2780 live leads · 55 new today · updated 19 Nov 2026Contactمناقصات يومية مجانية
Tender Leads DailyConstruction tenders & awards · every morning

Today

Railway track & systems installation – tenders & subcontract leads

196 live projects that need railway track & systems installation – tenders, pre-qualifications and newly awarded contracts, updated daily.

Get these every morning – free.New Railway track & systems installation leads, straight to your email or WhatsApp.
Register free →
Contract awardUnited StatesUSD 86.3MContract awarded – subcontracting open

CTA Blue Line Forest Park Branch Rebuild Phase 2 – Kedzie–Pulaski track reconstruction (~8,000 ft slow zones incl. Pulaski Crossover), traction power, signals & communications upgrades

Awarded to Kiewit Infrastructure Company · Client: Chicago Transit Authority (CTA)

Contract awardTurkeyTRY 2.69bn + EUR 22.5MContract awarded – subcontracting open

Konya Barış Street tram line Beyhekim–Kentplaza (13.85 km, 18 stations) and traffic control centre – construction tender won by Doğuş İnşaat (World Bank Sustainable Cities Project 2)

Awarded to Doğuş İnşaat · Client: Konya Metropolitan Municipality

Contract awardSaudi Arabia · السعوديةContract awarded – subcontracting open

Phosphate railway (Waad Al-Shamal mines to Ras Al-Khair) – rail contract won by local/Chinese team

Awarded to Local/Chinese team (names not disclosed in public summary) · Client: Saudi Arabia Railways (SAR)

Pre-qualification / EOIUnited StatesUSD 438.9MOpen – deadline not published

Hartsfield-Jackson Atlanta International Airport capital package – runway reconstruction, new SkyTrain vehicles, terminal restroom repairs and curbside management (USD 438.9M approved by City Council)

Client: City of Atlanta – Hartsfield-Jackson Atlanta International Airport

Pre-qualification / EOILaosOpen – deadline not published

Nong Khai–Vientiane Mekong railway bridge and Sixth Thai–Lao Friendship Bridge (Ubon Ratchathani–Salavan) – governments agree to expedite, cost-sharing being finalised

Client: Governments of Laos and Thailand

Contract awardUnited StatesUSD 51.1MContract awarded – subcontracting open

CapMetro Plaza Saltillo station expansion – two 280-ft side platforms, double-tracking Onion–Matamoros Sts, 5th St reconfiguration, crossings & signal upgrades (recommended award, board vote 16 Nov)

Awarded to Jay-Reese Contractors · Client: Capital Metropolitan Transportation Authority (CapMetro)

Open tenderSwedenSEK 150MOpen – closes 14 Dec 2026 (25 days)

Track and switch renewal Moradal–Bensjöbacken (Mittbanan) – re-tendered

Client: Trafikverket

Contract awardSwedenSEK 342MContract awarded – subcontracting open

ERTMS preparation works Fosieby–Lernacken (Östervärn, Lockarp, Svågertorp): two new passing tracks, six switches, signal kiosks, ~180 technical cabinets, ducting and retaining walls

Awarded to A3 Entreprenad · Client: Trafikverket

Pre-qualification / EOIIrelandOpen – deadline not published

Navan railway reinstatement (~34 km, stations Dunshaughlin, Kilmessan, Navan Central, Navan North) – preferred route published, Railway Order application planned 2028

Client: Iarnród Éireann (funded via National Transport Authority)

Pre-qualification / EOIBrazilOpen – deadline not published

Paraíba cargo railway Cabedelo–Campina Grande (possible extension to Patos) reusing idle Transnordestina sections – federal chamamento público expected H1 2027

Client: Ministério dos Transportes / Governo da Paraíba

Contract awardPolandPLN 88MContract awarded – subcontracting open

Euroterminal Sławków TK-2 – 5 ha container transshipment slab, 4 km rail access/shunting tracks, roads, drainage and utilities to NDI / NDI Sopot (PLN 88M)

Awarded to NDI S.A. / NDI SOPOT consortium · Client: Euroterminal Sławków Sp. z o.o. (ARP Group)

Open tenderUnited KingdomGBP 307MOpen – closes 14 Dec 2026 (25 days)

Northern Trains – GBP 307M seven-lot design & construction framework for station, depot and railway infrastructure upgrades (Lot 5 major integrated railway works GBP 152M)

Client: Northern Trains Ltd

Open tenderTurkeyOpen – closes 24 Nov 2026 (5 days)

TCDD 3rd Region – 15-month maintenance & repair of İZBAN electrification systems (catenary, earthing, 6 transformer centres, SCADA, Selçuk solar switchyard) (İKN 2026/2172747)

Client: TCDD 3rd Regional Directorate (İzmir)

Pre-qualification / EOIPeruUSD 89bnOpen – deadline not published

Peru Rail Master Plan (PMDF 2050) – MTC presents 14-project, 5,524 km, USD 89bn rail portfolio to investors (Lima–Ica, Marcona–Andahuaylas, Trujillo–Barranca, Lima–Barranca, Cusco–Chinchero)

Client: Ministerio de Transportes y Comunicaciones (MTC)

Open tenderIndiaINR 1.66BOpen – closes 07 Dec 2026 (18 days)

Ahmedabad Metro – depot and Operations Control Centre near Shela incl. E&M works (24 months)

Client: Gujarat Metro Rail Corporation (GMRC)

Open tenderIndiaOpen – closes 28 Dec 2026 (39 days)

Patna Metro Corridor-1 (Red Line) – ballastless track installation incl. buffer stops (40 months)

Client: Delhi Metro Rail Corporation (DMRC) for Patna Metro Rail Corporation Ltd

Pre-qualification / EOIPolandPLN 347MOpen – deadline not published

PKP Intercity Lublin rolling-stock depot rebuild – 10 bids opened (lowest PLN 258.0M, Adamietz/Future Adventure Construction; budget PLN 347.4M)

Client: PKP Intercity

Pre-qualification / EOIUnited StatesUSD 750M (state grant)Open – deadline not published

The Portal (Caltrain/HSR downtown extension, ~2 mi from 4th & King to Salesforce Transit Center) – USD 750M state TIRCP grant secured

Client: Transbay Joint Powers Authority (TJPA)

Open tenderPakistanOpen – closes 02 Dec 2026 (13 days)

Pakistan Railways – signalling portion Phase-I incl. new link at BQM for additional train under DFC (KMR–MYP), ref 398-W/BQM-MYP/DFC/SIGNAL/26-27 (PPRA TS0000018094E)

Client: Pakistan Railways

Open tenderPolandOpen – closes 15 Dec 2026 (26 days)

Toruń West tram line (3+ km, 3 stops) and new tram depot (40 trams, service hall, traction substation, wash) – construction tender

Client: Miejski Zakład Komunikacji w Toruniu (MZK Toruń)

Contract awardAustraliaContract awarded – subcontracting open

Sydney Metro West Linewide Package – supply of ~72,000 booted sleepers for resilient track systems

Awarded to Vossloh AG · Client: John Holland (Sydney Metro West Linewide contractor)

Open tenderIndiaINR 10.17BOpen – closes 05 Jan 2027 (47 days)

Bengaluru Suburban Rail Corridors C2 & C4 – ETCS Level 2 (hybrid over 5G) signalling and train control system

Client: Bengaluru Integrated Rail Infrastructure Development Enterprise Ltd (Bi-RIDE)

Pre-qualification / EOICanadaOpen – deadline not published

Hazel McCallion LRT downtown Brampton extension (3+ km, Brampton Gateway Terminal–Brampton Innovation District GO) – province commits, geotechnical boreholes underway (tunnelling expected)

Client: Government of Ontario / Metrolinx

Pre-qualification / EOIIndiaINR 4.19bnOpen – deadline not published

Gurugram Metro depot-cum-workshop, Sector 33 – civil, architectural & E&M works (Dilip Buildcon declared L1)

Client: Gurugram Metro Rail Limited (GMRL)

Pre-qualification / EOIUnited KingdomGBP 1000MOpen – closes 01 Mar 2027 (102 days)

Tees Valley GBP 1bn five-year transport programme 2027–2032 – early supplier engagement (roads, rail stations, bus, possible FAC-1 alliance)

Client: Tees Valley Combined Authority

Pre-qualification / EOIBulgariaEUR 282MOpen – deadline not published

Sofia urban transport modernisation – EUR 282M EU grant contract signed (Metro Line 3 extension through Slatina, Obelya metro station & depot tunnel, 75 trolleybuses, 50 e-buses with chargers, Ring Road link)

Client: Sofia Municipality

Open tenderGeorgiaOpen – closes 15 Jan 2027 (57 days)

Design & build of ~17.7 km railway and related infrastructure connecting to Anaklia Deep-Sea Port (stations, track, OCS), RFP GE-GR-581481-CW-RFP, 30 months (World Bank)

Client: Anaklia Regional Gateway and Overland Connectivity Project (JSC Georgian Railway)

Contract awardMorocco · المغربEUR 29MContract awarded – subcontracting open

Kenitra–Marrakesh high-speed line – track, catenary and civil works between Casablanca Roches-Noires station and Nouaceur Technicentre

Awarded to Colas Rail · Client: ONCF (Office National des Chemins de Fer)

Pre-qualification / EOIArgentinaUSD 1,350MOpen – deadline not published

Subte Line F (Barracas–Palermo, 12 underground stations) international tender – technical bids under evaluation: Roggio/Ghella vs Supercemento/Eleprint/Panedile with CITIC & Ranken Railway; award early 2027

Client: Gobierno de la Ciudad de Buenos Aires

Contract awardUnited StatesUSD 112MContract awarded – subcontracting open

Chicago Union Station platform leveling – conversion of former mail platforms 30–38 to ADA level-boarding passenger platforms plus climate-controlled waiting area (design-bid-build, 30 months)

Awarded to Clark Construction (GC); WSP USA (designer of record); HNTB (PM/CM) · Client: Amtrak (FRA grant, City of Chicago, Cook County)

Contract awardUnited StatesUSD 51.5MContract awarded – subcontracting open

Metrolink SCORE – Marengo and Rancho Cucamonga siding extension projects (construction Jan 2027–Jul 2028)

Awarded to Granite Construction · Client: Southern California Regional Rail Authority (Metrolink)

Pre-qualification / EOISyria · سورياOpen – deadline not published

Syria–Jordan corridor projects – regional rail link (Syria, Jordan, Saudi Arabia, Türkiye) studies and cost estimates agreed; international highway rehabilitation and Nassib–Jaber crossing upgrade discussed

Client: Governments of Syria and Jordan (Higher Coordination Council)

Pre-qualification / EOIUAE · الإماراتAED 2bnOpen – deadline not published

Dubai Metro Route 2020 extension to Al Maktoum International Airport City – 3 km, 2 stations, AED 2bn, approved by Dubai Executive Council (service 2031)

Client: Roads and Transport Authority (RTA) / Dubai Engineering Projects Establishment

Pre-qualification / EOIUgandaOpen – deadline not published

Uganda Railways Corporation – 10 diesel-electric locomotives (bids from Sung Shin, CRRC Qishuyan, Dalian Lambo, CSI) + 100 steel-coil flat wagons (AfDB-funded)

Client: Uganda Railways Corporation (URC)

Pre-qualification / EOIEthiopiaUSD 15MOpen – deadline not published

Ethio-Djibouti Railway – USD 15M China-Aid grant for electric loco spare parts, track components, station accessories and maintenance machinery

Client: Ethio-Djibouti Railway / Ministry of Finance of Ethiopia

Contract awardItalyContract awarded – subcontracting open

RFI Gorizia 'Lunetta' – new single-track electrified spur linking Trieste line to Nova Gorica, line upgrades and SDAG logistics connection – works handed over

Client: Rete Ferroviaria Italiana (RFI)

Open tenderSwedenSEK 80MOpen – closes 15 Jan 2027 (57 days)

Mälarbanan railway technical design services – 2 packages: track & switch renewal, AT contact-line conversion, M95 interlockings at 10 sites (Kallhäll–Tortuna); Västerås switches & interlockings

Client: Trafikverket

Open tenderMexicoOpen – deadline not published

ATTRAPI international tender – supply of 52 passenger trains (27 long-distance, 25 short-distance) for CDMX–Guadalajara and CDMX–Nuevo Laredo, incl. commissioning, maintenance and workshop equipment to 2034; first clarification meeting 12 Nov 2026, award planned 8 Jan 2027

Client: Agencia de Trenes y Transporte Público Integrado (ATTRAPI)

Contract awardCzechiaCZK 142.3MContract awarded – subcontracting open

Doudleby nad Orlicí station signalling repair and level crossings P4037/P4038 reconstruction, Týniště nad Orlicí–Letohrad line (single bid)

Awarded to AŽD Praha · Client: Správa železnic

Open tenderBrazilOpen – closes 17 Dec 2026 (28 days)

Corredor Ferroviário Minas-Rio concession (~733 km: Lot 1 Iguatema–Barra Mansa + Varginha–Lavras branch; Lot 2 Barra Mansa–Angra dos Reis) – auction 17 Dec 2026; winner to deliver recapacitation & modernisation plan within 2 years

Client: ANTT – Agência Nacional de Transportes Terrestres

Pre-qualification / EOIColombiaOpen – deadline not published

Bogotá Metro Line 2 – 15.5 km automated line, 11 stations (10 underground), 25 trains: three consortia prequalified in second tender (Mota-Engil/Spie Batignolles; Xi'an Rail Transportation Group; Sacyr/CAF), bids now requested

Client: Empresa Metro de Bogotá (EMB)

Pre-qualification / EOITurkeyTRY ~14bn (EIA cost estimates)Open – deadline not published

Erzincan–Erzurum–Kars high-speed railway (13 tunnels, 18 viaducts, 5 stations) – EIA approved, construction tender targeted for 2027

Client: Ministry of Transport & Infrastructure / TCDD

Pre-qualification / EOIDemocratic Republic of CongoUSD 125M (logistics programme)Open – deadline not published

ONATRA Matadi–Kenge rail freight corridor – rehabilitation of ~38 km line (rail replacement, bridge repairs, new structures) plus container terminals at Matadi port and Kenge dry port

Client: ONATRA (Office National des Transports)

Open tenderMexicoOpen – closes 06 Jan 2027 (48 days)

ATTRAPI LO-09-JZO-009JZO001-I-85-2026 – design & construction of Tramo IV subtramo San Luis Potosí Industrial Centro–Tangamanga, Querétaro–Saltillo passenger train: 32.7 km (km 194+500–227+243) with viaducts, stations, bridges, rail under/overpasses, footbridges; 973 days

Client: Agencia de Trenes y Transporte Público Integrado (ATTRAPI)

Open tenderIndiaINR 2.64bn (~USD 30M)Open – deadline not published

South Central Railway EPC tender – 2x25 kV auto-transformer traction system (OHE, PSI, civil & electrical works) Manoharabad–Sircilla

Client: South Central Railway (Hyderabad Division)

Pre-qualification / EOIMozambiqueUSD 7.5bn (programme)Open – deadline not published

Mozambique logistics corridors investment plan (~USD 7.5bn) – Maputo port & EN4, Beira corridor incl. Dondo dry port and Machipanda border, Nacala corridor

Client: Government of Mozambique

Contract awardAlgeria · الجزائر~USD 1bnContract awarded – subcontracting open

Eastern mining railway (Annaba–Djebel Onk line and Bled El-Hadba branch) – signalling, telecoms and electrification contracts (~USD 1bn)

Client: Algerian rail authorities (Anesrif)

Pre-qualification / EOIAustraliaAUD 621M (immediate works; AUD 6.8B plan)Open – deadline not published

South Coast Rail Plan – immediate resilience works (Stanwell Park bridge repairs, Scarborough culverts, Kiama track & turnout renewals, power & signalling upgrades)

Client: Transport for NSW

Pre-qualification / EOITanzaniaUSD 1.2bn (of USD 2.3bn package)Open – deadline not published

SGR Lot 6 Tabora–Kigoma – 411 km electrified mainline (506 km incl. loops/sidings) – USD 1.2bn commercial facility signed (Deutsche Bank / Société Générale syndicate, AfDB guarantee)

Client: Tanzania Railways Corporation (TRC) / Government of Tanzania

Pre-qualification / EOIUnited StatesUSD 1.7bnOpen – deadline not published

Front Range Passenger Rail 'Colorado Connector' (Fort Collins–Denver–Colorado Springs–Pueblo) – Ballot Issue 7A 0.333% sales tax (~USD 295M/yr, USD 580M debt) passing; starter segment USD 333M (2029), Pueblo extension ~USD 1.7bn

Client: Front Range Passenger Rail District

Open tenderUnited StatesOpen – closes 22 Dec 2026 (33 days)

KC Streetcar – RFP for operation & maintenance of the entire 6.5-mile system (downtown starter line, Main Street and Riverfront extensions), new contract from May 2028

Client: Kansas City Streetcar Authority (KC Streetcar)

Open tenderArgentinaOpen – closes 21 Dec 2026 (32 days)

Belgrano Cargas privatisation – 50-year concessions of Belgrano, San Martín and Urquiza freight lines (7,594 km), procedure 504/2-0004-LPU26; bid deadline moved to 21 Dec 2026

Client: Government of Argentina (Ministry of Economy) / Belgrano Cargas y Logística

Pre-qualification / EOIBahrain · البحرينOpen – deadline not published

GCC Railway (2,117 km) – General Railway Agreement among six GCC states, network targeted for operation by Dec 2030

Client: GCC transport ministries (Bahrain MTT host)

Pre-qualification / EOITanzaniaOpen – deadline not published

TRC seeks PPP investors for two ~1,000 km SGR freight corridors (Tanga–Arusha–Musoma; Mtwara–Mbamba Bay) and finalising rolling-stock tenders (34 e-locos, 10 hybrid shunters, 1,000 wagons, 60 coaches, 5 EMUs)

Client: Tanzania Railways Corporation (TRC) / Ministry of Transport

Contract awardAustraliaContract awarded – subcontracting open

Melbourne Airport Rail Link Stage 1 – Sunshine station rebuild & West Footscray–Albion junction works: preferred bidder named

Awarded to Network Integration Program Alliance (CPB Contractors & SMEC) · Client: Victorian Infrastructure Delivery Authority (VIDA)

Open tenderTurkeyOpen – closes 30 Nov 2026 (11 days)

Eskişehir–Kütahya–Balıkesir line electrification systems maintenance and fault repair, 36 months 2027–2029 (IKN 2026/2115191)

Client: TCDD 7th Regional Directorate (Afyonkarahisar)

Pre-qualification / EOITurkeyEUR 220MOpen – deadline not published

Diyarbakır light rail system (14 km, 20 stops, Dağkapı–Diclekent) – financing via İller Bankası being finalised, tender expected early 2027

Client: Diyarbakır Metropolitan Municipality

Open tenderSerbiaOpen – closes 14 Dec 2026 (25 days)

Design & build of 1.4 km Bogojevo rail connection line between Subotica–Bogojevo and Novi Sad–Odžaci–Bogojevo lines + reconstruction of Bogojevo station (tracks, signalling, telecom, power), RFP SER-SRSM-RFP-W-26-88, 540 days (World Bank/AFD)

Client: Serbia Railway Sector Modernization Project – Ministry of Construction, Transport and Infrastructure (MoCTI)

Pre-qualification / EOIIndiaINR 313.88 croreOpen – deadline not published

Lucknow Metro Phase-1B East-West Corridor – power supply & traction infrastructure (810 days), Sterling and Wilson emerges L1

Client: Uttar Pradesh Metro Rail Corporation (UPMRC)

Contract awardIndiaINR 110bnContract awarded – subcontracting open

JK Lakshmi Cement 'Project Kamakshi' – 2.5 MTPA integrated cement plant with 1 MTPA clinker unit and railway sidings, foundation stone laid (completion FY2029)

Client: JK Lakshmi Cement Ltd

Contract awardIndiaINR 1.98bnContract awarded – subcontracting open

Dahod–Indore and Chota Udaipur–Dhar new BG lines – earthwork & blanketing for embankment/cutting (Dhar–Amjhera, Tirla–Maphatpura) subcontract

Awarded to Konndor Industries Limited · Client: Sannverse Railtech Pvt Ltd (for GKC Projects / Western Railway)

Pre-qualification / EOIIndiaINR 138.56bnOpen – deadline not published

Mumbai Metro Line 12A (Manpada-Katai Naka–Taloja, 18.4 km elevated, 12 stations) with integrated 4/6-lane flyovers – cabinet approval

Client: Mumbai Metropolitan Region Development Authority (MMRDA)

Pre-qualification / EOIUnited KingdomGBP 303MOpen – deadline not published

Leeds Existing Station Programme (LESP) – GBP 303M station enhancement: central overbridge, 3 new entrances, concourse upgrades, Platform 14 extension; GBP 200M core construction funding confirmed

Client: UK Department for Transport / Leeds Existing Station Programme

Contract awardIndiaINR 2.4bnContract awarded – subcontracting open

Kathuatia–Hazaribagh Town railway doubling (29.5 km, Koderma–Arigada line) – EPC incl. earthwork, bridges, ROB/RUB, track, stations

Awarded to ARSS SCPL JV (ARSS Infrastructure Projects) · Client: East Central Railway (Dhanbad Division)

Contract awardSwedenContract awarded – subcontracting open

Vänersborg central station rebuild – new track, OCS, switches, signal interlocking, longer/wider platforms, new island platform and footbridge widening (works 2027–2028)

Awarded to Infrakraft Sverige AB · Client: Trafikverket

Open tenderChinaOpen – deadline not published

Xinshuo & Xinzhun Railways – modernisation of railway subgrade and related facilities for safety improvement

Client: Guoneng Xinshuo Railway Corporation Ltd (CHN Energy)

Pre-qualification / EOIAlgeria · الجزائرUSD 14.6bnOpen – deadline not published

Algiers–Tamanrasset railway – 924 km of works about to launch (Laghouat–Ghardaïa 265 km, Ghardaïa–El Ménéa 230 km, Tamanrasset–Moulay Lahcen 213 km); DZD 1,910bn (~USD 14.6bn) budgeted, AfDB financing

Client: Ministry of Public Works and Basic Infrastructure (Algeria)

Pre-qualification / EOIMexicoOpen – deadline not published

Querétaro–Saltillo passenger train, San Miguel de Allende–Villa de Reyes section – bids up to USD 1.6bn received, award postponed to 20 Nov

Client: Agencia de Trenes y Transporte Público Integrado (ATTRAPI)

Contract awardBangladeshINR 50–100bn (combined)Contract awarded – subcontracting open

Dhaka MRT Line-1 (underground, ~31 km, 19 stations) – CP09 track & electrical systems (with Sumitomo) and CP10 signalling, telecom & PSDs

Awarded to Larsen & Toubro (CP09 with Sumitomo Corporation) · Client: n/d (Dhaka MRT Line-1 project, JICA-funded)

Contract awardUnited StatesUSD 2.43BContract awarded – subcontracting open

East San Fernando Valley light rail (Van Nuys Blvd) – USD 2.43B project enters major construction

Awarded to Skanska–Stacy Witbeck JV · Client: LA Metro

Pre-qualification / EOIAngolaOpen – deadline not published

Zambia Lobito Railway – Angolan section, preferred EPC contractors selected

Client: Africa Finance Corporation (AFC) / Zambia Lobito Railway S.A.

Pre-qualification / EOIZambiaOpen – deadline not published

Zambia Lobito Railway Lot 1B (~517 km Angola border–Chingola) – preferred EPC bidder selected

Client: Africa Finance Corporation (AFC) / Zambia Lobito Railway Ltd

Open tenderSpainEUR 2.3MOpen – deadline not published

Adif – electrification and track works for new Astigarraga station

Client: Adif

Contract awardPolandContract awarded – subcontracting open

Siemens Mobility Rail Service Centre at Gądki – depot construction

Awarded to Budimex · Client: Siemens Mobility

Contract awardUruguayUSD 1.8MContract awarded – subcontracting open

Río Negro rail bridge (750 m) rehabilitation at Paso de los Toros plus track renewals – separated from Ferrocarril Central modernisation

Client: Corporación Ferroviaria del Uruguay (CFU)

Contract awardChileContract awarded – subcontracting open

Santiago–Melipilla & Batuco rail services – 5G-ready private 4G network on 87 km plus RTP-800 radios for 32 trains (ETCS Level 2, PIS, PA, CCTV)

Awarded to Teltronic (selected by Siemens Mobility) · Client: EFE (Empresa de los Ferrocarriles del Estado) / Siemens Mobility

Open tenderIndiaOpen – deadline not published

Development and construction of depot incl. Operations Control Centre (OCC) for Ahmedabad Metro

Client: Gujarat Metro Rail Corporation (GMRC) Ltd

Contract awardAustraliaContract awarded – subcontracting open

Level crossing removals at Anderson Street (Yarraville) and Hudsons Road (Spotswood) with two pedestrian/cyclist underpasses – Werribee line

Awarded to Alliance of Acciona, WSP, Metro Trains Melbourne and VIDA Rail · Client: Level Crossing Removal Project (Victoria)

Contract awardTanzaniaTZS 3.67tnContract awarded – subcontracting open

SGR Lots 3 & 4 Makutupora–Tabora–Isaka (424 km, 5 sections) – TZS 3.67tn (~USD 1.4bn) financing secured, works under way

Client: Tanzania Railways Corporation (TRC)

Contract awardUgandaEUR 2.7bnContract awarded – subcontracting open

Malaba–Kampala SGR (EUR 2.7bn) – Yapi Merkezi works under LNTP; IsDB EUR 650.75M ring-fenced for 2.12 km Kampala tunnel & 553 m Jinja Nile bridge, OPEC Fund/AfDB/KfW financing pending

Awarded to Yapi Merkezi · Client: Government of Uganda – Ministry of Works and Transport (SGR Project)

Contract awardIndiaINR 921.63 crore (~USD 110M)Contract awarded – subcontracting open

Jaipur Metro Phase 2 – underground tunnel and stations, Prahladpura–Todi Mod corridor

Awarded to CEM India Projects Ltd · Client: Rajasthan Metro Rail Corporation Ltd (RMRCL)

Contract awardTurkeyTRY 3.39bnContract awarded – subcontracting open

Şanlıurfa light rail line Phase 1 (~14 km, 15 stations) construction – awarded to Sigma İnşaat–Emre Ray Enerji–Vestan İnşaat JV, KİK 2026/1327584 (TRY 3.39bn)

Awarded to Sigma İnşaat – Emre Ray Enerji – Vestan İnşaat JV · Client: Şanlıurfa Metropolitan Municipality

Pre-qualification / EOIRomaniaRON 285.8MOpen – deadline not published

Ploiești Triaj–Valea Călugărească rail line rehabilitation (Ploiești–Focșani line, Stage I), 17.3 km

Client: CFR SA

Pre-qualification / EOIUnited StatesUSD 311MOpen – deadline not published

Port MacKenzie rail extension – 32-mile line to ARRC main line at Houston incl. signals & terminal facilities; FRA CRISI grant USD 249M (total USD 311M)

Client: Alaska Railroad Corporation / Matanuska-Susitna Borough

Contract awardUnited StatesUSD 1.9BContract awarded – subcontracting open

NYCT Fulton & Liberty lines (A/C) CBTC re-signalling – 43 track miles, 23 stations, switch & track replacement, works start Nov 2026 (USD 1.9B)

Awarded to L.K. Comstock & RailWorks (Siemens Trainguard MT CBTC) · Client: MTA New York City Transit

Pre-qualification / EOINigeriaUSD 1.4bn (overall project)Open – deadline not published

Lagos Blue Line – FESTAC, Alakija and Trade Fair stations to open by Feb 2027; phase 2 (~14 km Mile 2–Okokomaiko) and Marina/Mile 2 interchanges ahead (USD ~1.4bn project)

Client: Lagos Metropolitan Area Transport Authority (LAMATA) / Lagos State Government

Contract awardChinaCNY 420MContract awarded – subcontracting open

Erenhot Zhongyuan Land Port railway dedicated line & intermodal hub – construction started (CNY 420M)

Client: Zhongyuan Land Port project owner, Erenhot Port (not named in source)

Pre-qualification / EOIMozambiqueOpen – deadline not published

CFM public tenders to contract private operators for sections of the national railway network (sections and timetable not yet announced)

Client: Portos e Caminhos de Ferro de Moçambique (CFM)

Open tenderPolandOpen – deadline not published

Sosnowiec tram ring closure – new ~3.5 km tram track on ul. 11 Listopada incl. overhead line, new traction substation, street rebuild, roundabout and utilities

Client: Tramwaje Śląskie S.A.

Open tenderTurkeyOpen – closes 22 Dec 2026 (33 days)

ETMIC (Eastern Turkey Middle Corridor) – design & build rehabilitation of infrastructure, superstructure and electrification, Divriği–Kars line, 3 lots / 587 km (WB & AIIB financed)

Client: Ministry of Transport – Directorate General of Infrastructure Investments (AYGM)

Open tenderSpainEUR 3.0MOpen – closes 24 Nov 2026 (5 days)

ADIF exp. 3.26/06110.0206 – design & build: electrification of switch 1-3 and feeder adaptation around Sant Vicenç de Calders station (BOE-B-2026-34447) (EUR 3.0M)

Client: ADIF – Administrador de Infraestructuras Ferroviarias

Open tenderTurkeyOpen – closes 22 Dec 2026 (33 days)

Eastern Türkiye Middle Corridor Railway Development – design & build, 3 lots (OP00476726)

Client: Eastern Türkiye Middle Corridor Railway Development Project (World Bank-financed)

Pre-qualification / EOICanadaCAD 254MOpen – deadline not published

Saint John Trade Corridor – 103 km NBSR track upgrade (CWR), Bayshore shoreline stabilisation, Simms Corner grade separation, port dredging & warehouses (up to CAD 254M federal)

Client: Transport Canada / Port Saint John / New Brunswick Southern Railway / NB DTI

Contract awardTurkeyTRY 15.97bnContract awarded – subcontracting open

Konya 19.4 km ring tram line – construction & electromechanical systems supply, installation and commissioning to Uğursal Elektrik–YZH JV (TRY 15.97bn)

Awarded to Uğursal Elektrik – YZH Taahhüt JV · Client: AYGM (Ministry of Transport and Infrastructure)

Contract awardUnited StatesUSD 190.5MContract awarded – subcontracting open

SMART Healdsburg rail extension – ~5 mi track restoration with concrete ties, train control/signals, steel truss bridge over Russian River & girder bridge over Old Redwood Hwy (USD 190.5M)

Awarded to Stacy and Witbeck / Herzog JV · Client: Sonoma-Marin Area Rail Transit (SMART)

Pre-qualification / EOIKenyaKES 651bnOpen – deadline not published

Naivasha–Kisumu–Malaba SGR phases 2B/2C (369 km) – Treasury cost estimate raised to KES 651bn; ~KES 619bn external financing sought

Client: Government of Kenya – National Treasury / Kenya Railways

Open tenderAustraliaOpen – deadline not published

Rail revitalisation works – Inner Midland Work Package (Western Australia)

Client: Public Transport Authority of Western Australia

Open tenderIndiaINR 297.45 croreOpen – deadline not published

Kolkata Metro Purple Line – power distribution, traction substations and 750 V DC third-rail system

Client: Rail Vikas Nigam Ltd (RVNL)

Open tenderVietnamOpen – deadline not published

Construction works for Hao Son and Dai Lanh railway stations

Client: Vietnam National Railway Group

Open tenderRomaniaRON 4.09bnOpen – closes 23 Nov 2026 (4 days)

CFR track superstructure renewal – 7 regional lots, framework agreements (SEAP CN1097452)

Client: CFR SA

Pre-qualification / EOIAustraliaAUD 12bn (programme)Open – deadline not published

NSW Future Fleet train manufacturing, assembly & testing facility – Teralba named preferred site; EOI for train design & build open (AUD 12bn programme)

Client: NSW Government (Transport for NSW)

Pre-qualification / EOIUnited StatesUSD 218MOpen – deadline not published

Hiawatha West passenger rail extension (Milwaukee to Waukesha, Jefferson & Dane counties) – FRA CRISI FY2025-26 grant to WisDOT, largest of 105 awards totalling USD 2.3bn (USD 218M)

Client: Wisconsin Department of Transportation (WisDOT) / Federal Railroad Administration

Pre-qualification / EOINigeriaOpen – deadline not published

Lagos airport monorail – 5-station link from Ikeja Red Line station to new MMIA Terminal 1, design approved by Aviation Ministry & FAAN

Client: Federal Ministry of Aviation and Aerospace Development / FAAN

Contract awardIrelandEUR 140MContract awarded – subcontracting open

Operation & maintenance of 19 track-maintenance machines (tamping, ballast cleaning/regulating), 8+2 years – Irish Rail awards Rhomberg Sersa (EUR 140M+)

Awarded to Rhomberg Sersa Rail Group Ireland · Client: Iarnród Éireann (Irish Rail)

Pre-qualification / EOIUnited StatesUSD 205M (federal grant)Closed 28 Oct 2026

Coos Bay Rail Line (111 mi) / Pacific Coast Intermodal Port – USDOT grant of ~USD 205M secured; contractor proposals for permitting & environmental review due 28 Oct

Client: Oregon International Port of Coos Bay (Pacific Coast Intermodal Port project)

Open tenderPolandPLN 246M (lowest bid, ZUE, gross)Open – deadline not published

Modernisation of railway line 169 Orzesze Jaśkowice–Tychy section and line 140 works (13 bids opened)

Client: PKP Polskie Linie Kolejowe (PKP PLK)

Pre-qualification / EOIArgentinaOpen – deadline not published

Línea San Martín Retiro–Palermo: track, switches and signalling renewal plus Palermo station reform (2 bids, technical envelopes opened)

Client: Trenes Argentinos Infraestructura (ADIF)

Open tenderSouth KoreaOpen – deadline not published

Construction works for Gangdong–Hanam–Namyangju metropolitan railway section

Client: Public Procurement Service (PPS), Korea

Pre-qualification / EOIPhilippinesPHP 81.6bnOpen – deadline not published

Mindanao Railway Phase 1 (Tagum–Davao–Digos, 100.2 km, 8 stations, PHP 81.6bn) – government seeking G2G and multilateral financing partners after China withdrawal

Client: Department of Transportation (DOTr), Philippines

Open tenderAlgeria · الجزائرOpen – deadline not published

El-Menea–In Salah–Tamanrasset railway corridor – 341 km southern section railway works tender

Client: Algerian government (rail agency not named in public teaser)

Pre-qualification / EOICzechiaCZK 3.635bn (estimate)Open – deadline not published

Kladno–Kralupy nad Vltavou line electrification with ETCS L2 – slimmed project approved (CZK 3.635bn, construction 2029–2031)

Client: Správa železnic (SŽ)

Open tenderRomaniaRON 4.09bn excl. VAT (~EUR 770M)Open – closes 23 Nov 2026 (4 days)

CFR SA – track superstructure maintenance by sequential component replacement, 4-year framework, 7 regional lots (e-licitatie 100213163)

Client: CNCF CFR SA

Pre-qualification / EOIItalyEUR 155MOpen – closes 15 Dec 2026 (26 days)

Turin–Lyon high-speed line: Susa international station design and build (about 553 m of track, systems, 5-year maintenance)

Client: Telt

Pre-qualification / EOIGhanaEUR 20MOpen – deadline not published

Tema–Mpakadan railway (97 km) – GRDA freight deal with ISS; EUR 20M EU-funded signalling upgrade planned

Client: Ghana Railway Development Authority (GRDA)

Open tenderGermanyOpen – closes 02 Dec 2026 (13 days)

DB InfraGO – Guben station new electronic interlocking (ESTW): cable civils, signalling & yard lighting (Lot 1) and track/switch renewal (Lot 2)

Client: DB InfraGO AG

Pre-qualification / EOIEthiopiaOpen – deadline not published

Awash–Kombolcha–Woldiya–Hara Gebeya railway (392 km) – completion of unfinished sections & conflict/earthquake damage repair within 2 years, after Yapı Merkezi arbitration

Client: Ethiopian Railway Corporation (ERC)

Pre-qualification / EOILatviaEUR 264MOpen – deadline not published

Riga Airport (Rail Baltica station) – Imanta 1,520 mm rail link and modernisation of Imanta–Riga Central–Ogre, EU Cohesion Fund agreement signed

Client: Latvijas dzelzceļš (LDz) and Eiropas Dzelzceļa līnijas (EDzL)

Pre-qualification / EOIUnited StatesUSD 130MOpen – deadline not published

Springfield Hub Modernization (Union Station tracks & signals reconfiguration) – USD 130M FRA CRISI grant awarded, design to start

Client: Massachusetts Department of Transportation (MassDOT)

Open tenderSpainEUR 6.54MOpen – deadline not published

Adif – renewal of signalling & telecom power supply line Arenys de Mar–Maçanet (Barcelona–Mataró–Maçanet line, ~37 km)

Client: Adif

Open tenderNorth MacedoniaOpen – deadline not published

Kriva Palanka–Bulgarian border railway (Corridor VIII final section) incl. cross-border tunnel – construction tender launched (EU grant EUR 149M)

Client: Government of North Macedonia

Contract awardNetherlandsContract awarded – subcontracting open

Waalhaven South rail yard expansion, Port of Rotterdam – six 740 m tracks, 12 locomotive positions, infrastructure renewal and further electrification

Awarded to VolkerRail · Client: ProRail

Contract awardItalyEUR 42.6MContract awarded – subcontracting open

RFI – clearance-gauge enlargement of Colle Porcina, Sella delle Vetiche and Contrafforte Ferrazzano tunnels plus works in four more tunnels, Baranello–Campobasso line (electrification)

Client: Rete Ferroviaria Italiana (RFI)

Pre-qualification / EOIUnited StatesUSD 550MOpen – deadline not published

S-Line passenger rail (Raleigh–Richmond, ~75 mi) – USD 550M FRA Federal-State Partnership funds obligated for track repairs and upgrades

Client: NCDOT / Virginia Passenger Rail Authority (FRA funding)

Contract awardChinaCNY 117.07MContract awarded – subcontracting open

Badain Jaran energy base coal-power railway spur (4.85 km) – EPC first-ranked candidate

Awarded to China Railway Eryuan Engineering Group (first-ranked candidate) · Client: Badain Jaran energy base 4x1,000 MW coal power project (owner not named)

Contract awardVietnamUSD 34.79BContract awarded – subcontracting open

Hanoi urban railway Lines 1, 2, 8, 10 & 14 – turnkey design, procurement, construction & handover contract

Awarded to Vinhomes JSC – SGC Investment and Construction JSC consortium · Client: Hanoi Urban Railway Management Board (Hanoi People's Committee)

Pre-qualification / EOISouth AfricaUSD 541MOpen – deadline not published

Sishen–Saldanha iron ore export railway (861 km) rehabilitation programme to 2030 – track renewal, electrical and signalling upgrades, rolling stock repairs

Client: Government of South Africa (Department of Transport); line operated by Transnet Freight Rail

Contract awardPolandPLN 355MContract awarded – subcontracting open

Piecek-Migowo – Wrzeszcz tram line (~4 km double track, 7 stops, 280 m tunnel under ul. Wileńska, 2.8 km roads)

Awarded to Grupa NDI · Client: Dyrekcja Rozbudowy Miasta Gdańska

Contract awardUnited KingdomContract awarded – subcontracting open

Heaton Park Metrolink stop step-free access upgrade (design & build)

Awarded to Kier · Client: Transport for Greater Manchester (TfGM)

Open tenderAlgeria · الجزائرOpen – deadline not published

El-Menea–In Salah–Tamanrasset railway corridor – 310 km rail package tender

Client: Algerian government (rail agency not named in public teaser)

Pre-qualification / EOIArgentinaOpen – deadline not published

Railway branches C14 (Salta–Socompa/Antofagasta) and C15 (Salta–Bolivia) – Economy Ministry to call mining and logistics operators to invest in rehabilitation

Client: Ministerio de Economía de la Nación

Contract awardGermanyEUR 2,000M+Contract awarded – subcontracting open

113 Mireo Plus B battery-electric trains, two new depots and 30-year full-service maintenance for Weser-Leine network (RB84/RB85/RB86) – over EUR 2bn

Awarded to Siemens Mobility · Client: LNVG (Landesnahverkehrsgesellschaft Niedersachsen) & Regionalverband Großraum Braunschweig (RGB)

Pre-qualification / EOIPolandPLN 356.8MOpen – deadline not published

Katowice Brynów–Kostuchna tram line (~9.7 km double track) with Kostuchna interchange – 14 bids, Budimex lowest

Client: Tramwaje Śląskie

Contract awardUnited KingdomGBP 650MContract awarded – subcontracting open

East West Rail – Marston Vale & Oxford–Bletchley capacity extension (double tracking Bletchley–Fenny Stratford, Stewartby layout, loops, electrification, re-signalling)

Awarded to East West Rail Alliance (Laing O'Rourke, VolkerRail, AtkinsRéalis) · Client: Network Rail

Pre-qualification / EOIKenyaOpen – deadline not published

Talanta Sports City rail connection – 13.3 km track upgrade Nairobi Central–Satellite, 1.3 km Kibera–Satellite second line, 2 commuter stations & footbridges/underpasses (proposed)

Client: Kenya Railways Corporation

Contract awardTaiwanMYR 3.7BContract awarded – subcontracting open

Keelung MRT system & trackwork (15.6 km, 13 stations) – additional work to Xizhi–Donghu MRT, awarded to Gamuda–MiTAC JV

Awarded to Gamuda Bhd (72.84%) – MiTAC Information Technology (27.16%) JV · Client: Department of Rapid Transit Systems, New Taipei City Government

Contract awardPortugalEUR 2651MContract awarded – subcontracting open

Porto–Lisbon high-speed line section 1 Porto Campanhã–Oiã (71 km, PPP) – construction launched

Awarded to AVAN consortium (Mota-Engil, Teixeira Duarte, Alves Ribeiro, Casais, Conduril, Gabriel Couto) · Client: Portuguese State / Infraestruturas de Portugal (30-year PPP concession)

Contract awardBangladeshBDT 584.78BContract awarded – subcontracting open

Dhaka MRT Line-1 (CP-02, 04, 06, 07, 09, 10) and MRT Line-5 Northern (CP-02, 03) – eight civil, track, E&M and systems packages approved by CCGP

Awarded to SINOHYDRO–SEBCL JV; TOKYU–MIL JV; NISHIMATSU–TPL–TODA JV; CREC–MIL–MBEC JV; L&T–Sumitomo; Larsen & Toubro; CPC–HANIL JV · Client: Dhaka Mass Transit Company Ltd (DMTCL); JICA-supported

Contract awardPolandPLN 367MContract awarded – subcontracting open

New ~5.5 km double-track rail line Modlin station – Modlin Airport, with 3 road bridges and new airport station

Awarded to Skanska · Client: PKP Polskie Linie Kolejowe

Open tenderAlgeria · الجزائرOpen – deadline not published

Eastern mining rail corridor (Annaba–Djebel Onk line & Bled El-Hadba branch) – railway systems: signalling, telecoms & electrification

Client: Anesrif (National Agency for Railway Investment Studies & Monitoring)

Contract awardCanadaCAD 357MContract awarded – subcontracting open

VIA Rail locomotive assembly & maintenance facility – 100,000 sq ft, construction started

Awarded to Pomerleau · Client: VIA Rail Canada

Pre-qualification / EOIAzerbaijanUSD 302MOpen – deadline not published

Baku Metro signalling modernisation – CBTC, operations control centre and digital systems (ADB loan USD 302M, total USD 515M)

Client: Baku Metro CJSC / Government of Azerbaijan (ADB, AIIB co-finance)

Pre-qualification / EOIEgypt · مصرOpen – deadline not published

El Max dry-bulk terminal (2 berths, storage yards, silos, rail link) – Alexandria Port Authority MoU with Xiamen C&D

Client: Alexandria Port Authority

Contract awardAlgeria · الجزائرUSD 1.1bnContract awarded – subcontracting open

Ghardaïa–El Menia railway section (230 km) – USD 1.1bn construction contract won by Chinese/Algerian joint venture

Awarded to Chinese/Algerian joint venture (members not disclosed) · Client: Algerian state rail developer (ANESRIF)

Pre-qualification / EOIUAE · الإماراتAED 34bn (USD 9.2bn)Open – deadline not published

Dubai Metro Gold Line (42 km underground, 18 stations, AED 34bn) – six consortia submit prequalification statements for design-build

Client: Roads & Transport Authority (RTA), Dubai

Contract awardSaudi Arabia · السعوديةSAR 5.5bn (USD 1.47bn)Contract awarded – subcontracting open

Riyadh Metro fleet expansion – 94 new trains (fleet 183 → 277) plus systems, maintenance & training, SAR 5.5bn

Awarded to Siemens; Alstom · Client: Royal Commission for Riyadh City (RCRC)

Pre-qualification / EOIAzerbaijanUSD 350MOpen – deadline not published

Bilajari–Yalama railway upgrade – electrification, signalling & telecoms (ADB USD 350M, total USD 448M, completion 2030)

Client: Azerbaijan Railways (ADY) CJSC

Pre-qualification / EOIPeruUSD 844MOpen – deadline not published

Ciudad-Puerto Corío – three-stage multipurpose port terminal (bulk, general cargo, containers) + 34,000 ha logistics city; ProInversión–GORE Arequipa agreement

Client: ProInversión / Gobierno Regional de Arequipa

Pre-qualification / EOIPhilippinesOpen – deadline not published

MRT-3 O&M / capacity-expansion PPP concession – solicited bidding due Oct 2026 (74 firms interested); bundling with LRT-2 O&M under review

Client: Department of Transportation (DOTr)

Pre-qualification / EOIEgypt · مصرEGP 12.7bnOpen – deadline not published

North Sinai public investment plan – EGP 12.7bn, 280 projects: Arish seaport development (EGP 4.6bn), Fardan–Bir al-Abd–Arish–Rafah–Taba rail (EGP 206M), desalination water transmission lines, irrigation intakes, hospitals

Client: Ministry of Planning and Economic Development / Ministry of Transport / SCZone

Pre-qualification / EOICzechiaOpen – deadline not published

Brno–Nezamyslice railway modernisation (new double track, up to 200 km/h) – PPP concession tender documents in preparation, start decision due at year-end

Client: Správa železnic / Ministry of Transport of the Czech Republic

Pre-qualification / EOIDemocratic Republic of CongoOpen – deadline not published

MetroKin urban rail phase 1 – 22.3 km double-track Kinshasa Central Station–N'Djili Airport line, 8 stations, depot & control centre; state guarantee and interface agreements signed, construction start set for December 2026

Client: MetroKin / Government of DR Congo (with RVA and ONATRA)

Pre-qualification / EOIUzbekistanUSD 169–357M (offer range)Open – deadline not published

Tashkent Metro – procurement of 14 five-car metro trains approved; 7 manufacturers' offers compared (CRRC, GTS, Hyundai Rotem favoured)

Client: Tashkent Metro / Tashkent City Council

Pre-qualification / EOIEgypt · مصرEUR 403MOpen – deadline not published

Tanta–Mansoura–Damietta railway (119 km) final phase – signalling/telecoms modernisation and doubling of Mansoura–Damietta: 3 consortia bid

Client: Egyptian National Railways (ENR)

Contract awardUnited StatesUSD 136MContract awarded – subcontracting open

Railroad improvement project for public client, northeast USA – Skanska contract (to Dec 2029)

Awarded to Skanska · Client: Undisclosed public client (northeast US)

Contract awardUnited KingdomContract awarded – subcontracting open

Virgin Trains cross-Channel fleet – 12 Alstom Avelia Stream 300 km/h trains with 30-year maintenance

Awarded to Alstom · Client: Virgin Trains (Virgin Group)

Pre-qualification / EOIArgentinaUSD 75MOpen – deadline not published

Belgrano Sur railway viaduct to Constitución – completion of 4.2 km elevated viaduct, elevated stations & Roca-line interface (68.5% built, stalled since 2024)

Client: Gobierno de la Ciudad de Buenos Aires (takeover from national government)

Open tenderIndiaINR 599.33 croreOpen – deadline not published

New BG line Vaddamanu–Namburu (28.35 km) – EPC for civil, electrical, signalling & Kavach works

Client: South Coast Railway (SCR)

Contract awardSouth AfricaContract awarded – subcontracting open

Gautrain 15-year operations & maintenance concession – fleet growth from 24 to 32 trainsets (8 new Alstom trains), new signalling, communications, station & depot upgrades

Awarded to Sihamba Sonke Mobility (AIIM-Motseng, Alstom, RATP Dev, GIBB-Crede, AIH Connect, SSM InvestCo) · Client: Gauteng Provincial Government / Gautrain Management Agency

Contract awardSpainEUR 26.48MContract awarded – subcontracting open

Adif framework agreement – supply of rail for partial track renewal on lines 700/710 (Castejón de Ebro–Irún, Castejón–Tafalla), exp. 3.25/27510.0268

Awarded to ArcelorMittal España, S.A. · Client: ADIF – Consejo de Administración

Open tenderSpainEUR 128.6M (excl. VAT)Open – closes 01 Dec 2026 (12 days)

Adif – Torrelavega rail undergrounding (Santander–Oviedo narrow-gauge line): ~2.1 km works, 615 m covered section, new underground station & car park

Client: ADIF

Pre-qualification / EOIKenyaKES 65bnOpen – deadline not published

Nairobi commuter rail modernisation & electrification (57 km Nairobi–Thika corridor, KES 65bn) – consultant recruitment launched under KUMIP

Client: Kenya Railways Corporation – Kenya Urban Mobility Improvement Project (World Bank)

Pre-qualification / EOIHong KongOpen – deadline not published

Hong Kong–Shenzhen Western Rail Link (18 km, Deep Bay tunnel) – design & construction tendering 2027; Northern Link Main Line + branch – TBM works from 2028

Client: Hong Kong SAR Government (railway development plan)

Pre-qualification / EOIUkraineEUR 150MOpen – deadline not published

Kyiv metro fleet renewal – EBRD EUR 150M loan for new metro cars, spare parts, maintenance equipment and accessibility programme

Client: City of Kyiv / Kyiv Metro

Contract awardUnited KingdomGBP 115MContract awarded – subcontracting open

Manchester Airport station upgrade – platform 1–3 extensions, approach track remodelling and signalling modernisation (Manchester Rail Upgrade), works winter 2026–2028

Awarded to Kier · Client: Network Rail

Pre-qualification / EOIEgypt · مصرOpen – deadline not published

Hydrogen-powered tram system (44 trainsets) for the New Capital – MoU for feasibility study

Client: National Authority for Tunnels (NAT), Egypt

Contract awardVietnamContract awarded – subcontracting open

Supply of up to 200 five-car metro trains for Hanoi urban rail – up to 83 Alstom Metropolis trains + up to 117 assembled locally by Vinhomes under technology licence

Awarded to Alstom · Client: Vinhomes (Vingroup)

Open tenderIndiaINR 49.31bnOpen – closes 18 Feb 2027 (91 days)

Indore–Manmad new rail line: Mhow–Gyaraspurkhedi section (72.66 km) – 25 major bridges, 4 ROBs, tunnels, viaduct, 7 stations

Client: Central Railway

Contract awardJordan · الأردنUSD 2.5bnContract awarded – subcontracting open

Aqaba–Shidiya–Ma'an mining railway (403 km, ~55 bridges, 6 tunnels) – ground broken, five-year build

Client: Jordanian-Emirati Railway Company (Limad Holding / JPMC / APC / GIMC / SSIF; operator Etihad Rail)

Contract awardMexicoMXN 22.4bnContract awarded – subcontracting open

Querétaro–Saltillo passenger train Tramo 1, Querétaro–San Miguel de Allende 68 km – design & construction of viaducts, tunnels, stations and crossings

Awarded to Mota-Engil México / Mota-Engil Engenharia e Construção / Mota-Engil Engenharia Construção África consortium · Client: Agencia de Trenes y Transporte Público Integrado (ATTRAPI)

Contract awardGermanyContract awarded – subcontracting open

Hanover–Berlin rail corridor general modernisation – 357 km track, 214 points, 100 km OLE, 25 stations, ETCS; works started 2 Oct 2026

Client: DB InfraGO (Deutsche Bahn)

Pre-qualification / EOIIndiaINR 22,000 croreOpen – deadline not published

Gohpur–Numaligarh 33.7 km corridor with 15.79 km twin-tube underwater road-cum-rail tunnel under Brahmaputra – construction to start by Dec 2026

Client: Ministry of Road Transport and Highways (MoRTH)

Contract awardIndiaINR 37.26 croreContract awarded – subcontracting open

Replacement of ageing railway structures, Waria–Raniganj section – Eastern Railway (12 months)

Awarded to BCPL Railway Infrastructure Ltd · Client: Eastern Railway (Asansol division)

Pre-qualification / EOICzechiaCZK 467MOpen – deadline not published

Reconstruction of 9.76 km military rail siding to Náměšť nad Oslavou helicopter base (22.5 t axle load, NATO standard) – design documentation procurement

Client: Czech Army / Armádní Servisní

Pre-qualification / EOIIndiaINR 149.49 croreOpen – deadline not published

Electronic interlocking with MSDAC and block working at 18 stations, Bhavnagar division – Alcon Builders (GPT Infraprojects) L1

Client: Western Railway

Open tenderIndiaINR 1,163.32 croreOpen – closes 27 Jan 2027 (69 days)

Bikramshila–Katareah new rail line (33.294 km) with Y-links to Naugachia & Shivnarayanpur – EPC (ECR-CAO-C-S-EPC-05-26-27)

Client: East Central Railway (Indian Railways)

Pre-qualification / EOISpainEUR 1.57BOpen – deadline not published

Madrid 10-year urban rail extension programme – 27.8 km of new metro Lines 1, 10, 11 and Metro Ligero ML3 (studies 2027–29, works 2030–34)

Client: Comunidad de Madrid (regional government)

Contract awardAustriaEUR 1.3BContract awarded – subcontracting open

ÖBB nationwide digital interlocking programme (~300 digital interlockings, 30-year framework) – Hitachi Rail selected as one of two technology partners

Awarded to Hitachi Rail · Client: ÖBB (Austrian Federal Railways)

Pre-qualification / EOISouth AfricaZAR 395bnOpen – deadline not published

Infrastructure South Africa Construction Book 3 – 110 projects (transport, energy, water, social, municipal, digital) due for procurement within 12–18 months

Client: Infrastructure South Africa (ISA)

Pre-qualification / EOIFinlandEUR 48MOpen – deadline not published

Crown Bridges light rail extension Hakaniemi–city centre–Jätkäsaari (5 km) approved by city council

Client: City of Helsinki

Pre-qualification / EOIArgentinaUSD 1,350MOpen – deadline not published

Buenos Aires Subte Line F – 9.8 km, 12-station metro line, technical bids opened (2 consortia)

Client: Government of the City of Buenos Aires (GCBA)

Contract awardCzechiaCZK 496MContract awarded – subcontracting open

Opava–Kravaře line 317 flood reconstruction – demolition of 3 bridges, new 255 m viaduct, track & signalling

Awarded to Strabag Rail · Client: Správa železnic

Pre-qualification / EOIIndiaINR 1.22bnOpen – deadline not published

Barbil–Bolanikhadan rail doubling (6 km) on mineral corridor – sanctioned

Client: Indian Railways / South Eastern Railway

Pre-qualification / EOIMontenegroEUR 225.6MOpen – deadline not published

Golubovci–Bar railway section (39 km) modernisation – track renewal, 3 stations, 11 bridges, signalling, telecoms & power (EBRD EUR 50M loan)

Client: Montenegro state-owned railway company

Pre-qualification / EOIPakistanUSD 1.1bnOpen – deadline not published

ML-1 Karachi–Rohri (480 km) railway modernisation – ADB USD 1.1bn investment programme being finalised

Client: Pakistan Railways / Asian Development Bank

Contract awardCroatiaEUR 677MContract awarded – subcontracting open

Dugo Selo–Novska 83 km railway reconstruction and second track (160 km/h, 4 stations, 30+ level crossings removed)

Awarded to Afcons Infrastructure (works); Eptisa Adria (supervision) · Client: HŽ Infrastruktura

Pre-qualification / EOIArgentinaOpen – deadline not published

Urquiza line railway bridge renewal at km 11+437 (Av. Illia), Villa Bosch – 4 bids opened

Client: Trenes Argentinos Infraestructura (ADIF)

Pre-qualification / EOIIndiaINR 41.78bnOpen – deadline not published

Arakkonam–Renigunta 3rd & 4th line (77 km) and Salem–Karur–Dindigul doubling (159 km) – sanctioned

Client: Railway Board, Indian Railways

Contract awardSaudi Arabia · السعوديةEUR 460MContract awarded – subcontracting open

Riyadh Metro Lines 3, 4 & 6 – additional Metropolis driverless trains with CBTC signalling, system integration and O&M (EUR 460M)

Awarded to Alstom · Client: Royal Commission for Riyadh City (RCRC)

Pre-qualification / EOICanadaOpen – deadline not published

Calgary–Red Deer–Edmonton high-speed rail – RFP to private proponents (launch fall 2026, selection April 2027)

Client: Government of Alberta / Government of Canada

Pre-qualification / EOIKenyaUSD 38.5MOpen – deadline not published

Voi–Tanzania border standard-gauge railway link – new SGR extension announced (initial KES 5bn)

Client: Government of Kenya

Contract awardSpainEUR 26.3MContract awarded – subcontracting open

Eastern high-speed corridor – protection barriers, fencing & access works at Villarrubia, Gabaldón, Requena and Monforte del Cid bases

Client: Adif Alta Velocidad

Open tenderPolandPLN 693M (gross est.)Open – deadline not published

Line 353 Toruń Główny–Toruń Wschodni modernisation incl. 1873 Vistula rail bridge reconstruction and new stops

Client: PKP Polskie Linie Kolejowe / City of Toruń

Pre-qualification / EOIDenmarkOpen – deadline not published

Copenhagen Metro Line M5 transport systems contract (trains, signalling, traction power, PSDs, depot) – 3 bidders shortlisted

Client: Metroselskabet

Pre-qualification / EOISouth AfricaUSD 1.9-2.7BOpen – deadline not published

Transnet Hotazel–Ngqura manganese export corridor – 25-year private partner (rail rehab, new manganese terminal, maintenance) – RFQ stage

Client: Transnet

Pre-qualification / EOIRomaniaEUR 2.25bnOpen – deadline not published

Brașov–Sighișoara 113 km rail modernisation (EUR 2.25bn) – EIB financing signed

Client: Romanian rail authorities (CFR)

Contract awardVietnamEUR 1bnContract awarded – subcontracting open

Two high-speed rail lines (175 km) – trains, signalling & electrification contract, EUR 1bn

Awarded to Siemens Mobility (systems); VinSpeed (civil & track) · Client: VinSpeed