceX-led, with Tesla and xAI)

Pre-qualification / EOIKenyaKES 65bnOpen – deadline not published

Nairobi commuter rail modernisation & electrification (57 km Nairobi–Thika corridor, KES 65bn) – consultant recruitment launched under KUMIP

Client: Kenya Railways Corporation – Kenya Urban Mobility Improvement Project (World Bank)

Pre-qualification / EOIOman · عُمانOMR 400M+Open – deadline not published

Madana integrated tourism complex – development agreement (over OMR 400M)

Client: Ministry of Heritage and Tourism; Dhofar Tourism Co. (owner/developer)

Contract awardArgentinaUSD 340M (bid); USD 2bn min. capex first 5 yearsContract awarded – subcontracting open

AySA privatisation – 90% stake and 30-year water & sanitation concession won by Rowing-led consortium (USD 340M bid; min. USD 2bn investment in first 5 years)

Awarded to Consortium led by Rowing S.A. with Transclor, Arcos Saneamento e Participações (Grupo Equipav) and PHX Aqua AR B.V. · Client: Government of Argentina (AySA privatisation)

Pre-qualification / EOICongoOpen – deadline not published

CORAF refinery (~21,000 bpd) modernisation & expansion – pre-FEED launched, SOCAR Downstream as PMC for SNPC

Client: Société Nationale des Pétroles du Congo (SNPC) / CORAF

Pre-qualification / EOILaosClosed 23 Oct 2026

EOI – implementation support & works supervision for NR2 West Section 4 (Pak Beng–Muang Ngeun) OPBRC rehabilitation and Khua–Samphan local road (FS-001-AF) (World Bank)

Client: Southeast Asia Regional Economic Corridor and Connectivity Project – Ministry of Public Works and Transport

Pre-qualification / EOIHong KongOpen – deadline not published

Hong Kong–Shenzhen Western Rail Link (18 km, Deep Bay tunnel) – design & construction tendering 2027; Northern Link Main Line + branch – TBM works from 2028

Client: Hong Kong SAR Government (railway development plan)

Pre-qualification / EOISyria · سورياUSD 1.16bnClosed 10 Nov 2026

Halabiyeh-Zalabiyeh dam on the Euphrates – 81 MW hydropower + up to 1,200 MW pumped storage: call for expressions of interest (BOOT/BOT/PPP/EPC)

Client: Ministry of Energy, Syria

Pre-qualification / EOIMexicoUSD 450M (approx.)Open – deadline not published

New Atlas / Leones Negros stadium – up to 40,000 seats with retractable stands on 16 ha, designed by Populous (construction 2027–2030)

Client: Grupo PRODI (80%) and Universidad de Guadalajara (20%)

Pre-qualification / EOISenegalCFAF 921bn (~USD 1.5bn)Open – deadline not published

National long-term flood-control programme – CFAF 921bn (~USD 1.5bn) announced by the Prime Minister

Client: Government of Senegal

Contract awardUnited KingdomContract awarded – subcontracting open

Pagabo/YPO developer-led regeneration framework 2026–2030 – 7 lots (SPV schemes >/<GBP 100M, development agreements >/<GBP 50M, consultancy, legal, management), 52 firms appointed

Awarded to 52 firms incl. Willmott Dixon/Be Living, Hochtief PPP Solutions, Hill, Higgins, Stepnell, Wates Residential, Urban Splash, igloo, Mount Anvil · Client: YPO / Pagabo

Contract awardSaudi Arabia · السعوديةContract awarded – subcontracting open

Diriyah natural stone project management consultancy (SPMC) – third 3-year contract

Awarded to Versatile International · Client: Diriyah Company

Contract awardUAE · الإماراتContract awarded – subcontracting open

Aljada Central Business District Phase 2 – preconstruction services then construction mobilisation

Awarded to Roberts Co · Client: Arada

Pre-qualification / EOIEcuadorClosed 20 Oct 2026

E59 Cuenca–Girón–Pasaje corridor – supervision of road rehabilitation & critical-site works, EOI EC-MTOP-574260-CS-QCBS (World Bank)

Client: Ecuador Emergency Resilient Reconstruction Project (P181079) – Ministerio de Infraestructura y Tecnología (MIT)

Pre-qualification / EOINigerClosed 15 Oct 2026

Supervision of Kori Agzermaderan flood-channel treatment works (3 lots), Agadez – consultant EOI NE-PIDUREM-544926-CS-CQS

Client: Niger Integrated Urban Development and Multi-sectoral Resilience Project (PIDUREM)

Pre-qualification / EOIOman · عُمانOMR 700MOpen – deadline not published

Al Bandar integrated tourism complex (~1.3M m²: villas, apartments, luxury hotels, retail, schools, infrastructure) – OMR 700M development agreement

Client: Ministry of Heritage and Tourism / Al Bandar Development Company

Pre-qualification / EOISyria · سورياOpen – deadline not published

Damascus Heights and Latakia Yachts & Marina – framework agreement for planning, development and construction

Client: Ministry of Public Works and Housing (Syria) / Eagle Hills

Pre-qualification / EOILaosUSD 55.4MOpen – deadline not published

Xiengman–Luang Prabang Mekong bridge (820 m, 120 m main span) + 14 km approach road – design approved, financing under negotiation

Client: Governments of Laos and Thailand

Pre-qualification / EOISaudi Arabia · السعوديةOpen – deadline not published

Jeddah Economic City masterplan (5.3M m², 14M m² GFA) – phase 1 plot developer talks begin; 1 km tower at 116th floor, completion 2028

Client: Jeddah Economic Company (JEC)

Open tenderUAE · الإماراتOpen – deadline not published

Tasreef programme – project management consultancy (PMC) tender for four stormwater projects

Client: Dubai Municipality

Contract awardSaudi Arabia · السعوديةContract awarded – subcontracting open

Marjan offshore field development – engineering & project execution services for processing facilities, gas compression and power infrastructure upgrades

Awarded to KBR · Client: Saudi Aramco

Pre-qualification / EOIVietnamUSD 35.55bn (PPP pipeline)Open – deadline not published

National expressway programme 2026–2030 – 29 priority PPP projects (USD 35.55bn) incl. Hanoi Ring Road 5, HCMC Ring Road 3 widening, Eastern North–South expressway 6-lane PPPs

Client: Ministry of Construction, Vietnam

Pre-qualification / EOINigeriaUSD 10bn (reported initial investment)Open – deadline not published

Olokola LNG (OKLNG) export terminal revived – 1,728 ha site with up to three loading jetties, linked to DP World deep-sea port plans

Client: NNPC Ltd / Ogun State Government

Pre-qualification / EOICameroonUSD 525MOpen – deadline not published

Douala–Bangui corridor Phase 1 – Yaoundé–Edéa (165 km) and Baoro–Bossemptélé (~79 km, CAR) road works plus feeder roads, USD 525M World Bank financing authorised

Client: Governments of Cameroon and Central African Republic (World Bank regional transport programme)

Pre-qualification / EOIUAE · الإماراتAED 25bn (USD 6.8bn)Open – deadline not published

Saadiyat Shores master-planned community (1.87M m², AED 25bn) – construction start targeted Q1 2027, three phases to 2034

Client: Palm Hills Developments

Pre-qualification / EOILiberiaOpen – deadline not published

Buchanan offshore oil & gas logistics shorebase – NOCAL–LADOL agreement, 6-month feasibility study (marine access, land, utilities, ESIA) before definitive agreements

Client: National Oil Company of Liberia (NOCAL)

Pre-qualification / EOIIndiaINR 22,000 croreOpen – deadline not published

Gohpur–Numaligarh 33.7 km corridor with 15.79 km twin-tube underwater road-cum-rail tunnel under Brahmaputra – construction to start by Dec 2026

Client: Ministry of Road Transport and Highways (MoRTH)

Pre-qualification / EOIRwandaOpen – deadline not published

University of Rwanda ~150-room three- to five-star hotel in Huye – planned development

Client: University of Rwanda

Pre-qualification / EOIEquatorial GuineaOpen – closes 23 Nov 2026 (4 days)

PARCH 1 – consultancy for control and supervision of construction & renovation works (AMI, AfDB)

Client: PARCH 1 Project Management Unit (Projet de Renforcement du Capital Humain, Phase 1)

Pre-qualification / EOISouth AfricaOpen – deadline not published

Foreshore Precinct Project – completion of unfinished freeway bridges, new Buitengracht link-bridge, ramps, canal, outbound tunnel & 15 ha mixed-use development

Client: City of Cape Town

Pre-qualification / EOIUAE · الإماراتOpen – deadline not published

New 37 km coastal highway – Al-Hudayriyat Island to E11 at Al-Nouf (planning stage)

Client: Abu Dhabi government

Pre-qualification / EOISaudi Arabia · السعوديةSAR 700MOpen – deadline not published

Masar Destination serviced-apartment tower (~460 hospitality units) – SAR 700M land deal, Numu to develop

Client: Numu (developer) / Umm Al Qura for Development & Construction

Pre-qualification / EOISaudi Arabia · السعوديةOpen – deadline not published

Masar Corner (Masar Destination) – two mixed-use towers, 541 residential/commercial/service units, ~125,000 m² BUA, completion 2029

Client: Alramz Real Estate Company / Ramz Al Hijaz Fund Company

Pre-qualification / EOIMozambiqueClosed 22 Oct 2026

E&S studies, design & construction supervision of agribusiness training and incubation centre in Buzi, Sofala, MZ-MEF-DNT-573464-CS-QCBS (World Bank)

Client: Access to Finance & Economic Opportunities Project (Mais Oportunidades) – Ministry of Economy and Finance, DNT

Pre-qualification / EOIHondurasUSD 70MOpen – deadline not published

IDB USD 70M loan – Tegucigalpa water service improvement (network sectorization, pipe replacement, pumping stations, metering)

Client: Unidad Municipal de Agua Potable y Saneamiento (UMAPS), Alcaldía del Distrito Central

Pre-qualification / EOISpainEUR 1.57BOpen – deadline not published

Madrid 10-year urban rail extension programme – 27.8 km of new metro Lines 1, 10, 11 and Metro Ligero ML3 (studies 2027–29, works 2030–34)

Client: Comunidad de Madrid (regional government)

Pre-qualification / EOICanadaOpen – deadline not published

Pacific Link (West Coast Oil Pipeline) – designated project of national interest, southern route AB–BC; conditions to be finalised by Sept 2027

Client: Trans Mountain Corporation (Canada/Alberta-owned) with Pembina Pipeline

Pre-qualification / EOISouth AfricaZAR 395bnOpen – deadline not published

Infrastructure South Africa Construction Book 3 – 110 projects (transport, energy, water, social, municipal, digital) due for procurement within 12–18 months

Client: Infrastructure South Africa (ISA)

Pre-qualification / EOIKazakhstanOpen – deadline not published

Fourth national oil refinery (up to 10 Mtpa) – site selection by end-2026, foreign investors sought, commissioning 2033

Client: Ministry of Energy of Kazakhstan

Pre-qualification / EOICentral African RepublicOpen – deadline not published

Works supervision for ancillary infrastructure and PDCA programme, Pointe-Noire–Brazzaville–Bangui–N'Djamena corridor phase 1 (CD13), consultant EOI (AfDB)

Client: Government of Central African Republic – Multimodal transport corridor development project phase 1

Pre-qualification / EOIUAE · الإماراتAED 3.5bn (phase 1)Open – deadline not published

Fourth strategic corridor (80 km, 72 bridges, 17 tunnels) – Phase 1, 30 km Al Shanouf Road (Sharjah) to Dubai–Al Ain Road, approved

Client: Dubai Government / Roads and Transport Authority

Contract awardQatar · قطرContract awarded – subcontracting open

Lusail City – programme & construction management services (PMCMCS), 3 years

Awarded to Parsons Corporation · Client: Lusail Real Estate Development Company (Qatari Diar)

Pre-qualification / EOISaudi Arabia · السعوديةUSD 5000MOpen – deadline not published

Project Rise – 2 km megatall tower and surrounding CBD (North Pole masterplan): contractors approached in market sounding (~USD 5bn construction)

Client: Tower District Real Estate Development Co. (PIF)

Contract awardBahrain · البحرينContract awarded – subcontracting open

Amwaj Avenue mixed-use waterfront (125,000 m², serviced residential plots) – design & supervision and QS consultants appointed

Awarded to Sanad Engineering (design & supervision); DG Jones (quantity surveying) · Client: Naseej

Pre-qualification / EOIPakistanUSD 1.1bnOpen – deadline not published

ML-1 Karachi–Rohri (480 km) railway modernisation – ADB USD 1.1bn investment programme being finalised

Client: Pakistan Railways / Asian Development Bank

Pre-qualification / EOIGreeceOpen – deadline not published

Concession of 22 Greek regional airports (cluster, 40–45 yrs) – 3 consortia submit EOIs (AIA; GEK TERNA–GMR; Fraport–Delta)

Client: Superfund (Growthfund / Hellenic Corporation of Assets and Participations)

Pre-qualification / EOIOman · عُمانOpen – deadline not published

Muttrah waterfront mixed-use destination (18.5 ha; residences, promenade, parks, retail) within Port Sultan Qaboos masterplan

Client: Omran Group

Pre-qualification / EOISaudi Arabia · السعوديةOpen – deadline not published

Prince Naif bin Abdulaziz International Airport (Qassim) PPP – six bidders qualified, 30-year concession incl. construction

Client: Matarat Holding / National Center for Privatization & PPP

Pre-qualification / EOINorth MacedoniaOpen – deadline not published

Čebren pumped-storage and Galište hydropower plants – construction start targeted for 2027

Client: Government of North Macedonia

Pre-qualification / EOISerbiaOpen – deadline not published

Niš 500 MW gas-fired power plant – EPS / Srbijagas / SOCAR shareholders' agreement

Client: EPS, Srbijagas & SOCAR joint venture

Pre-qualification / EOIUzbekistanUSD 5bn (pipeline)Open – deadline not published

AIIB–Uzbekistan USD 5bn infrastructure pipeline 2026–2029 incl. electricity transmission modernisation (southern corridor, Fergana)

Client: Government of Uzbekistan / AIIB

Pre-qualification / EOICentral African RepublicOpen – deadline not published

Works supervision (maîtrise d'œuvre) for construction of Gouga border control post – AMI, CD13 corridor (AfDB)

Client: Government of the Central African Republic – AfDB-financed CD13 corridor project

Contract awardOman · عُمانContract awarded – subcontracting open

Al Salam Street upgrade – Industrial Roundabout tunnel interchange (2+2 lanes, future third lane) and second junction: agreement signed with AZ Engineers

Awarded to AZ Engineers and Partners · Client: Muscat Municipality

Pre-qualification / EOIUAE · الإماراتAED 15bnOpen – deadline not published

Seih Sdeirah mixed-use community (up to 1.5M m²) and Yas Island canal-side residential plots (~130,000 m² GFA) – Aldar/Arada AED 15bn partnership

Client: Aldar Properties / Arada

Pre-qualification / EOISouth SudanClosed 16 Oct 2026

Design review, detailed engineering design, tender documents & works supervision for hybrid wastewater management system – consultancy EOI, CRSISP (AfDB)

Client: South Sudan Urban Water Corporation (SSUWC) – Climate Resilience Sanitation and Institutional Support Project

Pre-qualification / EOISerbiaEUR 33.5MOpen – deadline not published

Novi Sad solid waste management project – procurement of goods, works & consultancy to be launched (EBRD)

Client: City of Novi Sad

Pre-qualification / EOIUnited StatesUSD 15bnOpen – deadline not published

Mesabi Metallics DRI/EAF steel mill – 7.5–10 Mtpa (USD 15bn), construction team not yet selected

Client: Mesabi Metallics (Essar Group)

Pre-qualification / EOICanadaOpen – deadline not published

Calgary–Red Deer–Edmonton high-speed rail – RFP to private proponents (launch fall 2026, selection April 2027)

Client: Government of Alberta / Government of Canada

Pre-qualification / EOIVanuatuUSD 18.9MOpen – deadline not published

Greater Port Vila urban resilience – three multipurpose emergency shelters (Agathis, Freshwind, Nambatri) + nature-based coastal protection

Client: Government of Vanuatu / ADB (with Green Climate Fund)

Pre-qualification / EOINigeriaOpen – deadline not published

Modernisation of four eastern ports (Onne, Rivers, Delta, Calabar) approved to diversify cargo from Lagos

Client: Federal Ministry of Marine and Blue Economy / Nigerian Ports Authority

Open tenderSouth AfricaZAR 9.5bnOpen – deadline not published

SANRAL 241 routine road maintenance tenders (132 contractor, 109 consultant) worth ZAR 9.5bn – route-by-route tendering continuing, Nov-30 target to be missed

Client: South African National Roads Agency (SANRAL)

Pre-qualification / EOIOman · عُمانOpen – deadline not published

Three CCGT power plants (2,800–3,000 MW) – technical consultant appointed for concept design, site selection and EPC tender documents

Client: Nama Power and Water Procurement (PWP)

Pre-qualification / EOISaudi Arabia · السعوديةSAR 1.2bn (USD 317M)Open – deadline not published

Masar Destination Zone 2 – two residential towers (534 apartments), SAR 1.2bn

Client: Umm Al Qura for Development & Construction (Masar)

Pre-qualification / EOISaudi Arabia · السعوديةSAR 21bnOpen – deadline not published

King Salman Gate SAR 21bn mixed-use – MRCB exploring

Client: RUA AlHaram AlMakki (PIF)

Pre-qualification / EOIKazakhstanOpen – deadline not published

New Astana airport and expansion of Astana International Airport – framework agreement with Changi Airports International

Client: Astana city administration / Ministry of Transport of Kazakhstan

Pre-qualification / EOIAzerbaijanOpen – deadline not published

Caspian–Black Sea–Europe Green Energy Corridor (Azerbaijan–Georgia subsea power link) – tender & FID preparation expected by end-2026

Client: Government of Azerbaijan (Ministry of Energy) with Georgia partners

Pre-qualification / EOIUgandaUSD 254MOpen – deadline not published

Uganda–South Sudan 400 kV interconnector (299 km) – transmission line & Bibia/Olwiyo/Karuma substations, AfDB-funded (procurement starting)

Client: Uganda Electricity Transmission Company Ltd / Ministry of Energy (Uganda); South Sudan counterpart

Pre-qualification / EOISerbiaUSD 600MOpen – deadline not published

Serbia gas sector programme (Trupale–Pojate & Niš–Velika Plana pipelines, underground storage, network upgrades) – World Bank USD 600M MPA approved

Client: Government of Serbia / World Bank

Contract awardArgentinaUSD 600MContract awarded – subcontracting open

Aeropuertos Argentina 2000 concession extended to 2049 – USD 600M airport investment programme across 35 airports (Ezeiza terminal expansion, runways, aprons)

Awarded to Aeropuertos Argentina 2000 (Corporación América) · Client: Government of Argentina / ORSNA

Pre-qualification / EOIKuwait · الكويتOpen – deadline not published

National Data Center – consultancy for design, RFP/specs and supervision (tender awaiting CAPT approval)

Client: Central Agency for Information Technology (CAIT)

Pre-qualification / EOISaudi Arabia · السعوديةOpen – deadline not published

Umm Al-Qura University Hospital PPP – 73 companies expressed interest

Client: Umm Al-Qura Univ. / NCP

Pre-qualification / EOILebanon · لبنانClosed 08 Oct 2026

Hill lakes – feasibility, ESIA, detailed design & works supervision EOI (World Bank)

Client: Lebanon GATE Project

Pre-qualification / EOISouth AfricaUSD 1.9-2.7BOpen – deadline not published

Transnet Hotazel–Ngqura manganese export corridor – 25-year private partner (rail rehab, new manganese terminal, maintenance) – RFQ stage

Client: Transnet

Pre-qualification / EOIColombiaCOP 1000bnOpen – deadline not published

Chocó post-earthquake reconstruction – 5 road corridors (Darién–Urabá, Tutunendo–Ichó, San José del Palmar–El Cairo, Istmina–Puerto Meluk, Quibdó–Ánimas–Nóvita incl. 2 bridges) + José Celestino Mutis airport airside; studies & designs pending

Client: Ministry of Transport – Invías / Aerocivil

Contract awardKenyaUSD 450MContract awarded – subcontracting open

Dangote 700,000 bpd Lamu refinery – PMC/EPCM consultancy USD 450M

Awarded to Engineers India Ltd · Client: Dangote Group

Pre-qualification / EOIUnited StatesOpen – deadline not published

TerraPower Natrium 345 MW nuclear plant – EPC contract to be rebid (~USD 4bn)

Client: TerraPower

Pre-qualification / EOIIraq · العراقOpen – deadline not published

Nahr Bin Umar field – associated-gas investment plans under review

Client: Iraq Ministry of Oil

Pre-qualification / EOIBangladeshClosed 14 Oct 2026

Chattogram water supply – construction supervision consultancy EOI (World Bank)

Client: Chattogram Water Supply Improvement Project

Pre-qualification / EOISaudi Arabia · السعوديةOpen – deadline not published

Prince Naif bin Abdulaziz Intl Airport PPP – 6 bidders qualified

Client: MATARAT / NCP