2780 live leads · 55 new today · updated 19 Nov 2026Contactمناقصات يومية مجانية
Tender Leads DailyConstruction tenders & awards · every morning

Today

Oil, gas & petrochemical plants – construction tenders & awards

282 live oil, gas & petrochemical plants projects – tenders and contract awards, updated daily.

Get these every morning – free.New Oil, gas & petrochemical plants leads, straight to your email or WhatsApp.
Register free →
Contract awardArgentinaUSD 2bnContract awarded – subcontracting open

Argentina LNG trunk pipelines (~526 km) – line-pipe awards: Tenaris 24-inch liquids line (~100,000 t steel pipe); Grupo Cuñado (~200 km) and Corinth Pipeworks (~300 km) 48-inch gas line

Awarded to Tenaris; Grupo Cuñado; Corinth Pipeworks · Client: YPF (Argentina LNG with Eni and XRG)

Contract awardAlgeria · الجزائرContract awarded – subcontracting open

Menzel Ledjmet Nord gas field development – contract won by Indonesian contractor

Awarded to Indonesian contractor (not named in public summary) · Client: Not disclosed in public summary

Contract awardGuyanaContract awarded – subcontracting open

Longtail development – FPSO construct & install (250,000 bpd condensate, 1.2 bcf/d gas, ~2M bbl storage, spread-moored ~1,750 m), Fast4Ward hull

Awarded to SBM Offshore · Client: ExxonMobil Guyana Limited

Pre-qualification / EOILibya · ليبياUSD 1bnOpen – deadline not published

Dahra oil field development (~USD 1bn) – Libya considering tendering project to ramp up production

Client: Libyan oil sector (operator not named in public summary)

Pre-qualification / EOIMorocco · المغربEUR 4.5bnOpen – deadline not published

Janassim e-fuels project – ~300,000 t/yr e-methanol and e-kerosene with 2.2 GW wind and solar, seawater desalination and electrolysis (EUR 4.5bn)

Client: MGH Energy Maroc / HOLSATEK

Open tenderKuwait · الكويتUSD 40M (est.)Open – closes 06 Dec 2026 (17 days)

KOC – remote manifolds and associated works in South and East Kuwait (bid deadline extended to 6 Dec 2026)

Client: Kuwait Oil Company (KOC)

Contract awardSaudi Arabia · السعوديةSAR 104MContract awarded – subcontracting open

Saudi Aramco – manufacturing and coating of steel pipes (12 months, signed 15 Nov 2026)

Awarded to Arabian Pipes Co. · Client: Saudi Aramco

Open tenderSaudi Arabia · السعوديةOpen – closes 22 Dec 2026 (33 days)

Aramco Jafurah unconventional gas sixth expansion phase – EPC of two 200 MMcf/d gas compression plants (bids due 22 Dec)

Client: Saudi Aramco

Pre-qualification / EOIIndonesiaOpen – deadline not published

Pupuk Kaltim 2,500 t/d ammonia-urea complex in West Papua – Topsoe SynCOR technology licence & basic engineering; FID 2027, completion 2030

Client: Pupuk Indonesia (via Pupuk Kalimantan Timur)

Pre-qualification / EOIEgypt · مصرUSD 265MOpen – deadline not published

MOPCO fertilizer plants modernisation and capacity upgrade (2.0 to 2.2 Mt/yr) – USD 265M package incl. USD 165M bank loan

Client: Misr Fertilizers Production Company (MOPCO)

Pre-qualification / EOIUnited StatesOpen – deadline not published

D'Lo Gas Storage – 24 Bcf salt-dome storage (3 caverns), 36,007 hp compression and 30/24-inch interconnects to Gulf South, SNG and MEP – FERC abbreviated certificate application

Client: D'Lo Gas Storage LLC

Pre-qualification / EOICanadaOpen – deadline not published

TC Energy NGTL Alberta Growth Connector – proposed 230-mile (370 km) 48-inch gas pipeline adding ~1 Bcf/d to oil-sands region (subject to customer commitments and approvals)

Client: TC Energy (NOVA Gas Transmission Ltd. system)

Contract awardMozambiqueContract awarded – subcontracting open

Eni Coral Norte FLNG – engineering, fabrication, coating, testing and delivery of five ~400 m rigid subsea well jumpers, subcontracted by Baker Hughes to Mozambican-Italian consortium

Awarded to OeG Serviços / DUYS / Donelli / Ponticelli consortium · Client: Baker Hughes (for Eni / Area 4 Coral Norte project)

Contract awardKuwait · الكويتKWD 31.9MContract awarded – subcontracting open

KPC Supreme Purchasing Committee – wellhead control equipment and SCADA system for Jurassic wells, Phase 3 (KD 31.9M)

Awarded to Anton Oilfield Services DMCC · Client: Kuwait Petroleum Corporation (KPC) / subsidiaries

Contract awardCameroonXAF 11.14bn (~USD 19.7M)Contract awarded – subcontracting open

SCDP Bonabéri LPG hub – new 1,000 t LPG sphere S8, 5 truck loading bays, 6 rail-tanker loading positions, LPG pump station, metering, automation and safety systems (30 months)

Awarded to Parlym Cameroun · Client: Société Camerounaise des Dépôts Pétroliers (SCDP)

Open tenderEgypt · مصرOpen – deadline not published

Ganope / Egypt Upstream Gateway – Abu Marwa exploration block added to current bid round after investor interest

Client: Ganope (South Valley Egyptian Petroleum Holding Company)

Pre-qualification / EOIMozambiqueUSD 450MOpen – deadline not published

LNG import FSRU off Inhassoro plus spur line to the 865 km ROMPCO pipeline (USD 450M) – ENH–ROMPCO MoU signed, joint-development agreement targeted by January

Client: ROMPCO / Empresa Nacional de Hidrocarbonetos (ENH)

Contract awardTurkeyContract awarded – subcontracting open

SOCAR STAR refinery – Kerosene Merox unit EPC (frees KHT unit for ~600 kt/y extra diesel)

Awarded to Üstay – KT Kinetics Technology (Maire) consortium · Client: SOCAR STAR Refinery

Contract awardEgypt · مصرContract awarded – subcontracting open

Egypt – agreement with Halliburton covering 50 oil and gas wells (preparatory studies phase)

Awarded to Halliburton · Client: Egyptian Ministry of Petroleum and Mineral Resources

Contract awardGuyanaUSD 12.5BContract awarded – subcontracting open

ExxonMobil Longtail gas-condensate development FID – FPSO (1.2 bcf/d gas, 250,000 bpd condensate), 45 wells, subsea SURF

Client: ExxonMobil Guyana (with Hess/Chevron and CNOOC)

Pre-qualification / EOIUzbekistanUSD 1.8BOpen – deadline not published

Bukhara Oil Refinery expansion to 4.6 Mtpy product output plus Euro-5 gasoline project – plans reviewed by President

Client: Bukhara Oil Refinery

Pre-qualification / EOIKazakhstanOpen – deadline not published

Pavlodar Petrochemical Plant expansion from 6 to 9 Mtpy – FEED discussions between KMG and Samsung E&A

Client: KazMunayGas (KMG)

Pre-qualification / EOIIndiaOpen – deadline not published

GAIL–KRIBHCO 1.27 MMtpy gas-based urea plant at Mulapeta, Andhra Pradesh – MoU signed to develop via JV

Client: GAIL (India) Ltd & KRIBHCO JV; Andhra Pradesh Economic Development Board

Contract awardSyria · سورياContract awarded – subcontracting open

Homs–Aleppo gas pipeline – civil works under way (UCC)

Awarded to UCC · Client: Syria gas pipeline project (client not stated)

Contract awardUAE · الإماراتContract awarded – subcontracting open

ADNOC Onshore North East Bab (NEB) oil field cluster – facilities upgrade Phase 2

Awarded to Mannesmann Energy · Client: ADNOC Onshore

Pre-qualification / EOIMalaysiaUSD 211MOpen – deadline not published

Fatimah gas field development (Baram Junior Cluster Small Field Asset PSC) – FID taken by DIALOG

Client: DIALOG Resources (DIALOG Group) / Petronas & Petroleum Sarawak (PSEP)

Contract awardKazakhstanContract awarded – subcontracting open

Karachaganak 5 bcm/yr gas processing plant – EPC contract signed (QazaqGaz Processing)

Awarded to Hyundai Engineering Co. – SICIM Kazakhstan LLP consortium · Client: QazaqGaz Processing LLP (QazaqGaz NC)

Contract awardKazakhstanContract awarded – subcontracting open

Kazazot Prime ammonia-urea-nitric acid-ammonium nitrate complex (660 ktpy ammonia) – PMC contract

Awarded to Técnicas Reunidas · Client: Kazazot Prime LLP

Pre-qualification / EOIChinaCNY 20.7BOpen – deadline not published

Satellite Chemical Xuwei New Area propylene complex – 2 Mtpy PDH, acrylic acid, butyl acrylate and multi-carbon alcohols (two phases)

Client: Satellite Chemical Co., Ltd.

Contract awardOman · عُمانContract awarded – subcontracting open

PDO Al-Ghubar sour gas-oil gravity drainage (GOGD) facility, Block 6 – EPC incl. separators, gas-lift compressor, 132 kV substation, pipeline network and two remote manifold stations

Awarded to Jereh Group · Client: Petroleum Development Oman (PDO)

Contract awardOman · عُمانContract awarded – subcontracting open

Hydrom Round 3 – two Duqm green hydrogen projects awarded: green ammonium nitrate (1.16 GW RE, ~50,000 t/yr H2) and green ammonia export (~1.45 GW solar, ~1 GW electrolysis, 400,000 t/yr NH3)

Awarded to Petrogas E&P / Bio3Energy; PLN Indonesia Power Renewables / Alawi Enterprises / HBA Offshore International · Client: Hydrom (Hydrogen Oman)

Pre-qualification / EOIIraq · العراقOpen – deadline not published

Iraq–Saudi Arabia (IPSA) crude export pipeline revival – 1,568 km Zubair–Yanbu line, Saudi preliminary approval; Iraq to fund restoration of its section

Client: Iraq Ministry of Oil

Pre-qualification / EOIVietnamUSD 1.55bnOpen – deadline not published

Long Son LNG-fired power plant (42.56 ha, COD June 2031) – investor selection: 3 applicants (T&T–TotalEnergies, EVNGENCO3–AG&P, Ngoc Long Hai Son)

Client: Long Son LNG power project investor selection (Ho Chi Minh City)

Pre-qualification / EOIIraq · العراقOpen – deadline not published

National south–north LPG pipeline – Ministry of Oil orders feasibility study

Client: Ministry of Oil, Iraq

Pre-qualification / EOIQatar · قطرOpen – deadline not published

QatarEnergy Mesaieed blue ammonia and urea expansion (four new urea lines) – main EPC tender delayed, bid deadline pushed to April

Client: QatarEnergy

Contract awardSwedenContract awarded – subcontracting open

Alby PtX e-SAF plant (~66,000 t/yr synthetic aviation fuel) – FEED for full process, leading to EPC on FID

Awarded to Técnicas Reunidas · Client: Alby PtX AB (Norsk e-Fuel / Prime Capital)

Contract awardUAE · الإماراتContract awarded – subcontracting open

ADNOC West–East 48-inch crude pipeline (Jebel Dhanna–Fujairah) – Borcoat HE3450/HE3450H polyethylene pipe coating supply agreement with NMDC

Awarded to Borouge International · Client: NMDC (for ADNOC West–East pipeline)

Contract awardUAE · الإماراتContract awarded – subcontracting open

SNOC expanded underbalanced coiled tubing drilling (UBCTD) framework – Moveyeid gas storage and Hedebah gas field development phases, campaign from 2027

Awarded to SLB · Client: Sharjah National Oil Corporation (SNOC)

Pre-qualification / EOILibya · ليبياOpen – deadline not published

Libya LNG-to-power programme – coastal gas pipeline completion frameworks approved and FSRU tender documents being prepared ahead of summer-2027 peak

Client: Ministry of Industry & Minerals – LNG Study Committee / Sirte Oil Company / NOC

Pre-qualification / EOIUnited StatesOpen – deadline not published

Plains Oryx Permian Basin JV – crude oil gathering system expansion for ~270,000 newly dedicated acres (~225,000 bpd gross) under 10-year agreements, first volumes Q4 2027

Client: Plains All American Pipeline (Plains Oryx Permian Basin LLC)

Pre-qualification / EOIUnited StatesUSD 1.11bnOpen – deadline not published

Boardwalk Kosciusko Junction Pipeline Project – 103 mi 36-inch loop of Gulf South 42-inch line plus 8 mi Columbia Gulf Lateral, new Kosciusko (51,554 hp) & Holmes compressor stations, Isola expansion, 4 M&R stations (1.175 MMDth/d); FERC staff authorised construction 6 Nov 2026

Client: Gulf South Pipeline Co. / Texas Gas Transmission (Boardwalk Pipelines)

Open tenderLebanon · لبنانOpen – closes 19 Jan 2027 (61 days)

EDL rehabilitation of gas (fuel) storage depot at Nahr Road site – public tender 52/2026, 3-month execution

Client: Électricité du Liban (EDL)

Pre-qualification / EOISyria · سورياUSD 6–8BOpen – deadline not published

New Syrian oil refinery (est. USD 6–8bn) – international companies in talks to develop under BOT contract

Client: Government of Syria

Contract awardQatar · قطرContract awarded – subcontracting open

Maydan Mahzam offshore field redevelopment – detail design for three major topsides, four jackets and brownfield tie-ins (LoA from PTSC M&C)

Awarded to Aker Solutions · Client: PTSC Mechanical & Construction (for QatarEnergy)

Pre-qualification / EOISaudi Arabia · السعوديةUSD 10bn+ (press estimate)Open – deadline not published

Aramco Al Hadha gas processing plant expansion – three EPC packages (gas treatment trains/AGRU/TEG, sulphur recovery, utilities & infrastructure) expected to be tendered by Dec 2026

Client: Saudi Aramco

Contract awardKuwait · الكويتUSD 127.3MContract awarded – subcontracting open

KOC supply and operation of three new 1,000-hp drilling and workover rigs

Awarded to MBPS for Petroleum Services (Oman) · Client: Kuwait Oil Company (KOC)

Pre-qualification / EOILibya · ليبياOpen – deadline not published

Messla and Sarir gas system (flare-gas recovery ~34 MMscfd) – NOC/AGOCO and SLB move to phase-2 detailed technical study (due Q1 2027)

Client: National Oil Corporation (NOC) / Arabian Gulf Oil Company (AGOCO)

Contract awardAngolaContract awarded – subcontracting open

ExxonMobil Angola – five-year oil & gas operations and maintenance services contracts awarded to Dietsmann

Awarded to Dietsmann · Client: ExxonMobil (Angola)

Contract awardDemocratic Republic of CongoContract awarded – subcontracting open

Engip-RDC contract with ABC Sodimel – spare parts for major overhaul of pumping units on pipelines 46 & 66 (332 km Matadi–Kinshasa)

Awarded to ABC Sodimel (Ogepar Group) · Client: Engip-RDC SA

Contract awardUAE · الإماراتContract awarded – subcontracting open

ADNOC framework agreements for local manufacturing and supply of reinforced thermoplastic pipe (RTP) – Eniprom, Al Ghaith Energy, Liwa Petroleum

Awarded to Eniprom Gas and Oilfield; Al Ghaith Energy; Liwa Petroleum and Industrial Supplies · Client: ADNOC

Contract awardKuwait · الكويتKWD 9.7M (~USD 31.4M)Contract awarded – subcontracting open

KOC repair and revamp of production facilities in West Kuwait – five-year contract

Awarded to Combined Group Contracting Company · Client: Kuwait Oil Company (KOC)

Pre-qualification / EOIMalaysiaOpen – deadline not published

SK410B Lang Lebah and B14 gas fields (>6.5 tcf) – farm-out agreements: TotalEnergies (operator 30%), PTTEP 25%, KUFPEC 25%, Petronas Carigali 20%; pre-development

Client: TotalEnergies EP (operator) with PTTEP HKO, KUFPEC Malaysia, Petronas Carigali

Contract awardNigeriaKRW 350bn (~USD 261M)Contract awarded – subcontracting open

Indorama Fertilizer Train 4 – 2,300 t/d ammonia and 4,000 t/d urea plant, letter of award to Daewoo E&C as main contractor

Awarded to Daewoo E&C · Client: Indorama Fertilizer Free Zone Enterprise (IF FZE)

Contract awardUAE · الإماراتContract awarded – subcontracting open

Borouge EU2 ethane cracker expansion (+230,000 t/yr) early engineering and EU3 cracker upgrade pre-FEED – Linde Engineering (letter of award)

Awarded to Linde Engineering · Client: Borouge International

Pre-qualification / EOINamibiaUSD 2.5bnOpen – deadline not published

Dangote Walvis Bay fuel terminal – 600 million-litre storage (360 ML diesel, 240 ML petrol) on ~70 ha, ~16 km jetty-to-tank pipeline; planned ~1,700 km regional product pipeline – groundbreaking held

Client: Dangote Group (Office of the President coordinating; Afreximbank possible financier)

Open tenderAlgeria · الجزائرOpen – deadline not published

Engineering contract tendered for Oued Zine gas processing complex

Client: Sonatrach (per MEED; client not shown in public summary)

Contract awardIraq · العراقContract awarded – subcontracting open

West Qurna-1 Gas Compressor Station 6 – detailed engineering design for low-pressure associated-gas capture (flare reduction)

Awarded to KBR · Client: Basra Gas Company / AKT (Abraj Al-Kut Oil Services) EPC

Contract awardUAE · الإماراتAED 1bn (~USD 272M)Contract awarded – subcontracting open

Haliba produced-water treatment facilities – design, build and operate agreement (signed at ADIPEC 2026)

Awarded to Excel ASTRA Engineering & Construction LLC · Client: Al Dhafra Petroleum (ADNOC / KNOC / GS Energy JV)

Open tenderMexicoOpen – closes 03 Dec 2026 (14 days)

PEMEX DEE-CAT-S-GCMCYLM-823-106632-26-1 – maintenance of high-capacity fire pumps (Hydrosub and/or HFS) at exploration & production facilities

Client: Petróleos Mexicanos (PEMEX) – Confiabilidad y Logística

Contract awardUnited StatesContract awarded – subcontracting open

CP2 Expansion LNG export project – reimbursable EPC contract (follows Worley's EPC role on CP2 Phases 1 & 2; FID targeted early 2027)

Awarded to Worley · Client: Venture Global

Pre-qualification / EOIUzbekistanUSD 292MOpen – deadline not published

Tekhnochem aromatics & solvents expansion – +400,000 tpy condensate/naphtha processing (USD 292M, completion end-2028)

Client: Tekhnochem

Open tenderNigeriaOpen – closes 19 Nov 2026 (0 days)

SNEPCo invitation to tender – call-off subsea intervention, installation, maintenance, repair and technical support services, Bonga Field

Client: Shell Nigeria Exploration and Production Company Ltd (SNEPCo)

Pre-qualification / EOIAustraliaOpen – deadline not published

Victoria Energy Terminal – FSRU-based LNG import project moving through permitting

Client: Vopak

Contract awardMozambiqueUSD 7.2bn (project financing structure)Contract awarded – subcontracting open

Coral Norte FLNG – development drilling of up to 6 production wells (2 phases, ~10 months) by ENH-Saipem Drilling Company with drillship Saipem 12000; 3.55 Mtpa FLNG 72% built

Awarded to ENH-Saipem Drilling Company (Saipem 12000) · Client: Eni / Area 4 partners (Coral Norte project)

Contract awardUAE · الإماراتUSD 2.7bn (AED 9.9bn)Contract awarded – subcontracting open

ADNOC Onshore letters of award to Jereh – Ruwais Diyab gas full development (DBO, USD 1.7bn), Bab/NE Bab and Bu Hasa One Tie-In onshore facilities frameworks

Awarded to Jereh Oil & Gas Engineering Corporation – Abu Dhabi · Client: ADNOC Onshore

Open tenderBahrain · البحرينOpen – closes 23 Dec 2026 (34 days)

Five-year well fishing, sidetrack and through-tubing fishing/milling services for Bahrain Field development wells (tender 525/2026/BTB, TP-1328-2025)

Client: Bahrain Tender Board (Bahrain Field onshore development)

Contract awardCanadaContract awarded – subcontracting open

LNG Canada Phase 2 (Trains 3 & 4, 14→28 Mtpa) – main automation contractor: DCS (CENTUM VP), SIS (ProSafe-RS), fire & gas, OTS, cybersecurity and industrial networks

Awarded to Yokogawa Corporation of America · Client: LNG Canada (EPC: JGC Fluor BC LNG II JV)

Contract awardPolandPLN 8.05bnContract awarded – subcontracting open

Kozienice 2 × 668 MWe CCGT units (~1.3 GW) – EPC by Çalik Enerji, project finance closed (PLN 8.05bn total, EPC PLN 6.95bn), foundations under way

Awarded to Çalik Enerji (EPC); Energoprojekt-Katowice (designer); GE Vernova (steam turbines, generators) · Client: Enea (Enea Elkogaz)

Pre-qualification / EOIUAE · الإماراتOpen – deadline not published

ADNOC NEB central processing plant (CPP) upgrades at Nouf, Rumaitha and Shanayel – capacity and asset-integrity works (agreement expected)

Client: ADNOC

Pre-qualification / EOIUnited StatesUSD 1.6bnOpen – deadline not published

Energy Transfer South Mississippi gas pipeline – 215-mile, 36-inch, 1.2 Bcf/d line, FID taken (~USD 1.6bn, in service 2030)

Client: Energy Transfer

Pre-qualification / EOIArgentinaUSD 1.5bnOpen – deadline not published

TGN Vaca Muerta–northern Argentina gas pipeline (~753 km / 468 mi, ~USD 1.5bn) – capacity tender to launch early December 2026, FID expected in March, operations April 2029

Client: Transportadora de Gas del Norte (TGN)

Contract awardTurkeyContract awarded – subcontracting open

Sakarya gas field Phase 3 FPU (25 MMm³/d, Black Sea, 2,150 m water depth) for TPAO – keel laid, EPCIC by Wison New Energies

Awarded to Wison New Energies · Client: Türkiye Petrolleri A.O. (TPAO)

Pre-qualification / EOIKuwait · الكويتKWD 485.6M (lowest bids)Open – deadline not published

KOC enhanced oil recovery (EOR) technology special tender – 9 bids opened for 3 packages (lowest total KWD 485.6M)

Client: Kuwait Oil Company (KOC) via KPC Supreme Purchasing Committee

Pre-qualification / EOIIraq · العراقOpen – deadline not published

Basra–Haditha crude export pipeline – trilateral Iraq–Jordan–Egypt technical talks on diameter, capacity, branches and export routes, plus proposed joint petrochemical complex and storage

Client: Iraq Ministry of Oil (with Jordan and Egypt)

Pre-qualification / EOIPakistanUSD 4.4bnOpen – deadline not published

Port Qasim integrated LNG merchant hub – 560,000 m³ storage terminal (phase 1) and 1,100 km upcountry gas pipeline (phase 2), USD 4.4bn proposal

Client: Consortium led by Global Vision Energy Partners, Khanjee Holdings and General Mediterranean Holding

Pre-qualification / EOIMorocco · المغربUSD 239MOpen – deadline not published

Nador West Med sustainable aviation fuel plant (176,000–200,000 t/yr, ~USD 239M) – Shell offtake signed, EBRD weighing up to USD 135M

Client: Green Sky Capital (Green Sky Manara LLC)

Pre-qualification / EOIIndiaINR 50bnOpen – deadline not published

Mormugao Port LPG import & storage terminal – MoU, 3 Mtpa, 258,000 m3 storage (Phase I 65,000 t refrigerated), dedicated LPG berth and underground pipeline

Client: Government of Goa

Contract awardEgypt · مصرUSD 170MContract awarded – subcontracting open

Gas pipeline contract for the project to export Cyprus offshore gas via Egypt (USD 170M)

Awarded to Petrojet · Client: n/d (Cyprus–Egypt gas export project, Eni-led)

Pre-qualification / EOIEgypt · مصرOpen – deadline not published

ACURE green ammonia project – 12 km² plot allocated, 100,000 t/yr first phase (up to 1 Mt/yr) powered by a 600 MW solar plant; ACWA Power East Nile MoU extended

Client: ACURE (India) / Egypt National Council for Green Hydrogen

Pre-qualification / EOIUAE · الإماراتOpen – deadline not published

Ruwais Diyab unconventional gas development – FID taken: 345 mmcf/d raw gas (expandable to 1 bcf/d), design-build-operate model led by Adnoc Onshore, new tie-in pipelines, first gas 2029

Client: ADNOC / ADNOC Onshore

Pre-qualification / EOIIraq · العراقOpen – deadline not published

Associated-gas flaring capture & utilisation at Iraqi oil production sites (gas-to-power, carbon credits MRV) – MoU signed

Client: General Company for Carbon Economics (GCCE), Iraq

Open tenderEgypt · مصرOpen – closes 14 Dec 2026 (25 days)

EGPC 2026 international bid round (6 blocks) and EGAS round (8 blocks) – bid deadline extended to 14 December

Client: Egyptian General Petroleum Corporation (EGPC) / EGAS

Open tenderKuwait · الكويتOpen – closes 22 Dec 2026 (33 days)

Al-Zour LNG import facilities – EPC, pre-commissioning, commissioning & performance testing of a natural gas regasification unit (CZ/LNGI/MP/012)

Client: Kuwait Integrated Petroleum Industries Company (KIPIC)

Pre-qualification / EOIIraq · العراقOpen – deadline not published

UEG (Kuwait Energy) Block 9 Faihaa and Siba gas field development plans and Fao exploration project – work programmes reviewed with Ministry of Oil

Client: United Energy Group (Kuwait Energy) / Iraq Ministry of Oil

Pre-qualification / EOIIraq · العراقOpen – deadline not published

DNO Kurdistan drilling expansion – eight-well programme with second rig; third large rig under consideration for 2027

Client: DNO ASA

Pre-qualification / EOIIraq · العراقOpen – deadline not published

Iraq gas-flaring elimination programme – new free and associated gas projects at Nasiriyah field and four exploration blocks with Chevron, ExxonMobil and HKN (zero flaring by early 2029)

Client: Iraq Ministry of Oil

Pre-qualification / EOIPhilippinesUSD 150MOpen – deadline not published

APECO ecozone LNG-to-power project – MoU for 50–100 MW gas-fired plant with substation microgrid, LNG regas & storage, scaling to 500 MW then 2 GW (feasibility stage)

Client: Aurora Pacific Economic Zone and Freeport Authority (APECO)

Contract awardChinaCNY 10.8bn (~USD 1.5bn)Contract awarded – subcontracting open

Songyuan integrated green hydrogen-ammonia-methanol project Phase 2 – construction begins (renewables to 1.6 GW, +400,000 t/yr green ammonia, 90,000 t/yr H2)

Awarded to China Energy Engineering Corp. (developer-led) · Client: China Energy Engineering Corp.

Contract awardEgypt · مصرContract awarded – subcontracting open

Bapetco Obaiyed H18 horizontal gas well – Egypt's largest multistage hydraulic fracturing job (6 stages, 18 pumps >40,000 hp)

Awarded to Halliburton · Client: Badr El Din Petroleum Company (Bapetco)

Pre-qualification / EOIIndiaINR 6bnOpen – deadline not published

GAIL Ratnagiri LNG terminal (5 MTPA) – new regasification heating unit plus small captive power plant to restore full capacity (completion June 2027)

Client: GAIL (India) Ltd

Pre-qualification / EOISyria · سورياUSD 15bnOpen – deadline not published

Iraq–Syria crude export pipeline to Baniyas (up to 2M bpd, new build, ≥USD 15bn, FEED stage) – discussed at Iraqi–Syrian leaders' talks

Client: Governments of Iraq and Syria (Chevron / TI Capital / UCC Holding consortium MoU)

Pre-qualification / EOISaudi Arabia · السعوديةOpen – deadline not published

Petro Rabigh bottom-of-the-barrel upgrade – residue/high-sulphur fuel oil conversion to diesel and lighter distillates: contractors preparing bids

Client: Petro Rabigh (Rabigh Refining & Petrochemical Co., Aramco subsidiary)

Pre-qualification / EOISouth AfricaOpen – deadline not published

Gas IPP Procurement Programme bid window 1 – four bids received, none clears gas-supply requirements; bid window 1.5 to follow

Client: Department of Electricity and Energy / IPP Office

Contract awardIraq · العراقUSD 5.66bnContract awarded – subcontracting open

Common Seawater Supply Project (CSSP) phase 1 – 5M b/d oilfield water-injection pipelines & treatment plant: early groundworks under way, pipe-laying from 2027

Awarded to China Petroleum Pipeline Engineering (pipelines, USD 2.5bn); Hyundai E&C (treatment plant, USD 3.16bn) · Client: Basra Oil Company / TotalEnergies (with QatarEnergy); PMC: ILF

Contract awardMexicoContract awarded – subcontracting open

Pacifico Mexinol ~210 MW electrolyzer facility (renewable hydrogen for 6,130 t/d methanol complex) – definitive EPC agreement

Awarded to Siemens Energy / Techint Engineering & Construction · Client: Transition Industries LLC (Pacifico Mexinol)

Contract awardEthiopiaContract awarded – subcontracting open

Dangote Gode 3 Mtpa urea fertilizer complex – design, procurement, manufacture and FOB supply of two hydrogen production reformers

Awarded to Técnicas Reunidas · Client: Dangote Group

Pre-qualification / EOIEgypt · مصرUSD 585MOpen – deadline not published

Al Hamra crude terminal storage expansion from 2.5M to 5.3M barrels (USD 457M, by Dec 2026) and 317 km six-pipeline downstream expansion (USD 128M, early 2027)

Client: Egypt Ministry of Petroleum / Petroleum Pipelines Company

Contract awardUAE · الإماراتContract awarded – subcontracting open

Adnoc Gas 127 km 56-inch gas pipeline to feed AI data centre phase 2 and relocated Ewec Mirfa power assets – detailed engineering awarded to local firm

Client: ADNOC Gas

Contract awardKuwait · الكويتUSD 6.23MContract awarded – subcontracting open

KNPC Mina Al-Ahmadi refinery – replacement of FCC Unit 86 regenerator (purchase order from main contractor, 28 months)

Awarded to Heavy Engineering Industries & Shipbuilding Co. (HEISCO) · Client: Kuwait National Petroleum Company (KNPC)

Pre-qualification / EOIKuwait · الكويتUSD 2.5bnOpen – deadline not published

KOC Separation Gathering Centre SGC-1 and Water Injection Plant WIP-1 (~USD 2.5bn) – re-tender under Build-Own-Operate model considered, new bids possible Q1 2027

Client: Kuwait Oil Company (KOC)

Pre-qualification / EOISyria · سورياOpen – deadline not published

Block 26 five-well onshore drilling campaign (Khurbet East, Yousefieh, Alkhairat) – lump-sum turnkey contractors sought

Client: Dijla Petroleum Company / Gulfsands Petroleum

Open tenderAlgeria · الجزائرOpen – deadline not published

Arzew carbon dioxide utilisation plant – tender issued

Client: Sonatrach

Contract awardSaudi Arabia · السعوديةContract awarded – subcontracting open

Petro Rabigh – engineering, FEED-package and project-management services for future refining & petrochemical projects

Awarded to Worley · Client: Rabigh Refining and Petrochemical Co. (Petro Rabigh)

Contract awardUAE · الإماراتUSD 1.2bnContract awarded – subcontracting open

Adnoc Onshore Bab and North East Bab One Tie-In project – 18 EPC packages for well tie-ins (mini-pads, well bays, clusters): contractors selected

Awarded to Robt Stone Middle East; Jereh Group · Client: ADNOC Onshore

Pre-qualification / EOIIndonesiaUSD 22bnOpen – deadline not published

Abadi LNG (9.5 Mtpa) – FEED completed for SURF, gas export pipeline, FPSO and onshore LNG plant; moving to EPCI phase with FID targeted late 2026/Jan 2027

Client: INPEX Masela

Contract awardIndiaContract awarded – subcontracting open

Tata Power – dedicated 110 kV power infrastructure for BPCL Mumbai Refinery PRFCCU project

Awarded to Tata Power · Client: Bharat Petroleum Corporation Ltd (BPCL)

Contract awardOman · عُمانContract awarded – subcontracting open

PDO five-year well-intervention hoist services – 15 hoist units (9 ABRAJ, 6 Shaleem)

Awarded to ABRAJ Energy Services; Shaleem Petroleum Company · Client: Petroleum Development Oman (PDO)

Open tenderKuwait · الكويتOpen – deadline not published

Oil manifold project (originally tendered in June) – new bid submission deadline set

Client: Kuwait oil sector (client not named in public summary)

Open tenderQatar · قطرOpen – closes 22 Nov 2026 (3 days)

Construction of WOQOD fuel station at Al Sadd area (tender QF/01/C/02/1120047663/113/26; QAR 100,000 bid bond)

Client: Qatar Fuel (WOQOD)

Contract awardKuwait · الكويتKD 1.99MContract awarded – subcontracting open

KNPC Mina Al-Ahmadi refinery – consultancy for replacement of catalyst regeneration unit, flue gas cooler & related facilities (KD 1.99M)

Awarded to Lowest compliant bidder (not named) · Client: Kuwait National Petroleum Company (KNPC)

Pre-qualification / EOIIraq · العراقOpen – deadline not published

West Qurna 2 supergiant oilfield – Chevron secures 1-year exclusive negotiation to take over operatorship from Lukoil (USD 200M signing-bonus advance)

Client: Iraq Ministry of Oil

Pre-qualification / EOIKuwait · الكويتOpen – deadline not published

KOC – bids opened for 173 tenders (Oct 2026): oil-operations equipment, spares & drilling works (9 groups, lowest bids up to KD 22.86M), casing-drilling services packages A/B (KD 9.9M / 6.6M), drilling engineering & workover consultancy

Client: Kuwait Oil Company (KOC) / KPC Supreme Purchasing Committee

Contract awardChinaCNY 13.2bnContract awarded – subcontracting open

Shaanxi Yuneng coal-based epoxy resin complex Phase I – POE and epoxy resin units start main construction (CNY 13.2bn)

Awarded to Shanghai Hetu Engineering + Liuhua Construction (POE unit); Shanghai Huayi Engineering, Zhejiang Tianzheng Design + Liuhua Construction (epoxy resin unit) · Client: Shaanxi Yuneng Nenghua New Materials Co., Ltd. (Yulin Energy Group)

Pre-qualification / EOISaudi Arabia · السعوديةOpen – deadline not published

Export-oriented low-carbon fuels plant (50,000 t/yr phase 1, up to 400,000 t/yr in 3 phases) – Go Energy & Clean Energy Co/SARCO alliance, engineering design started, operation targeted Q1 2029

Client: Go Energy Group / Clean Energy Co (Ethraa Group) with SARCO

Contract awardKuwait · الكويتContract awarded – subcontracting open

KOC – unconventional reservoir characterization services, 5-year contract (Ora, OnWave, Reveal technologies)

Awarded to SLB · Client: Kuwait Oil Company (KOC)

Contract awardOman · عُمانContract awarded – subcontracting open

PDO Block 6 – integrated hydraulic fracturing services, 5-year contract (stimulation, well intervention, fracturing automation)

Awarded to SLB · Client: Petroleum Development Oman (PDO)

Contract awardSaudi Arabia · السعوديةContract awarded – subcontracting open

Aramco – four integrated well construction contracts (450+ wells, 3 yrs + 2-yr option): digital/automated drilling, evaluation, drilling fluids, cementing & completions

Awarded to SLB · Client: Saudi Aramco

Open tenderUAE · الإماراتUSD 800MOpen – deadline not published

Adnoc Onshore Bab gas cap well tie-in project – bids sought for tie-in of gas-producing and gas-injection wells (USD 800M+)

Client: ADNOC Onshore

Pre-qualification / EOIIndonesiaClosed 29 Oct 2026

Medco E&P Indonesia – blanket NDT services for SSB – prequalification (Procurement CS89176)

Client: PT Medco E & P Indonesia

Pre-qualification / EOIIndonesiaClosed 27 Oct 2026

Pertamina EP Cepu – maintenance of field instruments, ICSS, fire & gas detection and suppression, Region 4 Zona 12 – prequalification (Tender SX05000027A)

Client: JTB PT Pertamina EP Cepu

Contract awardQatar · قطرQAR 100M+ (USD 27M)Contract awarded – subcontracting open

Five-year MRO procurement services contract (sourcing, bid evaluation, POs, deliveries, warranty claims) – QAR 100M+ (USD 27M)

Awarded to Aamal Energy (Aamal Company) · Client: Local Qatari company (not named)

Contract awardZambiaUSD 1.6bnContract awarded – subcontracting open

United Capital Fertilizer complex expansion – 540,000 t/yr ammonia, 520,000 t/yr urea, 400,000 t/yr ammonium nitrate, groundbreaking held; T+EPC by CNCEC Wuhuan Engineering (USD 1.6bn)

Awarded to China Chemical Engineering Wuhuan (CNCEC) – T+EPC general contractor · Client: United Capital Fertilizer Zambia Company Ltd (Wonderful Group)

Pre-qualification / EOISaudi Arabia · السعوديةOpen – deadline not published

Aldrees fuel-station programme Q4 2026 – upgrading 81 and rebuilding 11 petrol stations (~92 sites)

Client: Aldrees Petroleum & Transport Services Co.

Pre-qualification / EOIUAE · الإماراتOpen – deadline not published

Al-Mandous underground crude storage complex expansion – Adnoc revives project after new contractor prequalification

Client: ADNOC

Contract awardKazakhstanContract awarded – subcontracting open

Ethane & propane trunk pipelines in a single corridor, Tengiz–Karabatan SEZ (~210 km each) – construction started

Awarded to CPPE (Kazakhstan) LLP / China Petroleum Pipeline Engineering-led consortium incl. CITIC Construction · Client: KMG PetroChem LLP (KazMunayGas)

Pre-qualification / EOIBangladeshBDT 5.92bnOpen – deadline not published

Drilling of two appraisal-cum-development wells Titas-32 & Titas-33 – project up for ECNEC approval, foreign drilling contractor to be engaged (BDT 592 crore)

Client: Bangladesh Gas Fields Company Ltd (BGFCL) / Petrobangla

Pre-qualification / EOIEthiopiaOpen – deadline not published

Dangote Group – planned petroleum products pipeline and tank farms on the Djibouti–Addis Ababa corridor (plus proposed Zimbabwe–Zambia corridor) under USD 50bn 2026–2030 plan

Client: Dangote Group

Contract awardNorwayContract awarded – subcontracting open

Wisting oil field – FEED for FPSO topsides with option for engineering, procurement & project management (EPma)

Awarded to Aibel · Client: Equinor (operator; partners Aker BP, Petoro, INPEX Idemitsu Norge)

Pre-qualification / EOIIraq · العراقOpen – deadline not published

Southern Iraq seawater injection project Phase 2 (2.5M bpd) – MoU signed by ExxonMobil and Basra Oil Company

Client: Basra Oil Company

Contract awardUAE · الإماراتContract awarded – subcontracting open

ADNOC Refining – refining capacity enhancement project and sustainable aviation fuel (SAF) project contracts signed with Technip Energies

Awarded to Technip Energies · Client: ADNOC Refining

Pre-qualification / EOISaudi Arabia · السعوديةOpen – deadline not published

Ras Al-Khair port sulphur handling facilities – BOOT for receiving, forming and exporting up to 9,500 t/d molten sulphur

Client: Saudi Aramco

Open tenderKuwait · الكويتUSD 3.3bnOpen – closes 29 Dec 2026 (40 days)

Al-Zour onshore gas processing plant for Dorra field (632 mmcf/d gas + 60,000 b/d condensate) – EPC tender, five contractors attend prospective-bidder meeting (USD 3.3bn)

Client: Kuwait Gulf Oil Company (KGOC)

Pre-qualification / EOIIndonesiaClosed 26 Oct 2026

Kangean Energy – EPCI onshore flowlines for wells PGR-6/7/8, onshore facilities & tie-in point, Rancak field – prequalification (20260113/11140/CON/E&P/VII/CIVD)

Client: Kangean Energy Indonesia Ltd (KEI) / SKK Migas

Contract awardIraq · العراقContract awarded – subcontracting open

Ratawi field upstream works, Gas Growth Integrated Project (USD 27bn programme) – Enka mobilises workforce on site

Awarded to Enka · Client: Gas Growth Integrated Project (GGIP), Iraq

Contract awardKuwait · الكويتContract awarded – subcontracting open

KOC five-year directional drilling, MWD and LWD services contract awarded to Weatherford

Awarded to Weatherford · Client: Kuwait Oil Company (KOC)

Pre-qualification / EOIUAE · الإماراتOpen – deadline not published

Umm Shaif Long-Term Development Plan 2.1 – two offshore EPC packages: EOI completed, early contractor engagement

Client: ADNOC Offshore

Pre-qualification / EOIBahrain · البحرينBHD 0.41MOpen – deadline not published

Bapco Refining – oil analysis & testing services for rotating and electrical equipment (transformers): 2 bids opened, lowest BHD 412,768 (Al Hawati Technical Services)

Client: Bapco Refining

Pre-qualification / EOIIndiaINR 40,000 croreOpen – deadline not published

Avaada green ammonia plant at Gopalpur, Odisha (~INR 20,000 crore, commissioning ~2030) + planned green methanol facility at Nagpur (~INR 20,000 crore)

Client: Avaada Group

Pre-qualification / EOIEgypt · مصرUSD 100–120MOpen – deadline not published

Cronos gas export route, Egyptian leg – ~40 km onshore pipeline from Zohr processing facilities (Port Said) to Damietta LNG, USD 100–120M budget, construction from early 2027

Client: Eni / TotalEnergies (Cronos field partners)

Pre-qualification / EOIAlgeria · الجزائرOpen – deadline not published

Arzew refinery Group II/III base-oil unit and Skikda ethylene petrochemical complex – four companies prequalified

Client: Algerian downstream owner (not named in public teaser; Sonatrach group)

Pre-qualification / EOIIraq · العراقOpen – deadline not published

Iraq strategic LPG storage – 16 new LPG tanks, 48,000 m³ combined capacity (Ministry of Oil review; SCOP coordinating)

Client: Ministry of Oil (Iraq) – General Company for Gas Filling and Services / State Company for Oil Projects (SCOP)

Open tenderUAE · الإماراتOpen – deadline not published

ADNOC Onshore Rumaitha & Shanayel field facilities – on-plot and off-plot facilities to sustain 45,000 b/d, contractors preparing bids

Client: ADNOC Onshore

Contract awardGhanaUSD 28bnContract awarded – subcontracting open

Petroleum Hub Phase 2 (Lot Two) – 300,000 bpsd refinery, two petrochemical plants, 4 million m3 storage & multi-berth jetty, build-operate deal signed (USD 28bn)

Awarded to Global Sphere-led consortium (South Korea, UAE, Mali partners) · Client: Petroleum Hub Development Corporation (PHDC)

Pre-qualification / EOIArgentinaUSD 2,000M (est.)Open – deadline not published

Argentina LNG – line-pipe supply tender (~USD 2bn) for two 48-inch gas pipelines + 24-inch polyduct, 527 km Vaca Muerta–Sierra Grande; bids taken 20 Oct by reverse auction, FID targeted 26 Nov

Client: Argentina LNG consortium (YPF, Eni, XRG)

Contract awardEthiopiaContract awarded – subcontracting open

Ogaden LNG Phase II (Calub gas field) – construction & toll-processing contract signed with GCL Energy and Jurong Group: new liquefaction modules, storage & transport infrastructure

Awarded to Jurong Group (Holdings) Co., Ltd. · Client: GCL Energy Investment Co. (Ethiopia branch) / Ministry of Mines

Pre-qualification / EOIUAE · الإماراتOpen – deadline not published

ADNOC new 4 Mtpa onshore LNG liquefaction facility – site visit for FEED-to-EPC contractors

Client: ADNOC

Contract awardCanadaEUR 200M+Contract awarded – subcontracting open

Coastal GasLink Phase 2 – EPCm services for five new compressor stations and facility modifications

Awarded to Técnicas Reunidas · Client: LNG Canada / Coastal GasLink

Pre-qualification / EOIGhanaOpen – deadline not published

Ghana Gas – 278 km 20-inch high-pressure gas pipeline Western Region to Tema, FID targeted end-2026

Client: Ghana National Gas Company (Ghana Gas)

Pre-qualification / EOIMozambiqueUSD 250MOpen – deadline not published

ENH gas import project – FSRUs at Inhassoro and Beira + 140 km pipeline to ROMPCO (~USD 250M), investors sought

Client: ENH (Empresa Nacional de Hidrocarbonetos)

Contract awardKuwait · الكويتKWD 18.19M (USD 59.3M)Contract awarded – subcontracting open

KOC oilfield road network maintenance – RFP-2134797 (North & West Kuwait, 48 months) and RFP-2143095 Part III (Ahmadi, South & East, 60 months)

Awarded to Kuwait Company for Process Plant Construction & Contracting (KCPC) · Client: Kuwait Oil Company (KOC)

Pre-qualification / EOIKuwait · الكويتKWD 37.0MOpen – deadline not published

KOC road network maintenance – two tenders (4 packages) for Ahmadi City and southern/eastern and northern/western fields cleared by CAPT for award (KWD 37.0M)

Client: Kuwait Oil Company (KOC)

Contract awardKuwait · الكويتKWD 18.82M (USD 61M)Contract awarded – subcontracting open

KOC road network maintenance – RFP-2143095 Packages 1 & 2 (Ahmadi township, South & East Kuwait oilfields, 5 years)

Awarded to Combined Group Contracting Co. · Client: Kuwait Oil Company (KOC)

Contract awardChinaContract awarded – subcontracting open

Sinopec Shengli Oilfield million-tonne low-concentration CCUS full-chain demonstration – construction started (flue-gas CO2 capture, 70+ injection wells, 98.8 MW wind)

Client: Sinopec Shengli Oilfield

Pre-qualification / EOISenegalEUR 530MOpen – deadline not published

RGS gas pipeline network expansion – Green (110 km), Blue (100 km) and Orange (45 km) segments, EUR 530M financing sought

Client: Réseau Gazier du Sénégal (RGS)

Pre-qualification / EOIEgypt · مصرUSD 1.5BOpen – deadline not published

Fertiglobe 1.3 Mtpa diammonium phosphate (DAP) fertilizer complex – feasibility studies under way (USD 1.5B+, operations targeted 2031)

Client: Fertiglobe

Contract awardKuwait · الكويتKWD 37.0MContract awarded – subcontracting open

KOC road network maintenance – two CAPT-approved awards worth KWD 37.0M (Ahmadi city & south/east fields in 3 groups; north/west fields)

Client: Kuwait Oil Company (KOC)

Pre-qualification / EOIKuwait · الكويتOpen – deadline not published

Maleic anhydride (MAN) production via butane oxidation – KNPC and NCPI sign MoU to localise output from Kuwaiti hydrocarbon feedstock

Client: Kuwait National Petroleum Company (KNPC) / National Chemical and Petroleum Industries (NCPI)

Contract awardLibya · ليبياContract awarded – subcontracting open

Tajoura fuel depot – BOT development with partner OLA Energy: storage expansion and infrastructure upgrade (foundation stone laid)

Client: Brega Oil Marketing Company

Pre-qualification / EOIBrazilUSD 80MOpen – deadline not published

Eneva LNG regasification terminal at Port of Pecém – floating unit up to 14 MMm³/d to supply Ceará thermal plants from the March capacity auction

Client: Eneva

Pre-qualification / EOINigeriaUSD 3.5bnOpen – deadline not published

Bonny methanol & petrochemicals complex (500 ha) – USD 3.5bn MoU signed by Best Option Chemical and CNCEC

Client: Best Option Chemical Limited (Rivers State Investment Promotion Agency facilitating)

Pre-qualification / EOILibya · ليبياOpen – deadline not published

Eraun oil field development – well rehabilitation and new drilling, 10,000 bpd early production facility, gathering pipelines and water wells

Client: Zallaf Oil Exploration and Production Company

Pre-qualification / EOIPakistanClosed 05 Nov 2026

SNGPL – prequalification for boring & installation of deep well ground beds (GM (CORR)-SNGPL/PQ/DWG/01/27, TS0000015273E)

Client: Sui Northern Gas Pipelines Ltd – Corrosion Control (Ministry of Energy, Petroleum Division)

Open tenderOman · عُمانOpen – deadline not published

Project Trade Bridge (Ras Markaz phase 1.4) – EPC of eight 650,000-bbl crude storage tanks (+5.2M bbl), main tender issued to 8 prequalified contractors

Client: Oman Tank Terminal Company (OTTCO)

Contract awardIraq · العراقUSD 800MContract awarded – subcontracting open

Al-Diwaniyah oil refinery expansion (USD 800M) – construction progressing under Al-Barham Group

Awarded to Al-Barham Group · Client: Not named in public teaser (Diwaniyah refinery expansion)

Open tenderUAE · الإماراتOpen – deadline not published

Bu Hasa Shuaiba EOR Unit 1 Phase 1 – ADNOC Onshore seeks bids

Client: ADNOC Onshore

Pre-qualification / EOIMexicoOpen – deadline not published

Pajaritos complex biorefinery (SAF / renewable diesel, 5,000 bpd) – feasibility study launched

Client: Not disclosed

Open tenderGuatemalaOpen – closes 23 Nov 2026 (4 days)

NOG 30311551 – Closure, dismantling and abandonment of Xan oil field (59 wells, processing plant, tanks, pipelines)

Client: Ministerio de Energía y Minas (MEM)

Pre-qualification / EOIIndonesiaClosed 20 Oct 2026

Pertamina EP – provision & operation of 350 HP workover/well-service rig with crew and heavy equipment, Ramba Field (SX10000140A) – prequalification

Client: PT Pertamina EP

Pre-qualification / EOIIndonesiaClosed 20 Oct 2026

Pertamina EP – provision of 350 HP drilling/workover rig, Field Pendopo (SX10000139A) and Field Bentayan (SX10000141A) – prequalification

Client: PT Pertamina EP

Contract awardIraq · العراقContract awarded – subcontracting open

Kirkuk, Bai Hassan, Khabbaz & Jambur fields – operations handed to BP-led joint operating body; targets 450,000 bpd and 500 MMscfd gas capture

Awarded to BP-led joint operating body · Client: Iraq Ministry of Oil (North Oil Company / North Gas Company)

Pre-qualification / EOIIndiaUSD 100MOpen – deadline not published

AM Green 1.1 Mtpa green ammonia conversion of former ammonia/urea plant – ADB/Japan USD 100M loan (first ACCEL investment)

Client: AM Green Ammonia (India) Pvt Ltd

Pre-qualification / EOIVietnamUSD 500MOpen – deadline not published

Long Son Petrochemicals complex upgrade – ethane-capable olefins plant modifications and feedstock storage tanks; investment raised to USD 6.156B (completion Q4 2028)

Client: Long Son Petrochemicals Co. (SCG Chemicals); approved by HCMC People's Committee

Pre-qualification / EOIKuwait · الكويتUSD 132MOpen – deadline not published

Upgrade of gas booster stations BS-140 & BS-150 – dehydration replacement, pipelines, safety system; 4 bids received, Gulf Spic lowest (KD41.2M)

Client: Kuwait Oil Company (client not named in article)

Contract awardOman · عُمانUSD 100MContract awarded – subcontracting open

Karim Small Fields concession – five-year drilling contract

Awarded to Great Wall Drilling Company (CNPC) · Client: MedcoEnergi (Karim Small Fields operator)

Contract awardSenegalContract awarded – subcontracting open

New gas pipeline supplying feedstock to gas-to-power offtakers – construction started

Client: n/d (headline only)

Pre-qualification / EOIIndonesiaClosed 20 Oct 2026

Pertamina EP – provision & operation of 350 HP workover/well-service rig with crew and heavy equipment, Field Limau & Zona 4 (Tender SX10000138A)

Client: PT Pertamina EP

Pre-qualification / EOIUnited StatesOpen – deadline not published

Gulf South Texas Gateway pipeline – ~155 mi 36/42-in, 1.8 Bcf/d, Carthage TX to SE Texas/SW Louisiana + Cleveland compressor station (FERC CP26-547, added scoping)

Client: Gulf South Pipeline Company

Contract awardCanadaCAD 2.9bnContract awarded – subcontracting open

Yellowhead natural gas pipeline – 235 km Peers to Fort Saskatchewan, 1.1 Bcf/d, construction started

Client: Canadian Utilities (ATCO)

Pre-qualification / EOIKuwait · الكويتOpen – deadline not published

Two crude oil export pipelines via Saudi Arabia and UAE bypassing the Strait of Hormuz – study stage

Client: Kuwait Oil Company (KOC)

Pre-qualification / EOIBahrain · البحرينBHD 1.66M (lowest bid)Open – deadline not published

Supply of membrane filters for Bapco Refining wastewater treatment plant – 3 bids opened at Tender Board, lowest BHD 1.66M (Veolia Water Technologies)

Client: Bapco Refining

Contract awardBahrain · البحرينContract awarded – subcontracting open

GPIC aromatics complex (1.2 Mtpa paraxylene, 0.5 Mtpa benzene) – Honeywell UOP technology licence, engineering, catalysts & equipment

Awarded to Honeywell UOP · Client: Gulf Petrochemical Industries Co. (GPIC)

Contract awardSaudi Arabia · السعوديةSAR 177MContract awarded – subcontracting open

Oil & gas steel pipe supply to Saudi Aramco – SAR 177M order (up to 12 months)

Awarded to Saudi Steel Pipe Company (SSP) · Client: Saudi Aramco

Pre-qualification / EOIGhanaUSD 700-812MOpen – deadline not published

Atuabo Gas Processing Plant Train 2 – 150 (scalable 300) MMscf/d turbo-expander NGL plant, PPP development

Client: Ghana National Gas Company (Africa Finance Corporation support)

Contract awardUnited StatesUSD 50MContract awarded – subcontracting open

Lena Road Landfill renewable natural gas facility – EPC, groundbreaking

Awarded to Mead & Hunt (EPC); Johnson Controls (design/M&V) · Client: Nopetro Energy

Contract awardIndiaEUR 250–500MContract awarded – subcontracting open

HPCL Mumbai Refinery LMBU – EPC of 550 KTA IHCD unit and 850 KTA solvent deasphalting unit

Awarded to Technip Energies · Client: Hindustan Petroleum Corporation Ltd (HPCL)

Pre-qualification / EOISaudi Arabia · السعوديةOpen – deadline not published

Saudi Arabia–Qatar energy MoU – joint ventures to be explored for oil and gas export pipelines, plus clean hydrogen, renewables and storage

Client: Saudi Ministry of Energy / Qatar Ministry of State for Energy Affairs

Pre-qualification / EOISaudi Arabia · السعوديةOpen – deadline not published

East-West crude pipeline network expansion to ~10M bpd within 3 years (+3M bpd) – pumping-capacity upgrade, gas-line dual-use conversion; international owners/operators/designers sought

Client: Ministry of Energy / Saudi Aramco

Contract awardMalaysiaContract awarded – subcontracting open

LNG cold-energy air separation unit (>600 TPD LOX/LIN/LAR) at Pengerang LNG terminal – design, build and operate

Awarded to Air Products · Client: PG Cold Energy 1 (Petronas Gas / Dialog Group JV)

Contract awardIraq · العراقContract awarded – subcontracting open

2D & 3D seismic surveys of Sasan and Alan exploration blocks – contract signed (Iraq Oil Exploration Company & KAR Group)

Client: Iraq Oil Exploration Company / KAR Group

Open tenderKuwait · الكويتOpen – deadline not published

New 24-inch sour gas export pipeline (Station 171-BS via TP-1 to the ISC gas treatment unit) – CAPT approves KOC public tender

Client: Kuwait Oil Company (KOC)

Pre-qualification / EOIUnited StatesOpen – deadline not published

Power LNG small-scale modular LNG production, storage & bunkering facility – Port of Galveston lease and development agreement approved

Client: Power LNG / Port of Galveston

Pre-qualification / EOIUnited StatesUSD 139MOpen – deadline not published

NGPL Amarillo Expansion Project – new Compressor Station 112 (4 x 5,500 hp), 321 MMcf/d firm capacity for power generation, FERC CP26-581

Client: Natural Gas Pipeline Company of America (NGPL)

Pre-qualification / EOIQatar · قطرOpen – deadline not published

Pearl GTL (140,000 boe/d) – partial restart; Train 2 war-damage repairs scheduled to complete in Q1 2027

Client: Shell (Pearl GTL, with QatarEnergy)

Pre-qualification / EOICanadaCAD 14bnOpen – deadline not published

Bay du Nord deepwater oil development – subsea tie-back to FPSO (160–175 kboe/d), FEED being finalised, FID expected early 2027; Shell takes 30% stake

Client: Equinor (70%, operator) / Shell Canada Energy (30%)

Contract awardIndiaINR 18bnContract awarded – subcontracting open

Paradip–Raipur LPG pipeline – PNGRB authorisation to Dilip Buildcon SPV; EPC proposed to Dilip Buildcon, 3-year build

Awarded to Dilip Buildcon Ltd · Client: Dilip Buildcon SPV (PNGRB authorisation, common-carrier LPG pipeline)

Pre-qualification / EOIBahrain · البحرينBHD 224,669.811 (lowest bid)Open – deadline not published

Bapco Refining – DMDS supply and injection services for catalyst change-out of hydrotreating/desulphurisation unit 2HDU during Q1 2027 turnaround: 2 bids opened, lowest BHD 224,669.811 (Akwashi)

Client: Bapco Refining (via Bahrain Tender Board)

Pre-qualification / EOIPhilippinesOpen – deadline not published

DOE first natural gas power auction – 3,800 MW mid-merit CCGT capacity (Luzon 2,900 MW, Visayas 940 MW); 10 firms prequalified/interested, bid deadline moved to Q1 2027

Client: Department of Energy (Philippines)

Pre-qualification / EOIIraq · العراقOpen – deadline not published

Qayyarah refinery (70,000 bpd) – project given regional approval

Client: Not disclosed

Contract awardMalaysiaContract awarded – subcontracting open

Five newbuild LNG carriers on 20-year charters to PETRONAS LNG – LoA accepted by MISC; shipbuilding at Hudong-Zhonghua (operations from 2030)

Awarded to MISC Berhad (shipyard: Hudong-Zhonghua Shipbuilding) · Client: PETRONAS LNG Ltd

Pre-qualification / EOIGhanaOpen – deadline not published

Asharami Ghana LPG terminal, Tema – phase 1 (6,000 t storage) commissioned; second phase to take terminal to 12,000 t

Client: Asharami Ghana (Sahara Group)

Pre-qualification / EOISouth AfricaZAR 6.9bnOpen – deadline not published

Port of Saldanha Southern Precinct – 55 ha, 25-year TNPA lease to Freeport Saldanha SEZ for ~R6.9bn investment pipeline (marine/bunkering services, manufacturing, LNG import & storage)

Client: Freeport Saldanha / Transnet National Ports Authority (TNPA)

Pre-qualification / EOIEgypt · مصرOpen – deadline not published

Aphrodite (Cyprus) gas field tie-in to Egyptian infrastructure – long-lead equipment procurement decision then FID being prepared

Client: Chevron / EGAS (Ministry of Petroleum and Mineral Resources)

Pre-qualification / EOIIraq · العراقOpen – deadline not published

North Oil Company associated-gas capture (+80 MMscfd from Bai Hassan, North Jambur, Khabbaz), North Gas Company facility expansion and planned 400 MW gas-fired power station – zero-flaring target end-2027

Client: Ministry of Oil – North Oil Company / North Gas Company

Contract awardArgentinaUSD 1.3bnContract awarded – subcontracting open

Gasoducto San Matías – 472 km, 36-inch gas pipeline (27 MMm³/d) to SESA floating LNG; pipe haul and excavation started

Awarded to n/d · Client: Southern Energy (SESA): Pan American Energy, YPF, Pampa Energía, Harbour Energy, Golar LNG

Contract awardSingaporeContract awarded – subcontracting open

LNG carrier-to-FSRU conversion (~170,000 m3, Excelerate's 13th FSRU) – full EPCIC, delivery 2028, option for second unit

Awarded to Seatrium · Client: Excelerate Energy

Contract awardUAE · الإماراتContract awarded – subcontracting open

Ruwais LNG (2 trains, 9.6 Mtpa) – supply of 600+ cryogenic ball valves (3–24 inch) for onshore liquefaction facilities

Awarded to AMPO POYAM VALVES · Client: ADNOC Gas / TJN Ruwais JV (Technip Energies, JGC, NMDC Energy)

Pre-qualification / EOICongoOpen – deadline not published

CORAF refinery (~21,000 bpd) modernisation & expansion – pre-FEED launched, SOCAR Downstream as PMC for SNPC

Client: Société Nationale des Pétroles du Congo (SNPC) / CORAF

Contract awardSaudi Arabia · السعوديةUSD 200MContract awarded – subcontracting open

Saudi Arabia's first direct lithium extraction (DLE) demonstration plant – up to 2,000 t/yr battery-grade lithium carbonate, turnkey

Awarded to National Energy Services Reunited (NESR) – NEDA segment · Client: Saudi Aramco

Contract awardBrazilBRL 1.55M (bonuses); BRL 75.7M minimum exploration programmeContract awarded – subcontracting open

ANP 6th Permanent Offer concession cycle – Eneva wins six onshore Parnaíba gas blocks (PN-T-49/84/85/86/101/102, 13,983 km²); Petrom takes PN-T-182

Awarded to Eneva; Petrom · Client: ANP (Brazil Permanent Offer – concession regime)

Contract awardKenyaUSD 300MContract awarded – subcontracting open

Dangote East Africa 700,000 bpd refinery & petrochemical complex – refining process technology, licensing, catalysts, equipment & digital solutions

Awarded to Honeywell · Client: Dangote Petroleum Refinery and Petrochemicals FZE

Pre-qualification / EOINigeriaOpen – deadline not published

2026 Nigerian Licensing Round – 40 onshore, shallow-water and deepwater oil & gas blocks offered (NUPRC)

Client: Nigerian Upstream Petroleum Regulatory Commission (NUPRC)

Contract awardEgypt · مصرContract awarded – subcontracting open

Multi-client seismic survey of under-explored Western Desert areas – awarded to a specialist firm

Awarded to Not disclosed (specialised firm) · Client: Egyptian General Petroleum Corporation (EGPC)

Contract awardSerbiaContract awarded – subcontracting open

Serbia–North Macedonia gas interconnector (1.5 bcm/yr, Vertical Gas Corridor branch) – pipe-laying on Serbian section to start week of 12 Oct, completion targeted Q1 2028

Awarded to n/d · Client: Republic of Serbia – Ministry of Mining and Energy

Open tenderGuatemalaOpen – closes 06 Apr 2027 (138 days)

PEG-6-2026 – long-term power supply tender, 600 MW firm capacity (450 MW new plants; gas, geothermal & others), contracts up to 15 years, supply from May 2032

Client: CNEE / Ministry of Energy and Mines / EEGSA & distribution companies

Contract awardThailandUSD 14.3MContract awarded – subcontracting open

Onshore petroleum block L8/66 concession – USD 14.3M minimum work commitment

Awarded to Pan Orient Energy (Siam) 70% (Dialog Group) / CanAsia Energy 30% · Client: Government of Thailand (Department of Mineral Fuels)

Contract awardJapanJPY ~50bn (Cosmo ~JPY 20bn + Iwatani ~JPY 30bn)Contract awarded – subcontracting open

Chiba refinery hydrogen supply chain – restart of ~80 t/d hydrogen plant + new 11.6 t/d liquefied hydrogen plant, FID taken, EPC by Cosmo Iwatani Hydrogen Engineering

Awarded to Cosmo Iwatani Hydrogen Engineering (JV) · Client: Cosmo Energy Holdings / Iwatani Corp.

Pre-qualification / EOILibya · ليبياOpen – deadline not published

Seven oil and gas field upgrade & development tenders – contractors preparing bids

Client: Arabian Gulf Oil Company (AGOCO)

Pre-qualification / EOISaudi Arabia · السعوديةOpen – deadline not published

Jafurah unconventional gas fifth expansion phase – EPC of three 200 MMcf/d gas compression plants: award imminent

Client: Saudi Aramco

Pre-qualification / EOIQatar · قطرOpen – deadline not published

Dukhan field facilities upgrade – 56 oil manifolds and 108 gas-lift manifold slots: revised bids submitted

Client: QatarEnergy

Contract awardSaudi Arabia · السعوديةContract awarded – subcontracting open

Marjan offshore field development – engineering & project execution services for processing facilities, gas compression and power infrastructure upgrades

Awarded to KBR · Client: Saudi Aramco

Pre-qualification / EOIMalaysiaUSD 735MOpen – deadline not published

Kedah LNG regasification import terminal (up to 6 Mtpa, USD 490–735M) – FID targeted H2 2027, operations by 2030

Client: Gas Malaysia / Tokyo Gas / VTTI

Pre-qualification / EOIBrazilOpen – deadline not published

Sergipe Águas Profundas FPSOs P-87 & P-81 – Petrobras requires 5–7 topside modules to be assembled in Brazil (SBM Offshore local-content negotiation)

Client: Petrobras

Pre-qualification / EOINigeriaUSD 10bn (reported initial investment)Open – deadline not published

Olokola LNG (OKLNG) export terminal revived – 1,728 ha site with up to three loading jetties, linked to DP World deep-sea port plans

Client: NNPC Ltd / Ogun State Government

Contract awardGhanaUSD 600MContract awarded – subcontracting open

FPSO John Agyekum Kufuor – non-associated gas modification (MG2 compression & MC4 gas treatment modules), contract amendment & extension to 2036

Awarded to Yinson Production · Client: Eni Ghana

Pre-qualification / EOILibya · ليبياUSD 600MOpen – deadline not published

South Refinery (30,000 bpd), Ubari – main EPC contract (>USD 600M, 50 months): bids submitted, under technical evaluation

Client: Zallaf Libya Oil & Gas Exploration and Production Company

Pre-qualification / EOIDjiboutiOpen – deadline not published

ATLS Doraleh petroleum products terminal – phase 1 288,000 m³ storage with direct rail loading to Djibouti–Ethiopia railway (operation June 2027), expansion to 750,000 m³

Client: African Terminal & Logistics Services (ATLS) – Hayel Saeed Anam Group

Contract awardSaudi Arabia · السعوديةContract awarded – subcontracting open

Safaniyah field water injection project – EPC contract signed (Tecnimont project delivery, CCC execution & construction)

Awarded to Tecnimont / Consolidated Contractors Company (CCC) · Client: Saudi Aramco

Pre-qualification / EOIMorocco · المغربOpen – deadline not published

African Atlantic (Nigeria–Morocco) Gas Pipeline – intergovernmental agreement signed, governance and regulatory framework set

Client: ONHYM (Morocco) / NNPC (Nigeria) and transit states

Pre-qualification / EOISouth AfricaOpen – deadline not published

Phelan Green e-SAF (electro-sustainable aviation fuel) plant, Saldanha Bay – first-wave national green hydrogen programme project, construction from Q1 2027

Client: Phelan Green

Pre-qualification / EOICanadaOpen – deadline not published

Pacific Link (West Coast Oil Pipeline) – designated project of national interest, southern route AB–BC; conditions to be finalised by Sept 2027

Client: Trans Mountain Corporation (Canada/Alberta-owned) with Pembina Pipeline

Open tenderSouth AfricaOpen – deadline not published

Port of East London – small-to-medium scale LNG terminal, 25-year concession (design, finance, build, operate, maintain) – RFP

Client: Transnet National Ports Authority (TNPA)

Pre-qualification / EOIKazakhstanOpen – deadline not published

Fourth national oil refinery (up to 10 Mtpa) – site selection by end-2026, foreign investors sought, commissioning 2033

Client: Ministry of Energy of Kazakhstan

Pre-qualification / EOIEgypt · مصرUSD 1.1bnOpen – deadline not published

Strategic oil and gas storage projects worth USD 1.1bn under implementation

Client: Government of Egypt (petroleum sector)

Pre-qualification / EOIIraq · العراقUSD 7-8bnOpen – deadline not published

Al-Faw refinery – USD 7–8bn project, progress held up by financing

Client: Government of Iraq

Open tenderQatar · قطرOpen – deadline not published

North Field West – four production deck modules (topsides) EPCI, bidding period extended

Client: QatarEnergy

Contract awardKuwait · الكويتKWD 117M (USD 379M)Contract awarded – subcontracting open

KOC GC-25 low-pressure wet separation & GC-30 treated-water filtration/HP injection facilities (500,000 bwpd nutshell filters)

Awarded to Megha Engineering & Infrastructures Ltd (MEIL) · Client: Kuwait Oil Company (KOC)

Contract awardKuwait · الكويتKWD 111.05M (USD 359M)Contract awarded – subcontracting open

KOC Jurassic Light Oil (JLO) export facilities – EPC of storage tanks, CMEI works & export network upgrade (42 months)

Awarded to Heavy Engineering Industries & Shipbuilding Co. (Heisco) · Client: Kuwait Oil Company (KOC)

Contract awardSaudi Arabia · السعوديةSAR 103MContract awarded – subcontracting open

Aramco steel pipe manufacturing & supply contracts – SAR 103M (10 months), signed 1 Oct 2026

Awarded to Arabian Pipes Co. · Client: Saudi Aramco

Contract awardKuwait · الكويتContract awarded – subcontracting open

KOC oil storage tank maintenance – five-year contract

Awarded to Mark Group · Client: Kuwait Oil Company (KOC)

Pre-qualification / EOIOman · عُمانOpen – deadline not published

Al-Ghubar field (Block 6) gas-oil gravity drainage facility – lowest bidder emerged in EPC tender

Client: Petroleum Development Oman (PDO)

Pre-qualification / EOIGabonOpen – deadline not published

Oilserv–Gabon MoU – development of DEF-3 and D4-5 blocks with gas transportation, compression & treatment infrastructure for power generation

Client: Government of Gabon

Pre-qualification / EOIOman · عُمانOpen – deadline not published

IGC gas allocation auction for compressed natural gas (CNG) projects – up to 200,000 scm/d per bidder, connection to OQ Gas Networks grid

Client: Integrated Gas Company (IGC)

Open tenderKuwait · الكويتUSD 200MOpen – closes 22 Dec 2026 (33 days)

Al-Zour LNG import terminal – boil-off gas (BOG) reliquefaction unit EPC incl. commissioning & performance testing

Client: Kuwait Integrated Petroleum Industries Company (KIPIC)

Contract awardSaudi Arabia · السعوديةContract awarded – subcontracting open

SABIC AN grassroots 3,500 t/d ammonia plant – technology licence, basic engineering, proprietary equipment & catalyst (EPC by Samsung E&A)

Awarded to KBR · Client: SABIC Agri-Nutrients

Contract awardUAE · الإماراتContract awarded – subcontracting open

Ewec sales gas pipeline – 127 km, 56-inch, for AI data centre phase 2 and Mirfa power-asset relocation – EPC award

Client: ADNOC Gas

Pre-qualification / EOISaudi Arabia · السعوديةOpen – deadline not published

Sasref refinery conversion to integrated refining & petrochemicals complex – pre-FEED/FEED under way, EPC tender in preparation

Client: Saudi Aramco

Contract awardAustraliaContract awarded – subcontracting open

Gorgon & Wheatstone LNG – NDT, inspection & asset-integrity services, extended to end-2031

Awarded to EnerMech · Client: Chevron Australia

Contract awardChinaUSD 1.6bnContract awarded – subcontracting open

Dongde Energy 100,000 tpy e-SAF project with 50,000 tpy green hydrogen and 2 GW wind – construction start

Client: Dongde Energy

Contract awardOman · عُمانContract awarded – subcontracting open

Shinas marine fuels facility (Port of Shinas) – Phase 1 FEED consultancy

Awarded to Bilfinger · Client: Shinas Marine Fuels & Oil Terminals (SMFOT)

Pre-qualification / EOIMozambiqueOpen – deadline not published

Mozambique LNG Phase 2 – TotalEnergies considering accelerated expansion using Phase 1 workforce

Client: TotalEnergies (Mozambique LNG, Area 1)

Contract awardTimor-LesteContract awarded – subcontracting open

Geotechnical & environmental baseline surveys for Greater Sunrise and Bayu-Undan pipeline routes (TLNG)

Awarded to TDI-Brooks / Taka Hydrocore Indonesia · Client: Ministry of Petroleum and Mineral Resources (MPRM), Timor-Leste

Pre-qualification / EOIOman · عُمانOpen – deadline not published

Ras Markaz crude oil storage expansion to ~10M barrels within three years (OTTC) and Vopak energy-storage JV in Duqm SEZ

Client: Oman Tank Terminal Company (OQ Group)

Pre-qualification / EOISaudi Arabia · السعوديةOpen – deadline not published

Alhada gas processing plant – expressions of interest received from contractors

Client: Saudi Aramco

Contract awardSaudi Arabia · السعوديةUSD 940MContract awarded – subcontracting open

Aramco Zuluf water treatment plant phase 2 (308,000 m³/day total) – BOOT, USD 940M

Awarded to Almar Water Solutions / Al Jomaih Energy & Water · Client: Saudi Aramco

Contract awardUAE · الإماراتUSD 7.4bnContract awarded – subcontracting open

Técnicas Reunidas wins USD 7.4bn ADNOC awards – onshore gas processing + Upper Zakum EPCI packages

Awarded to Técnicas Reunidas · Client: ADNOC

Contract awardUAE · الإماراتUSD 8.2bnContract awarded – subcontracting open

Adnoc Gas Rich Gas Development phases 2 & 3 – gas processing train & NGL fractionation EPC, USD 8.2bn

Awarded to Wison Engineering (USD 3.9bn); Tecnimont / Maire (USD 4.3bn) · Client: ADNOC Gas

Contract awardChinaLow double-digit EUR millionContract awarded – subcontracting open

Chlor-alkali plant (e-BiTAC v7) – licence, engineering, equipment supply & commissioning support

Awarded to thyssenkrupp nucera · Client: Hongniu Lanzhou Environmental Protection Technology (Jiangsu Hongniu)

Pre-qualification / EOIUnited StatesOpen – deadline not published

Rio Grande LNG Train 6 expansion – US Army Corps of Engineers permit secured

Client: NextDecade

Pre-qualification / EOIBangladeshUSD 50MOpen – deadline not published

Modern Syntex polyester chips plant expansion (107 to 407 TPD), ADB USD 50M loan signed

Client: Modern Syntex Ltd (T.K. Group)

Pre-qualification / EOICanadaOpen – deadline not published

Coastal GasLink Phase 2 – new compressor stations and upgrades on 670 km pipeline to near-double capacity

Client: TC Energy (Coastal GasLink)

Pre-qualification / EOITurkeyOpen – deadline not published

Petkim integrated petrochemical complex (1.2 Mtpa cracker + PE/PP) – licensing & FEED awarded

Client: Petkim (SOCAR)

Contract awardCanadaUSD 7.5bn (Fluor share)Contract awarded – subcontracting open

LNG Canada Phase 2 – two LNG trains + storage tank, FID & EPC notice to proceed (Fluor share USD 7.5bn)

Awarded to Fluor–JGC JV · Client: LNG Canada (Shell, Petronas, PetroChina, Mitsubishi, KOGAS)

Pre-qualification / EOIJordan · الأردنOpen – deadline not published

Aqaba marine & liquid bulk (oil) terminal – main EPC tender due early October

Client: Aqaba Development Corporation

Pre-qualification / EOISaudi Arabia · السعوديةOpen – deadline not published

Jafurah unconventional gas – sixth expansion phase, EOI round completed

Client: Saudi Aramco

Contract awardIndiaINR 4,807MContract awarded – subcontracting open

1,200 TPD cryogenic air separation unit for 2,000 TPD coal-to-ammonium nitrate project – supply & erection

Awarded to Ellenbarrie Industrial Gases Ltd · Client: Bharat Heavy Electricals Ltd (BHEL)

Contract awardUnited StatesContract awarded – subcontracting open

Argent LNG 25 mtpa export terminal – FEED contract

Awarded to Tecnimont (MAIRE) · Client: Argent LNG

Pre-qualification / EOITogoUSD 64.1MOpen – deadline not published

Lomé Petroleum Complex (COMPEL) storage expansion – 170,000 m³ additional fuel tanks, BOAD financing approved

Client: COMPEL (Lomé Petroleum Complex) – financed by BOAD

Pre-qualification / EOISerbiaUSD 600MOpen – deadline not published

Serbia gas sector programme (Trupale–Pojate & Niš–Velika Plana pipelines, underground storage, network upgrades) – World Bank USD 600M MPA approved

Client: Government of Serbia / World Bank

Contract awardSaudi Arabia · السعوديةSAR 168.8MContract awarded – subcontracting open

Steel pipe supply orders – SAR 96M (Arabian Pipes, 10 months) and SAR 72.8M oil & gas pipes (Saudi Steel Pipe, 12 months)

Awarded to Arabian Pipes Company; Saudi Steel Pipe Company · Client: Saudi Aramco

Contract awardUAE · الإماراتUSD 470M+Contract awarded – subcontracting open

Gas pipeline EPC – $470M+

Awarded to Kalpataru Projects · Client: UAE gas operator

Contract awardKenyaUSD 450MContract awarded – subcontracting open

Dangote 700,000 bpd Lamu refinery – PMC/EPCM consultancy USD 450M

Awarded to Engineers India Ltd · Client: Dangote Group

Contract awardSaudi Arabia · السعوديةContract awarded – subcontracting open

Aramco multi-year integrated well construction contracts

Awarded to SLB · Client: Saudi Aramco

Contract awardIraq · العراقContract awarded – subcontracting open

TotalEnergies GGIP – AGUP phase 2 marine warranty survey awarded (Sinopec EPC)

Awarded to New Wave Offshore Energy · Client: Sinopec / TotalEnergies / Basra Oil Co.

Contract awardOman · عُمانContract awarded – subcontracting open

Bisat-B expansion production facility – EPC + 4 yrs O&M (548 kbpd)

Awarded to SLB · Client: OQ Exploration & Production

Pre-qualification / EOIIraq · العراقOpen – deadline not published

Nahr Bin Umar field – associated-gas investment plans under review

Client: Iraq Ministry of Oil

Contract awardSaudi Arabia · السعوديةEUR 125MContract awarded – subcontracting open

SABIC AN SAN-7 fertilizer – €125M technology package

Awarded to Nextchem · Client: SABIC Agri-Nutrients

Contract awardSaudi Arabia · السعوديةUSD 3.47bnContract awarded – subcontracting open

SABIC AN ammonia & urea complex – $3.47bn EPC

Awarded to Samsung E&A · Client: SABIC Agri-Nutrients

Contract awardSaudi Arabia · السعوديةUSD 23MContract awarded – subcontracting open

SABIC olefins plant restoration – air-cooled condensers $23M

Awarded to SNT Gulf for Industry · Client: SABIC

Contract awardSaudi Arabia · السعوديةContract awarded – subcontracting open

Aramco 60-month EPC LTA – inspection, maintenance & retrofit

Awarded to Sinopec Engineering (SEG) · Client: Saudi Aramco

Contract awardSaudi Arabia · السعوديةUSD 45MContract awarded – subcontracting open

Ras Tanura refinery emergency repair EPC – $45M

Awarded to Sinopec Engineering (SEG) · Client: Saudi Aramco

Contract awardUAE · الإماراتUSD 750MContract awarded – subcontracting open

ADNOC Habshan construction contract – $750M

Awarded to Sinopec Engineering (SEG) · Client: ADNOC

Contract awardKuwait · الكويتUSD 7.2bnContract awarded – subcontracting open

KOC awarded 129 contracts worth $7.2bn in H1 2026 (flowlines, drilling, water injection)

Awarded to Multiple · Client: Kuwait Oil Company